Professional Documents
Culture Documents
Pengairan Analisa
Pengairan Analisa
Pengairan Analisa
NO
I
1
2
3
4
UPAH KERJA :
Mandor
Kepala Tukang
Tukang
Pekerja
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
JENIS BAHAN
Batu
Pasir Pasang
Pasir Beton
Semen PC / 50 Kg
Semen PC / 40 Kg
Kerikil Beton ( pecahan 2 -3 cm)
Tanah urug
Kawat galvanis d 4 mm
Kayu bekesting
Paku
Besi beton
Kawat beton / bendrat
Rumput gebal
Pintu Air type C2 ( B = 1000 mm )
( H = 1000 mm, H' = 3240 mm )
Pintu Air type C3 ( B = 400 mm )
( H = 800 mm, H' = 200 mm )
Pintu Air type C5 ( B = 200 mm )
( H = 500 mm, H' = 500 mm )
15
16
III
1
2
3
4
5
6
7
JENIS ALAT
Palu
Ganco
Meteran ( 50 m )
Keranjang
Ember
Jack hamer
Kereta Dorong
SATUAN
Orang/hari
Orang/hari
Orang/hari
Orang/hari
HARGA
(Rp)
72,500.00
55,500.00
50,500.00
40,500.00
M3
M3
M3
Kg
Kg
M3
M3
Kg
Kg
Kg
Kg
Kg
M2
Bh
158,820.00
152,500.00
158,820.00
67,000.00
62,500.00
134,390.00
63,590.00
15,000.00
2,541,710.00
17,300.00
12,500.00
21,810.00
10,900.00
22,400,280.00
Bh
11,495,900.00
Bh
1,996,501.00
Bh
Bh
Bh
Bh
Bh
Bh
Unit
70,900.00
59,990.00
152,720.00
19,090.00
13,630.00
105,810.00
490,880.00
Page 6
NO
8
9
10
11
12
13
14
15
16
17
18
SATUAN
Bh
Unit
Bh
Bh/hr
Bh/hr
Bh
Bh
Unit
Bh
Bh
Bh
HARGA
(Rp)
21,810.00
38,180.00
13,500.00
218,170.00
54,540.00
21,810.00
88,350.00
43,630.00
58,900.00
88,290.00
29,975.00
Page 6
BIDANG PSDA
1. PEKERJAAN PENGUKURAN
1.1.1. Pengukuran Bendung untuk MC
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
m3
kg
kg
0.012
0.120
0.050
HARGA SATUAN
(Rp)
BAHAN
Patok kayu Uk.4x6x50 Cm
Cat meni
Paku usuk
0.00
0.00
0.00
TOTAL
II TENAGA
Juru ukur
Pekerja
Org/hr
Org/hr
1.500
4.500
0.00
0.00
TOTAL
III ALAT
Pesawat ukur
Meteran
Palu/ Bodem
unit
bh
bh
1.000
0.030
0.060
0.00
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
m3
kg
kg
0.012
0.120
0.050
HARGA SATUAN
(Rp)
BAHAN
Patok kayu Uk. 4 x 6 x 50 Cm
Cat meni
Paku usuk
0.00
0.00
0.00
TOTAL
II TENAGA
Juru ukur
Pekerja
Org/hr
Org/hr
2.000
6.000
0.00
0.00
TOTAL
III ALAT
Pesawat ukur
Meteran
Palu/ Bodem
unit
bh
bh
2.000
0.045
0.090
0.00
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
m3
kg
kg
0.002
0.020
0.010
HARGA SATUAN
(Rp)
BAHAN
Patok kayu Uk. 4 x 6 x 50 Cm
Cat meni
Paku usuk
0.00
0.00
0.00
TOTAL
II TENAGA
Juru ukur
Pekerja
Org/hr
Org/hr
0.250
0.750
0.00
0.00
TOTAL
BIDANG PSDA
III ALAT
Pesawat ukur
Meteran
Palu/ Bodem
unit
bh
bh
0.250
0.020
0.030
0.00
0.00
0.00
TOTAL
JUMLAH
BIDANG PSDA
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BIDANG PSDA
0.00
0.00
0.00
0.00
0.00
BIDANG PSDA
2. PEKERJAAN PEMBONGKARAN
2.2.1. Pendongkelan rumpun bambu
NO
URAIAN PEKERJAAN
II TENAGA
Mandor
Pekerja
SATUAN
KOEFISIENT
Org/hr
Org/hr
0.045
1.327
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
III ALAT
Ganco
Keranjang
Unit
bh
0.050
0.225
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
m3
0.900
HARGA SATUAN
(Rp)
TOTAL
BAHAN
Tanah urug
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.054
1.575
TOTAL
III ALAT
Ganco
Keranjang
Kereta dorong
Pemadat timbunan ( Vibro roller/stamper)
bh
bh
bh
0.050
0.225
0.042
unit/m3
0.900
URAIAN PEKERJAAN
II TENAGA
Mandor
Pekerja
SATUAN
KOEFISIENT
Org/hr
Org/hr
0.400
3.000
HARGA SATUAN
(Rp)
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
III ALAT
Gergaji
Ganco
Sabit
bh
bh
bh
0.034
0.050
0.040
2.2.4. Pendongkelan pohon keling > 0.75 dan menimbun kembali bekas dongkelan
