Pengairan Analisa

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40

DAFTAR UPAH KERJA DAN HARGA BAHAN

NO

JENIS UPAH KERJA / BAHAN

I
1
2
3
4

UPAH KERJA :
Mandor
Kepala Tukang
Tukang
Pekerja

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14

JENIS BAHAN
Batu
Pasir Pasang
Pasir Beton
Semen PC / 50 Kg
Semen PC / 40 Kg
Kerikil Beton ( pecahan 2 -3 cm)
Tanah urug
Kawat galvanis d 4 mm
Kayu bekesting
Paku
Besi beton
Kawat beton / bendrat
Rumput gebal
Pintu Air type C2 ( B = 1000 mm )
( H = 1000 mm, H' = 3240 mm )
Pintu Air type C3 ( B = 400 mm )
( H = 800 mm, H' = 200 mm )
Pintu Air type C5 ( B = 200 mm )
( H = 500 mm, H' = 500 mm )

15
16

III
1
2
3
4
5
6
7

JENIS ALAT
Palu
Ganco
Meteran ( 50 m )
Keranjang
Ember
Jack hamer
Kereta Dorong

SATUAN

Orang/hari
Orang/hari
Orang/hari
Orang/hari

HARGA
(Rp)
72,500.00
55,500.00
50,500.00
40,500.00

M3
M3
M3
Kg
Kg
M3
M3
Kg
Kg
Kg
Kg
Kg
M2
Bh

158,820.00
152,500.00
158,820.00
67,000.00
62,500.00
134,390.00
63,590.00
15,000.00
2,541,710.00
17,300.00
12,500.00
21,810.00
10,900.00
22,400,280.00

Bh

11,495,900.00

Bh

1,996,501.00

Bh
Bh
Bh
Bh
Bh
Bh
Unit

70,900.00
59,990.00
152,720.00
19,090.00
13,630.00
105,810.00
490,880.00
Page 6

NO
8
9
10
11
12
13
14
15
16
17
18

JENIS UPAH KERJA / BAHAN


Cetok
Kotak Adukkan
Kuas
Molen
Vibrator
Tang pemotong kawat
Gergaji
Timbris
Kasutan baja
Gunting pemotong baja
Kunci pembengkok tulangan

SATUAN
Bh
Unit
Bh
Bh/hr
Bh/hr
Bh
Bh
Unit
Bh
Bh
Bh

HARGA
(Rp)
21,810.00
38,180.00
13,500.00
218,170.00
54,540.00
21,810.00
88,350.00
43,630.00
58,900.00
88,290.00
29,975.00

Page 6

BIDANG PSDA

1. PEKERJAAN PENGUKURAN
1.1.1. Pengukuran Bendung untuk MC
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

m3
kg
kg

0.012
0.120
0.050

HARGA SATUAN
(Rp)

BAHAN
Patok kayu Uk.4x6x50 Cm
Cat meni
Paku usuk

0.00
0.00
0.00
TOTAL

II TENAGA
Juru ukur
Pekerja

Org/hr
Org/hr

1.500
4.500

0.00
0.00
TOTAL

III ALAT
Pesawat ukur
Meteran
Palu/ Bodem

unit
bh
bh

1.000
0.030
0.060

0.00
0.00
0.00
TOTAL

Harga satuan pekerjaan per - Bh

JUMLAH

1.1.2. Pengukuran saluran untuk MC


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

m3
kg
kg

0.012
0.120
0.050

HARGA SATUAN
(Rp)

BAHAN
Patok kayu Uk. 4 x 6 x 50 Cm
Cat meni
Paku usuk

0.00
0.00
0.00
TOTAL

II TENAGA
Juru ukur
Pekerja

Org/hr
Org/hr

2.000
6.000

0.00
0.00
TOTAL

III ALAT
Pesawat ukur
Meteran
Palu/ Bodem

unit
bh
bh

2.000
0.045
0.090

0.00
0.00
0.00
TOTAL

Harga satuan pekerjaan per - Km

JUMLAH

1.1.3. Pengukuran bangunan untuk MC


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

m3
kg
kg

0.002
0.020
0.010

HARGA SATUAN
(Rp)

