COMMENT SHEET

Khabat Thermal Power Plant Units 1&2 and Bazyan Substation


POSCO Letter No.

Date

ILF/HG Comment Sheet No.

Rev.

Date

KP-POH-MOH-L-0934

03.05.2014

KP-00+++-CQ712-G0006_ILF-CS-0414

12.05.2014

Drawing / Document Number


KP-00+++-CQ712-G0006

MOE Letter No.

Date

Drawing / Document Title

Revision No.

Issued Date

Inspection and Test Plan for Electrical Works


(UnderGround and AboveGround Earthing Works)

03.05.2014

Owner
Contractor
No
Consultant (ILF/ Hanmi-Global)s Comment
Ministry of Electricity
POSCO E&C
1.
It is recommended to submit Inspection and
No commentas whole for all Electrical
Testing1.
Program(ITP)
Comment
2.
Proceed and incorporate the comments
CodesEquipment and Works as single submittal for
3.
Resubmit
ILF/HanmiGlobal
review and approval.
Reviewed by Consultant: ILF / HanmiGlobal

Owners Consultant
Latest Date to be Returned
GAMAs Comments
POSCOs Commnet
HanmiGlobal (ILF)
Comment Code
GAMA Reply to POSCO on 15.05.2014:
POSCO comments on
Please be informed that, Inspection and Test May.17.2014:
Plan for 132kV AIS Substation Installation and
Inspection and Test Plan for Electrical Works Noted.
Date
submissions Replied
have been
by planned.
EPC Contractor GAMA to POSCO E&C
Reviewed

2.

Item 1.2, POSCO E&C / sub-contractor shall obtain


approval for material from ILF/HanmiGlobal at site
works.

GAMA Reply to POSCO on 10.06.2014:


ITP revised

3.

Sec.3.1, Earthing wire continuity check & Insulation


resistance check: please include Witness point for
ILF/HanmiGlobal

GAMA Reply to POSCO on 10.06.2014:


ITP revised

4.

Electrical Works(Underground and Aboveground


Earthing Works) Inspection Checklist Template:
Please include ILF/HanmiGlobal/ 3rd Party in
witness signature column.

GAMA Reply to POSCO on 03.06.2014:


In addition to the previous GAMAs reply on
15.05.2014, please be informed that this request
is not in-line with the Inspection and Test Report
format attached to the KP-00+++-MQ732-G0010
_Site Document Control Procedure which has
been Approved by POSCO.

Page 1 of 2

Date
Reply

COMMENT SHEET
Khabat Thermal Power Plant Units 1&2 and Bazyan Substation
POSCO Letter No.

Date

ILF/HG Comment Sheet No.

Rev.

Date

KP-POH-MOH-L-0934

03.05.2014

KP-00+++-CQ712-G0006_ILF-CS-0414

12.05.2014

Drawing / Document Number


KP-00+++-CQ712-G0006

MOE Letter No.

Date

Drawing / Document Title

Revision No.

Issued Date

Inspection and Test Plan for Electrical Works


(UnderGround and AboveGround Earthing Works)

03.05.2014

Remarks:
Comments given in this Comment Sheet are for technical clarification only, and have no commercial impact.
The approval of the document does not release the EPC Contractor from his Contractual obligations.