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
m3
1.200
HARGA SATUAN
(Rp)
TOTAL
BAHAN
Tanah urug
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.412
3.330
TOTAL
III ALAT
Gergaji
Ganco
Sabit besar
Pemadat timbunan ( Vibro roller/stamper)
Kereta dorong / alat angkut
bh
bh
bh
0.034
0.050
0.040
0.00
0.00
0.00
0.00
0.00
0.00
unit/m3
bh
1.200
0.042
0.00
0.00
0.00
0.00
BIDANG PSDA
TOTAL
0.00
JUMLAH
0.00
BIDANG PSDA
URAIAN PEKERJAAN
SATUAN
KOEFISIENT
lbr
bh
kg
0.400
1.600
0.370
BAHAN
Gedek
Bambu
Kawat
HARGA SATUAN
(Rp)
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Kepala Tukang Kayu
Tukang kayu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.038
0.005
0.046
1.037
TOTAL
III ALAT
Alat pelancip/pisau besar
Bodem
Keranjang
Harga satuan pekerjaan per - m
unit
bh
bh
0.080
0.030
0.040
URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja
SATUAN
KOEFISIENT
Org/hr
Org/hr
0.205
2.048
HARGA SATUAN
(Rp)
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II ALAT
Bodem
Keranjang
Harga satuan pekerjaan per - m
bh
bh
0.010
0.083
URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja
SATUAN
KOEFISIENT
Org/hr
Org/hr
0.007
0.134
HARGA SATUAN
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II ALAT
Bodem
Keranjang
Harga satuan pekerjaan per - m3
bh
bh
TOTAL
0.001
0.003
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja
SATUAN KOEFISIEN
Org/hr
Org/hr
HARGA SATUAN
(Rp)
0.024
0.720
72,500.00
40,500.00
1,740.00
29,160.00
30,900.00
19,090.00
954.50
954.50
TOTAL
II
ALAT
Keranjang
bh
0.050
TOTAL
(Rp)
TOTAL
Harga satuan pekerjaan per - m3
JUMLAH
31,854.50
URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja
SATUAN
KOEFIEN
Org/hr
Org/hr
0.023
0.638
HARGA SATUAN
(Rp)
72,500.00
40,500.00
1,667.50
25,839.00
27,506.50
19,090.00
43,630.00
2,386.25
7,286.21
9,672.46
TOTAL
II
ALAT
Keranjang
Timbris
bh
unit
0.125
0.167
TOTAL
(Rp)
TOTAL
Harga satuan pekerjaan per - m3
JUMLAH
37,178.96
URAIAN PEKERJAAN
SATUAN
KOEFIEN
m3
1.200
HARGA SATUAN
(Rp)
BAHAN
Tanah urug
63,590.00
76,308.00
76,308.00
72,500.00
40,500.00
1,305.00
20,209.50
21,514.50
19,090.00
490,880.00
43,630.00
2,386.25
27,489.28
7,286.21
37,161.74
TOTAL
II
TOTAL
(Rp)
TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.018
0.499
TOTAL
III ALAT
Keranjang
Kereta dorong
Timbris
bh
unit
unit
0.125
0.056
0.167
TOTAL
JUMLAH
134,984.24
Page 4
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
Batu kali
Portland cement (50 kg)
m3
zak
1.200
3.257
Pasir pasang
m3
0.522
HARGA SATUAN
(Rp)
BAHAN
158,820.00
67,000.00
190,584.00
218,219.00
152,500.00
79,605.00
488,408.00
72,500.00
55,500.00
50,500.00
40,500.00
10,440.00
5,328.00
48,480.00
116,640.00
180,888.00
218,170.00
13,630.00
38,180.00
36,434.39
2,276.21
419.98
39,130.58
TOTAL
II
TOTAL
(Rp)
TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.144
0.096
0.960
2.880
TOTAL
III ALAT
Molen
Ember
Kotak adukan
unit
bh
bh
0.167
0.167
0.011
TOTAL
JUMLAH
708,426.58
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
zak
0.105
0.008
BAHAN
Portland cement (50 kg)
Pasir pasang
HARGA SATUAN
(Rp)
67,000.00
7,035.00
152,500.00
1,220.00
8,255.00
72,500.00
55,500.00
50,500.00
40,500.00
1,232.50
666.00
5,807.50
14,013.00
21,719.00
13,630.00
21,810.00
13,500.00
136.30
436.20
2,254.50
2,827.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.017
0.012
0.115
0.346
TOTAL
III ALAT
Ember
Cetok
Kuas
bh
bh
bh
0.010
0.020
0.167
TOTAL
TOTAL