BAHAN
Patok kayu Uk. 4 x 6 x 50 Cm
Cat meni
Paku usuk

0.00
0.00
0.00
TOTAL

II TENAGA
Juru ukur
Pekerja

Org/hr
Org/hr

0.250
0.750

0.00
0.00
TOTAL

BIDANG PSDA

III ALAT
Pesawat ukur
Meteran
Palu/ Bodem

unit
bh
bh

0.250
0.020
0.030

0.00
0.00
0.00
TOTAL

Harga satuan pekerjaan per - Bh

JUMLAH

BIDANG PSDA

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BIDANG PSDA

0.00
0.00
0.00
0.00
0.00

BIDANG PSDA

2. PEKERJAAN PEMBONGKARAN
2.2.1. Pendongkelan rumpun bambu
NO

URAIAN PEKERJAAN

II TENAGA
Mandor
Pekerja

SATUAN

KOEFISIENT

Org/hr
Org/hr

0.045
1.327

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00
0.00

0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
III ALAT
Ganco
Keranjang

Unit
bh

0.050
0.225

Harga satuan pekerjaan per - m2


2.2.2. Pendongkelan rumpun bambu dan menimbun kembali bekas dongkelan
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

m3

0.900

HARGA SATUAN
(Rp)

TOTAL

BAHAN
Tanah urug

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.054
1.575
TOTAL

III ALAT
Ganco
Keranjang
Kereta dorong
Pemadat timbunan ( Vibro roller/stamper)

bh
bh
bh

0.050
0.225
0.042

unit/m3

0.900

Harga satuan pekerjaan per - m3


2.2.3. Pendongkelan pohon keling > 0.75
NO

URAIAN PEKERJAAN

II TENAGA
Mandor
Pekerja

SATUAN

KOEFISIENT

Org/hr
Org/hr

0.400
3.000

HARGA SATUAN
(Rp)

TOTAL

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
TOTAL

0.00
0.00
0.00
0.00

JUMLAH

0.00

TOTAL
III ALAT
Gergaji
Ganco
Sabit

bh
bh
bh

0.034
0.050
0.040

Harga satuan pekerjaan per - batang

2.2.4. Pendongkelan pohon keling > 0.75 dan menimbun kembali bekas dongkelan
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

m3

1.200

HARGA SATUAN
(Rp)

TOTAL

BAHAN
Tanah urug

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
II TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.412
3.330
TOTAL

III ALAT
Gergaji
Ganco
Sabit besar
Pemadat timbunan ( Vibro roller/stamper)
Kereta dorong / alat angkut

bh
bh
bh

0.034
0.050
0.040

0.00
0.00
0.00

0.00
0.00
0.00

unit/m3
bh

1.200
0.042

0.00
0.00

0.00
0.00

BIDANG PSDA

Harga satuan pekerjaan per - batang

TOTAL

0.00

JUMLAH

0.00

BIDANG PSDA

2.2.5. Pembuatan dan pembongkaran kistdam dengan tinggi > 1m


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIENT

lbr
bh
kg

0.400
1.600
0.370

BAHAN
Gedek
Bambu
Kawat

HARGA SATUAN
(Rp)

TOTAL

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
TOTAL

0.00
0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Kepala Tukang Kayu
Tukang kayu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.038
0.005
0.046
1.037
TOTAL

III ALAT
Alat pelancip/pisau besar
Bodem
Keranjang
Harga satuan pekerjaan per - m

unit
bh
bh

0.080
0.030
0.040

2.2.6. Bongkaran Pasangan Batu Kali & Dibersihkan


NO
I

URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja

SATUAN

KOEFISIENT

Org/hr
Org/hr

0.205
2.048

HARGA SATUAN
(Rp)

