INSPECTION AND TEST PLAN

CCPP SAMSUN: Erection of Electrical System


Point

ctivity

Relevant Document

Specifications

KESIR
ENGINEERING

KKS/Record No:

440-00-YG-QPH-KSR-004

Revision:

Date:

14.07.2011

POWER
PROJECTS

OVM

Notes

Auxiliary Transformer Erection


1

CHECKING THE EXISTENCE OF THE LAST REVISION


OF THE APPROVED INSTALLATION DOCUMENTATION

Drawings and Documents

Visual

MATERIAL RECEPTION

Packing list

Visual

POSITION AND BOUNDARY OF THE SYSTEM


INSPECTION

General Arrangement Drawings

Visual

MAIN BODY POSITIONING INSPECTION

General Arrangement Drawings

Visual

BUSHINGS & ACCESSORIES ASSEMBLY INSPECTION

TRANSFORMER OUTLINE DRAWING

Visual

OIL FILLING & CONDITIONING INSPECTION

SHIPMENT, STORAGE AND ERECTION

Visual

OIL LEAKAGE & TIGHTENING INSPECTION

SHIPMENT, STORAGE AND ERECTION

Visual

OIL DIELECTRIC TEST - OIL ANALYSIS INSPECTION

SHIPMENT, STORAGE AND ERECTION

Report+Analysis

JB INSTALLATION INSPECTION

SHIPMENT, STORAGE AND ERECTION

Visual

10

MECHANICAL COMPLETION INSPECTION / TURN OVER


SHIPMENT, STORAGE AND ERECTION
PACKAGE

Visual

11

EARTHING CONNECTION INSPECTION

SHIPMENT, STORAGE AND ERECTION


TRANSFORMER OUTLINE DRAWING

Visual

12

CLEANLINESS INSPECTION

SHIPMENT, STORAGE AND ERECTION

Visual

End Of Construction
Report

13

DOCUMENTATION REVIEW

Inspection Document List

otes

Abbreviations
E : Works Execution

R
Revision
0

: Records review

Modifications

: Witness point

sw : Spot Witness point

: Hold point

Prepared by
Zeki SERKADI

Approved by
Blent ORU

Date
14.07.2011

1/1