(Rp)
JUMLAH
32,801.00
URAIAN PEKERJAAN
BAHAN
Portland cement (50 kg)
Pasir pasang
SATUAN
KOEFISIEN
zak
0.163
0.019
HARGA SATUAN
(Rp)
67,000.00
10,921.00
152,500.00
2,897.50
13,818.50
72,500.00
55,500.00
1,377.50
1,054.50
TOTAL
II
TENAGA
Mandor
Kepala tukang
Org/hr
Org/hr
0.019
0.019
TOTAL
(Rp)
Page 5
BIDANG PEMBANGUNAN
Tukang batu
Pekerja
Org/hr
Org/hr
0.190
0.384
50,500.00
40,500.00
9,595.00
15,552.00
27,579.00
13,630.00
58,900.00
38,180.00
449.79
589.00
381.80
1,420.59
TOTAL
III ALAT
Ember
Kasut baja
Kotak adukan
bh
bh
bh
0.033
0.010
0.010
TOTAL
JUMLAH
42,818.09
Page 5
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
1.000
19.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 4 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.024
0.704
0.026
1.382
0.576
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.010
0.010
TOTAL
JUMLAH
0.00
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
0.000
19.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 4 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.024
0.704
0.026
1.382
0.576
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.010
0.010
TOTAL
JUMLAH
0.00
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
1.000
11.000
HARGA SATUAN
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 3 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TOTAL
(Rp)
TENAGA
Mandor pengisi
Org/hr
0.024
BIDANG PEMBANGUNAN
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam
Org/hr
Org/hr
Org/hr
Org/hr
0.704
0.026
1.382
0.576
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.010
0.010
TOTAL
JUMLAH
0.00
BIDANG PEMBANGUNAN
3.3.10. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) dengan batu lama
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
0.000
11.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 3 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.024
0.704
0.026
1.382
0.576
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.010
0.010
TOTAL
JUMLAH
0.00
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
bh
1.500
1.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 3 mm fabrikasi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.036
0.000
0.000
2.073
0.000
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.000
0.015
TOTAL
JUMLAH
0.00
3.3.12. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) fabrikasi dengan batu lama
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
bh
0.000
1.000
HARGA SATUAN
(Rp)
BAHAN
Batu kali
Kawat Galvanis d = 3 mm fabrikasi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TOTAL
(Rp)
TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Org/hr
Org/hr
Org/hr
Org/hr
0.036
0.000
0.000
2.073
BIDANG PEMBANGUNAN
Pekerja penganyam
Org/hr
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Tang pemotong kawat
Palu / bodem
bh
bh
0.000
0.015
TOTAL
JUMLAH
0.00
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
SATUAN
KOEFISIEN
m3
1.000
0.00
Pasir cor/beton
Portland cement (50 kg)
m
zak
0.500
5.000
0.00
0.00
BAHAN
3
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.240
0.040
0.400
4.800
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Molen
Ember
Vibrator
Kotak adukan
bh
bh
bh
bh
0.200
0.010
0.200
0.012
0.00
0.00
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
SATUAN
KOEFISIEN
m3
0.960
0.00
Pasir cor/beton
Portland cement (50 kg)
m
zak
0.480
5.970
0.00
0.00
BAHAN
3
