FMP Production Schedule Updated - Music Video

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

FMP SCHEDULE

PRODUCTION TITLE
Week
No

Week
Beginning

Day
Monday
Tuesday

14th March

Wednesday
Thursday

EASTER
1

21st March

28th March

Friday
Weekend
Monday
Tuesday
Wednesday
Thursday
Friday
Weekend
Monday
Tuesday
Wednesday
Thursday
Friday

SNBRN - Beat The Sunrise Music Video

Activity

EASTER
2

4th April

Weekend

Kirsty Pickett

Notes

Start scripting out the narrative of the music video by annotating the lyrics of
the song.
Start location scouting research and find out the locations needed for the
video.
Location scouting Go out and check the locations to make sure they are
suited to the specific scene.
Location scouting Go out and check the locations to make sure they are
suited to the specific scene.
Finalise location decisions and start Location Recces.
Location Recces and Risk Assessments.
Location Recces and Risk Assessments.
Cast & Crew Meeting and Call Sheets.
Call Sheets.
Storyboarding & Shot Listing.
Storyboarding & Shot Listing.
Storyboarding & Shot Listing.

EASTER

Over the Easter Break, I will make sure to finalise all of the
Pre-Production paperwork in order to be completely
prepared to start filming in the first week back. One major
thing that I will plan over this break is the costume design
for the video and the props needed.
I will also create and finalise my viral marketing schedule so
that I know when teasers and vlogs need to be uploaded.
This will help me work to specific deadlines for all parts of
this production.

Weekend
Monday
Tuesday
Wednesday
Thursday
Friday

Studen
t
Name:

EASTER
GOOD FRIDAY COLLEGE CLOSED

Monday
Tuesday
Wednesday
Thursday
Friday
Weekend

BANK HOLIDAY MONDAY COLLEGE CLOSED


Finalise all of the storyboards and shot lists.
Finalise all of the storyboards and shot lists.
Make sure all of the pre-production paper work is
completed and change any thing if needed.
Final Cast and Crew Meeting and gathering equipment.
Saturday Making sure all of the equipment is
ready and pre production work is up to date.

Location: Shearwater Lake

11th April

18th April

Sunday Filming Day 1

Props Needed:

-Glow Sticks
-Back Pack
Meet time at location - 7:45pm
-Polaroid Camera
Start Filming at 8:15pm
(This may vary depending on the time the sun -Picnic Blanket
sets)
Wrap Time 9:15pm
Equipment Needed:
(This may also vary if we are delayed with
- Canon 700D
filming due to the sun setting)
- 50mm f1.8 Lens
-Artificial Light
- Tripod
- Steadicam

Monday
Tuesday
Wednesday
Thursday

Import Footage and review.


Finalise Shot List and Storyboards for next shoot.
Shot list overview with Camera Operator and gathering
equipment.

Filming Day 2
Meet time at location 8:15pm
Start Filming at 8:30pm
Wrap Time 9:30pm

Location: Bedroom (for


intro)
Props Needed:
-

Back Pack
Dr. Martin Boots
Jacket
Phone

Equipment Needed:
- Canon 700D
- 50mm f1.8 Lens
-Artificial Light
- Tripod
- Steadicam
Friday

Review Footage.

Location: Bedroom (for


outro)
Props Needed:
Sunday Filming Day 3
Weekend

Meet time at location 8:15pm


Start Filming at 8:30pm
Wrap Time 9:00pm

Back Pack
Dr. Martin Boots
Jacket
Alarm

Equipment Needed:
- Canon 700D
- 50mm f1.8 Lens
-Artificial Light
- Tripod
- Steadicam

7
8

25th April

2nd May

9th May

Monday
Tuesday
Wednesday
Thursday
Friday
Weekend
Monday
Tuesday
Wednesday
Thursday
Friday
Weekend
Monday
Tuesday

Import Footage and review.


Review Footage.
Start Editing Intro.
Edit Intro.
Edit.
Editing.
Editing.
Editing.
Editing.
Editing.
Editing and making sure all paperwork is up to date.
Editing.
Editing.

Wednesday
Thursday
Friday

Location: Heavens Gate


Saturday Filming Day 4
Meet Time at Location 8:35pm
Start Filming at 8:50pm
Wrap Time 9:20pm
(These times may vary depending on the time the
sun sets)

Props Needed:

- Back Pack
- Polariod Camera

Equipment Needed:
- Canon 700D
- 50mm f1.8 Lens
-Artificial Light
- Tripod
- Steadicam

Location: Weymouth Beach

Weekend

Props Needed:
Sunday Filming Day 5
Meet Time at Base 7pm
Arrive Time at Location 8:30pm
Start Filming at 8:45pm
Wrap Time 10pm
Back to Base Time 11:30pm

10

16th May

Monday

Filming Day 6
Meet time at location 8:00pm
Start Filming at 8:15pm
Wrap Time 9:15pm

Back Pack
Glow Sticks
Polaroid Camera
Car

Equipment Needed:
- Canon 700D
- 50mm f1.8 Lens
-Artificial Light x2
- Tripod
- Steadicam

Location: Car (will be


parked outside my house
for shoot)

Props Needed:
-

Scrapbook
Pens
Decorative Tape
Polaroid Pictures

Equipment Needed:
- Canon 700D
- 50mm f1.8 Lens
-Artificial Light
- Tripod
- Steadicam
Tuesday
Wednesday
Thursday
Friday
Weekend

Editing.
Editing.
Finishing Touches and Evaluation.

DEADLINE!

You might also like