TOTAL

0.00
0.00

0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II ALAT
Bodem
Keranjang
Harga satuan pekerjaan per - m

bh
bh

0.010
0.083

2.2.7. Bongkaran pasangan lining plat beton & dibersihkan


NO
I

URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja

SATUAN

KOEFISIENT

Org/hr
Org/hr

0.007
0.134

HARGA SATUAN
(Rp)
0.00
0.00

0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II ALAT
Bodem
Keranjang
Harga satuan pekerjaan per - m3

bh
bh

TOTAL

0.001
0.003

BIDANG PEMBANGUNAN

1. PEKERJAAN TANAH GALIAN


1.1.1. Galian tanah biasa langsung untuk timbunan/dibuang
No
I

URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja

SATUAN KOEFISIEN
Org/hr
Org/hr

HARGA SATUAN
(Rp)

0.024
0.720

72,500.00
40,500.00

1,740.00
29,160.00
30,900.00

19,090.00

954.50
954.50

TOTAL
II

ALAT
Keranjang

bh

0.050

TOTAL
(Rp)

TOTAL
Harga satuan pekerjaan per - m3

JUMLAH

31,854.50

1.1.2. Timbunan tanah kembali dipadatkan ( manual )


NO
I

URAIAN PEKERJAAN
TENAGA
Mandor
Pekerja

SATUAN

KOEFIEN

Org/hr
Org/hr

0.023
0.638

HARGA SATUAN
(Rp)
72,500.00
40,500.00

1,667.50
25,839.00
27,506.50

19,090.00
43,630.00

2,386.25
7,286.21
9,672.46

TOTAL
II

ALAT
Keranjang
Timbris

bh
unit

0.125
0.167

TOTAL
(Rp)

TOTAL
Harga satuan pekerjaan per - m3

JUMLAH

37,178.96

1.1.3. Timbunan tanah dari luar dipadatkan dan dirapikan ( manual )


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFIEN

m3

1.200

HARGA SATUAN
(Rp)

BAHAN
Tanah urug

63,590.00

76,308.00
76,308.00

72,500.00
40,500.00

1,305.00
20,209.50
21,514.50

19,090.00
490,880.00
43,630.00

2,386.25
27,489.28
7,286.21
37,161.74

TOTAL
II

TOTAL
(Rp)

TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.018
0.499
TOTAL

III ALAT
Keranjang
Kereta dorong
Timbris

bh
unit
unit

0.125
0.056
0.167
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

134,984.24

Page 4

BIDANG PEMBANGUNAN

2. ANALISA BIAYA PEKERJAAN PASANGAN


2.2.1. Pasangan batu kali spesi 1Pc : 4Psr
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

Batu kali
Portland cement (50 kg)

m3
zak

1.200
3.257

Pasir pasang

m3

0.522

HARGA SATUAN
(Rp)

BAHAN
158,820.00
67,000.00

190,584.00
218,219.00

152,500.00

79,605.00
488,408.00

72,500.00
55,500.00
50,500.00
40,500.00

10,440.00
5,328.00
48,480.00
116,640.00
180,888.00

218,170.00
13,630.00
38,180.00

36,434.39
2,276.21
419.98
39,130.58

TOTAL
II

TOTAL
(Rp)

TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.144
0.096
0.960
2.880
TOTAL

III ALAT
Molen
Ember
Kotak adukan

unit
bh
bh

0.167
0.167
0.011
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

708,426.58

2.2.2. Siaran spesi 1Pc : 2Psr


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

zak

0.105

0.008

BAHAN
Portland cement (50 kg)
Pasir pasang

HARGA SATUAN
(Rp)
67,000.00

7,035.00

152,500.00

1,220.00
8,255.00

72,500.00
55,500.00
50,500.00
40,500.00

1,232.50
666.00
5,807.50
14,013.00
21,719.00

13,630.00
21,810.00
13,500.00

136.30
436.20
2,254.50
2,827.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.017
0.012
0.115
0.346
TOTAL

