Professional Documents
Culture Documents
Unit Auxiliary Transformers Erection ITP
Unit Auxiliary Transformers Erection ITP
ctivity
Relevant Document
Specifications
KESIR
ENGINEERING
KKS/Record No:
440-00-YG-QPH-KSR-004
Revision:
Date:
14.07.2011
POWER
PROJECTS
OVM
Notes
Visual
MATERIAL RECEPTION
Packing list
Visual
Visual
Visual
Visual
Visual
Visual
Report+Analysis
JB INSTALLATION INSPECTION
Visual
10
Visual
11
Visual
12
CLEANLINESS INSPECTION
Visual
End Of Construction
Report
13
DOCUMENTATION REVIEW
otes
Abbreviations
E : Works Execution
R
Revision
0
: Records review
Modifications
: Witness point
: Hold point
Prepared by
Zeki SERKADI
Approved by
Blent ORU
Date
14.07.2011
1/1