KP-00+++-CQ712-G0011 - Rev.A - ITP For For Cathodic Protection Works

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

No.

Item Name
Review of Technical Documents
(Drawings, Specs, Method statements etc.)

ITP No.
Rev. No.
Page

Inspection & Test Plan


for Cathodic Protection Works

HM Corrosion Co.
Inspection & Test
Activity

Inspection & Test


Description

Application
Document/Code/Spec. No.

Document Review

Document Review

KP-00B__-EE210-G6005
KP-00B__-EE350-G6005

Visiual and
Dimensional
Inspection

Visiual and
Dimensional
Inspection
Installation
Finalization Check
and Testing
Installation
Finalization Check
and Testing

Material Receiving Inspection & test Ceritificate Review


(Cable, anode, Junction Box , rectifier& Transformer )

Installation & Testing of Anodes

Check and Test

Installation & Testing of Reference Electrodes

Check and Test

Installation of Junction Boxes

Check and Test

Installation
Finalization Check

Installation of Transformer Rectifier

Check and Test

Installation
Finalization Check

Document review and submission of documentation

Document Review

Document Review

KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012
KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012
KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012
KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012
KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012
KP-00B__-EE210-G6005
KP-00B__-EE350-G6005
KP-00+++-CY712-G0012

Inspection Status
3rd Party POSCO
/AI
E&C

GAMA

Site Handover Protocol

Notes) #1

Legend

HM Corrosion Co.

Document Submittal

Subcon
tractor

Owner

KP-00+++-CQ712-G0011
A
2 of 7
Remarks

Site Construction Dossier

P
H
W
S
O
V
R

Perform
Hold Point
Witness Point
Spot Witness
Observation
Surveillance
Report Review