Professional Documents
Culture Documents
Room Book 15
Room Book 15
Room Book 15
Room finishes
Sewage Drain
Process Drain
Utility Pendent
Condensate Drain
Temp oC
Chilled Brine
Temp oC
Chilled water
Temp oC
Cooling water
Raw Water (lph)
Process
85 C
Instrumentation
50 C
25 C
Plumbing
Compressed Air
(NCFM)
Non-Viable
No. Of Persons
Viable
EMS
System Proposed
% RH
Temp. 0C
Digital Clock
Hygiene Class
DPT
FAS
Wi-Fi
Temp / RH Indicator
Three
PAS
Single
Three
Attendance
Single
Three
CCTV
Single
Three
HVAC
On-line Particle
Counter
Door interlocking
Single
ELV System
Access Control
Card reader
Industrial Socket
Modular Socket
Lux Level
Single
Rating
or Three
(in KW)
Phase
Industrial Socket
Computer (Data)
Three
Modular Socket
Biomatric
Single
Telephone (Voice)
Quantity
Equipment Name
Room Name
Capacity
Room No.
Phase
Wall
Room finishes
Sewage Drain
Process Drain
Utility Pendent
Condensate Drain
Temp oC
Chilled Brine
Temp oC
Chilled water
Temp oC
Cooling water
Raw Water (lph)
Process
85 C
Instrumentation
50 C
25 C
Plumbing
Compressed Air
(NCFM)
Non-Viable
No. Of Persons
Viable
% RH
EMS
System Proposed
Temp. 0C
Digital Clock
Hygiene Class
DPT
FAS
Wi-Fi
Temp / RH Indicator
Three
PAS
Single
Three
Attendance
Single
Three
CCTV
Single
Three
HVAC
On-line Particle
Counter
Door interlocking
Single
ELV System
Access Control
Card reader
Industrial Socket
Modular Socket
Lux Level
Single
Rating
or Three
(in KW)
Phase
Industrial Socket
Computer (Data)
Three
Modular Socket
Biomatric
Single
Telephone (Voice)
Quantity
Equipment Name
Room Name
Capacity
Room No.
Phase
Wall
Ceiling