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.240
0.040
0.400
4.800
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Molen
Ember
Vibrator
Kotak adukan
bh
bh
bh
bh
0.200
0.010
0.200
0.012
0.00
0.00
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
Kayu bekesting
m3
0.040
Paku
0.400
HARGA SATUAN
(Rp)
BAHAN
3
0.00
0.00
TOTAL
BIDANG PEMBANGUNAN
II
TENAGA
Mandor
Kepala tukang
Tukang kayu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.010
0.048
0.480
0.576
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Palu / bodem
Gergaji
bh
bh
0.010
0.010
0.00
0.00
TOTAL
JUMLAH
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
1.100
HARGA SATUAN
(Rp)
BAHAN
Kayu bekesting
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang kayu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.240
0.480
4.800
4.800
0.00
0.00
0.00
0.00
TOTAL
III
ALAT
Palu / bodem
Gergaji
bh
bh
0.050
0.034
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
BAHAN
Besi beton
Kawat beton
SATUAN
KOEFISIEN
kg
kg
110.000
2.000
HARGA SATUAN
(Rp)
0.00
0.00
TOTAL
II
TENAGA
Tukang besi
Mandor
Pekerja
Org/hr
Org/hr
Org/hr
8.640
2.880
8.640
0.00
0.00
0.00
TOTAL
III
ALAT
Gunting pemotong baja
Kunci pembengkok tulangan
bh
bh
0.020
0.010
0.00
0.00
TOTAL
JUMLAH
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
SATUAN
KOEFISIEN
m3
1.000
0.00
m
kg
7.000
100.000
0.00
0.00
TOTAL
Harga satuan pekerjaan per - m3
JUMLAH
4.4.7. Beton bertulang K.175 untuk jembatan orang dan jembatan kendaraan
NO
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
HARGA SATUAN
BIDANG PEMBANGUNAN
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
1.000
100.000
0.00
0.00
m2
10.000
0.00
(Rp)
TOTAL
Harga satuan pekerjaan per - m
JUMLAH
BIDANG PEMBANGUNAN
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
BIDANG PEMBANGUNAN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BIDANG PEMBANGUNAN
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
TOTAL
BIDANG PEMBANGUNAN
(Rp)
0.00
0.00
0.00
0.00
0.00
BIDANG PEMBANGUNAN
NO
I
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
HARGA SATUAN
(Rp)
BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balk
Besi plate
Besi plate strip
Besi beton
Pipa
kg
kg
kg
kg
kg
kg
kg
382.00
0.00
0.00
94.00
57.00
18.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
2. Bahan-bantu konstruksi
10.00 TOTAL
kg
kg
kg
kg
kg
0.00
69.00
23.00
36.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok Besar
Drucklager kecil
Seal
Kayu balau
Naf + ring kecil
kg
kg
bh
bh
bh
bh
bh
m3
bh
5.00
15.00
1.00
2.00
2.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
TOTAL
II
ONGKOS KERJA
1 Ongkos kerja konstruksi
2 Ongkos kerja mesin
kg
kg
552.00
128.00
0.00
0.00
m3
0.00
0.00
12.32
0.00
0.00
0.00
TOTAL
III
PEMASANGAN
kg
IV
PEMBONGKARAN
kg
TRANSPORT
kg
618.00
3,250.00
2,500.00
618.00
2,500.00
JUMLAH
BIDANG PEMBANGUNAN
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balk
Besi plate
Besi plate strip
Besi beton
Pipa besi
SATUAN
kg
kg
kg
kg
kg
kg
kg
KOEFISIEN
HARGA SATUAN
(Rp)
151.00
0.00
0.00
26.00
36.00
12.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
2. Bahan-bantu konstruksi
10.00 TOTAL
kg
kg
kg
kg
kg
0.00
39.00
16.00
36.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok
Drucklager kecil
Seal
Kayu balau
Naf + ring
kg
kg
bh
bh
bh
bh
bh
5.00
11.00
1.00
2.00
2.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
bh
0.00
1.00
0.00
0.00
TOTAL
