Summary Project

Descriptions
Project

Description

NairobiMombasa

O&M concession of following


stretches of highway:
1. Xxx
2. Xxx
Widening of following stretches of
highway under DBFOM concession:
3. Xxx
4. Xxx
Tolling

NairobiNakuru

Widening of entire length of


highway under DBFOM concession,
including elevated sections at
Nakuru under DBFOM concession
Possible inclusion of Gitaru-Rironi
section
Possible inclusion of B3/C88 and
improvements
Tolling

NairobiThika

O&M concession of existing as built


highway
Modest capex additions
Tolling

Southern

O&M concession of existing as built

Project length, km

Projec
t
capex,
$k

Conce
ssion
period

174.9 Km (widening of Rironi-Mau


Summit including elevated sections)
+
57.2 km (Strengthening, O&M of
B3/C88) + 12.4 km (O&M of GitaruRironi)

670,00
0

29
years

Land acquisition
Project

Quantu
m of
land to
acquire
d, ha

%
public

% private
residenti
al

% private
commerci
al

%
othe
r
(spe
cify)

Estimated
value,
Shsm

Current status of
land acquisition

1060

Work
under
progre
ss at
site

Work
under
progress
at site

Work under
progress at
site

Work
unde
r
progr
ess
at
site

7600

Land Acquisition
plans under
preparation

NairobiMombasa
NairobiNakuru

NairobiThika
Southern
Bypass
Nyali
Bridge

Resettlement
Project

Estimated
# people
affected

Estimated
#
structure
s affected

Estimated
cost of
resettlement,
Shsm

Current status of resettlement


planning

PAP survey
under
progress

454

112.5

RAP under progress

Nairobi-Mombasa
Nairobi-Nakuru

Nairobi-Thika
Southern Bypass
Nyali Bridge

Likely Tolling rollout


Projec
t
Nairobi
Momba
sa
Nairobi
Nakuru
Nairobi
-Thika
Southe
rn
Bypass
Nyali
Bridge

Location of Toll Collection


Points

Proposed technology/
system

Likely date of
opening/ first
charging