III ALAT
Ember
Cetok
Kuas

bh
bh
bh

0.010
0.020
0.167
TOTAL

Harga satuan pekerjaan per - m2

TOTAL
(Rp)

JUMLAH

32,801.00

2.2.3. Plesteran Tebal 1,5 cm dg spesi 1Pc : 3Psr


NO
I

URAIAN PEKERJAAN
BAHAN
Portland cement (50 kg)
Pasir pasang

SATUAN

KOEFISIEN

zak

0.163

0.019

HARGA SATUAN
(Rp)
67,000.00

10,921.00

152,500.00

2,897.50
13,818.50

72,500.00
55,500.00

1,377.50
1,054.50

TOTAL
II

TENAGA
Mandor
Kepala tukang

Org/hr
Org/hr

0.019
0.019

TOTAL
(Rp)

Page 5

BIDANG PEMBANGUNAN
Tukang batu
Pekerja

Org/hr
Org/hr

0.190
0.384

50,500.00
40,500.00

9,595.00
15,552.00
27,579.00

13,630.00
58,900.00
38,180.00

449.79
589.00
381.80
1,420.59

TOTAL
III ALAT
Ember
Kasut baja
Kotak adukan

bh
bh
bh

0.033
0.010
0.010
TOTAL

Harga satuan pekerjaan per - m

JUMLAH

42,818.09

Page 5

BIDANG PEMBANGUNAN

3. ANALISA BIAYA PEKERJAAN BROJONG


3.3.7. Bronjong kawat galvanis d = 4 mm ( 0,50 x 1,00 x 2,00 )
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
kg

1.000
19.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 4 mm

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
II

TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.024
0.704
0.026
1.382
0.576
TOTAL

III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.010
0.010
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

3.3.8. Bronjong kawat galvanis d = 4 mm ( 0,50 x 1,00 x 2,00 ) batu lama


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
kg

0.000
19.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 4 mm

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
II

TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.024
0.704
0.026
1.382
0.576
TOTAL

III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.010
0.010
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

3.3.9. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 )


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
kg

1.000
11.000

HARGA SATUAN
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 3 mm

0.00
0.00

0.00
0.00
0.00

0.00

0.00

TOTAL
II

TOTAL
(Rp)

TENAGA
Mandor pengisi

Org/hr

0.024

BIDANG PEMBANGUNAN

Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam

Org/hr
Org/hr
Org/hr
Org/hr

0.704
0.026
1.382
0.576

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.010
0.010
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

BIDANG PEMBANGUNAN

3.3.10. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) dengan batu lama
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
kg

0.000
11.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 3 mm

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
II

TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.024
0.704
0.026
1.382
0.576
TOTAL

III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.010
0.010
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

3.3.11. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) fabrikasi


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
bh

1.500
1.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 3 mm fabrikasi

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
II

TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi
Pekerja penganyam

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.036
0.000
0.000
2.073
0.000
TOTAL

III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.000
0.015
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

3.3.12. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) fabrikasi dengan batu lama
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
bh

0.000
1.000

HARGA SATUAN
(Rp)

BAHAN
Batu kali
Kawat Galvanis d = 3 mm fabrikasi

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

TOTAL
II

TOTAL
(Rp)

TENAGA
Mandor pengisi
Tukang penganyam
Mandor penganyam
Pekerja pengisi

Org/hr
Org/hr
Org/hr
Org/hr

0.036
0.000
0.000
2.073

BIDANG PEMBANGUNAN

Pekerja penganyam

Org/hr

0.000

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

TOTAL
III

ALAT
Tang pemotong kawat
Palu / bodem

bh
bh

0.000
0.015
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

0.00

BIDANG PEMBANGUNAN

4. ANALISA BIAYA PEKERJAAN BETON


4.4.1. Beton K.125
NO
I

URAIAN PEKERJAAN

HARGA SATUAN
(Rp)