II ONGKOS KERJA
Ongkos kerja konstruksi
Ongkos kerja mesin
kg
kg
214.34
90.50
0.00
0.00
m3
0.00
0.00
6.00
0.00
0.00
0.00
TOTAL
III
PEMASANGAN
kg
310.00
3,250.00
IV
PEMBONGKARAN
kg
0.00
2,500.00
TRANSPORT
kg
310.00
2,500.00
JUMLAH
BIDANG PEMBANGUNAN
URAIAN PEKERJAAN
BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balok
Besi plate
Besi plate strip
Besi beton
Pipa
SATUAN
kg
kg
kg
kg
kg
kg
kg
KOEFISIEN
HARGA SATUAN
(Rp)
30.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
4.00
5.00
TOTAL
2. Bahan-bantu konstruksi
kg
kg
kg
kg
kg
10.00 TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok
Drucklager kecil/besar
Seal
Kayu balau
Naf + ring
kg
kg
bh
bh
bh
bh
bh
2.00
4.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
bh
0.00
0.00
0.00
0.00
TOTAL
II ONGKOS KERJA
1 Ongkos kerja konstruksi
2 Ongkos kerja mesin
kg
kg
54.00
0.00
0.00
0.00
m3
0.00
0.00
1.68
0.00
0.00
0.00
TOTAL
III
PEMASANGAN
kg
50.00
3,250.00
IV
PEMBONGKARAN
kg
0.00
2,500.00
TRANSPORT
kg
50.00
2,500.00
JUMLAH
BIDANG PEMBANGUNAN
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,008,500.00
0.00
1,545,000.00
3,553,500.00
BIDANG PEMBANGUNAN
BIDANG PEMBANGUNAN
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
750,202.48
0.00
0.00
0.00
0.00
750,202.48
1,007,500.00
0.00
775,000.00
2,532,702.48
BIDANG PEMBANGUNAN
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130,231.00
0.00
130,231.00
162,500.00
0.00
125,000.00
417,731.00
BIDANG PSDA
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
0.055
2.198
HARGA SATUAN
(Rp)
TOTAL
(Rp)
I BAHAN
3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.029
0.012
0.116
0.581
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
bh
bh
0.050
0.050
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
0.071
2.826
HARGA SATUAN
(Rp)
TOTAL
(Rp)
I BAHAN
3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.037
0.015
0.149
0.744
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
bh
bh
0.053
0.053
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
TOTAL
(Rp)
SATUAN
KOEFISIEN
m3
0.086
0.00
0.00
m3
3.454
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
I BAHAN
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.046
0.018
0.182
0.912
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
Harga satuan pekerjaan per - m'
bh
bh
0.056
0.056
BIDANG PSDA
URAIAN PEKERJAAN
HARGA SATUAN
(Rp)
TOTAL
(Rp)
SATUAN
KOEFISIEN
m3
0.124
0.00
0.00
m3
4.145
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
I BAHAN
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.066
0.026
0.263
1.315
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
bh
bh
0.059
0.059
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
0.221
11.050
m3
5.526
HARGA SATUAN
(Rp)
TOTAL
(Rp)
I BAHAN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.119
0.048
0.477
2.386
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
bh
bh
0.063
0.063
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
kg
0.345
17.250
m3
6.908
HARGA SATUAN
(Rp)
TOTAL
(Rp)
I BAHAN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.186
0.075
0.746
3.730
TOTAL
III ALAT
Linggis
Kayu pemikul & tampar
Harga satuan pekerjaan per - m'
bh
bh
0.067
0.067
BIDANG PSDA
NO
I
URAIAN PEKERJAAN
BAHAN
Sabun
SATUAN
KOEFISIEN
Kg
0.050
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.003
0.000
0.000
0.150
TOTAL
III
ALAT
0.000
0.000
0.000
Harga satuan pekerjaan per - m2
9.9.2.
Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting ) dengan tingkat
kebersihan Sa. 21/2.
NO
I
URAIAN PEKERJAAN
BAHAN
Pasir silika
BBM
SATUAN
KOEFISIEN
Kg
Ltr
40.000
10.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.500
0.800
1.600
0.150
TOTAL
III
ALAT
Kompresor, blasting pot, selang dan nozzle
hr
1.000
TOTAL
0.00
JUMLAH
0.00
URAIAN PEKERJAAN
BAHAN
Meni besi
SATUAN
KOEFISIEN
Kg
0.100
HARGA SATUAN
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.010
0.020
0.200
0.020
TOTAL
III
ALAT
Kuas
Harga satuan pekerjaan per - m2
bh
TOTAL
(Rp)
0.010
BIDANG PSDA
9.9.4. Mengecat permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat mutakhir , t = 200 um
NO
I
URAIAN PEKERJAAN
BAHAN
Cat
SATUAN
KOEFISIEN
Kg
0.300
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.006
0.012
0.060
0.006
TOTAL
III
ALAT
Kuas
bh
0.010
9.9.5. Mengecat permukaan baja lapis seng (galbani) secara manual sistem 3 lapis cat konvensionan , t = 200 um
NO
I
URAIAN PEKERJAAN
BAHAN
Cat dasar
Cat antara
Cat penutup
SATUAN
KOEFISIEN
Kg
Kg
Kg
0.110
0.170
0.080
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.200
0.300
0.800
0.500
TOTAL
III
ALAT
Kuas
bh
0.010
URAIAN PEKERJAAN
BAHAN
Plamir
Cat dasar
Cat penutup 2 x
SATUAN
KOEFISIEN
Kg
Kg
Kg
0.100
0.100
0.260
HARGA SATUAN
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.0025
0.0063
0.063
0.020
TOTAL
III
ALAT
Kuas
Harga satuan pekerjaan per - m2
bh
TOTAL
(Rp)
0.010
BIDANG PSDA
URAIAN PEKERJAAN
BAHAN
Solar
SATUAN
KOEFISIEN
ltr
0.500
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Operator semi terampil
Mekanik semi terampil
Org/hr
Org/hr
0.042
0.042
TOTAL
III
ALAT
Pompa air
unit
0.042
URAIAN PEKERJAAN
BAHAN
Ijuk
SATUAN
KOEFISIEN
kg
2.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.010
0.100
TOTAL
III
ALAT
0.000
Harga satuan pekerjaan per - m2
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
bh
1.000
20.000
HARGA SATUAN
(Rp)
TOTAL
(Rp)
BAHAN
Pasir uruk
Karung plastik
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
JUMLAH
0.00
TOTAL
II
TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.010
0.288
TOTAL
III
ALAT
Keranjang
0.050
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m3
1.000
HARGA SATUAN
(Rp)
BAHAN
Bambu bongkotan
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
II
TENAGA
Mandor
Kepala tukang kayu
Tukang kayu
Pekerja
Org/hr
Org/hr
Org/hr
Org/hr
0.087
0.032
0.317
1.552
TOTAL
III
TOTAL
(Rp)
ALAT
Tripot
Timbris
Palu / Bodem
unit/hr
unit/hr
bh
0.015
0.015
0.015
TOTAL
BIDANG PSDA
JUMLAH
0.00
BIDANG PSDA
URAIAN PEKERJAAN
SATUAN
KOEFISIEN
m2
1.000
HARGA SATUAN
(Rp)
BAHAN
Gebalan rumput
0.00
TOTAL
II
TENAGA
Mandor
Pekerja
Org/hr
Org/hr
0.010
0.144
0.00
0.00
TOTAL
III
ALAT
Tusuk bambu
Gerobak
bh
bh
0.020
0.005
0.00
0.00
TOTAL
JUMLAH
BIDANG PSDA
TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00