SATUAN

KOEFISIEN

Batu koral beton

m3

1.000

0.00

Pasir cor/beton
Portland cement (50 kg)

m
zak

0.500
5.000

0.00
0.00

BAHAN
3

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.240
0.040
0.400
4.800

0.00
0.00
0.00
0.00
TOTAL

III

ALAT
Molen
Ember
Vibrator
Kotak adukan

bh
bh
bh
bh

0.200
0.010
0.200
0.012

0.00
0.00
0.00
0.00
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

4.4.2. Beton K. 175


NO
I

URAIAN PEKERJAAN

HARGA SATUAN
(Rp)

SATUAN

KOEFISIEN

Batu koral beton

m3

0.960

0.00

Pasir cor/beton
Portland cement (50 kg)

m
zak

0.480
5.970

0.00
0.00

BAHAN
3

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.240
0.040
0.400
4.800

0.00
0.00
0.00
0.00
TOTAL

III

ALAT
Molen
Ember
Vibrator
Kotak adukan

bh
bh
bh
bh

0.200
0.010
0.200
0.012

0.00
0.00
0.00
0.00
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

4.4.3. Bekesting kayu termasuk pembongkaran


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

Kayu bekesting

m3

0.040

Paku

0.400

HARGA SATUAN
(Rp)

BAHAN
3

0.00
0.00
TOTAL

BIDANG PEMBANGUNAN

II

TENAGA
Mandor
Kepala tukang
Tukang kayu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.010
0.048
0.480
0.576

0.00
0.00
0.00
0.00
TOTAL

III

ALAT
Palu / bodem
Gergaji

bh
bh

0.010
0.010

0.00
0.00
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

BIDANG PEMBANGUNAN

4.4.4. Perancah kayu bekesting termasuk pembongkaran


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3

1.100

HARGA SATUAN
(Rp)

BAHAN
Kayu bekesting

0.00
TOTAL

II

TENAGA
Mandor
Kepala tukang
Tukang kayu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.240
0.480
4.800
4.800

0.00
0.00
0.00
0.00
TOTAL

III

ALAT
Palu / bodem
Gergaji

bh
bh

0.050
0.034

0.00
0.00
TOTAL

Harga satuan pekerjaan per - m3

JUMLAH

4.4.5. Besi tulangan untuk beton struktur


NO
I

URAIAN PEKERJAAN
BAHAN
Besi beton
Kawat beton

SATUAN

KOEFISIEN

kg
kg

110.000
2.000

HARGA SATUAN
(Rp)
0.00
0.00
TOTAL

II

TENAGA
Tukang besi
Mandor
Pekerja

Org/hr
Org/hr
Org/hr

8.640
2.880
8.640

0.00
0.00
0.00
TOTAL

III

ALAT
Gunting pemotong baja
Kunci pembengkok tulangan

bh
bh

0.020
0.010

0.00
0.00
TOTAL

Harga satuan per - 100 kg


Harga satuan pekerjaan per - kg

JUMLAH

4.4.6. Boton K.125 untuk plat pelayanan dan titian


NO
I

URAIAN PEKERJAAN

HARGA SATUAN
(Rp)

SATUAN

KOEFISIEN

4.4.1. Beton K.125

m3

1.000

0.00

4.4.3. Bekesting kayu termasuk pembongkaran


4.4.5. Besi tulangan untuk beton struktur

m
kg

7.000
100.000

0.00
0.00

ANALISA BIAYA PEKERJAAN


2

TOTAL
Harga satuan pekerjaan per - m3

JUMLAH

4.4.7. Beton bertulang K.175 untuk jembatan orang dan jembatan kendaraan
NO

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

HARGA SATUAN

BIDANG PEMBANGUNAN
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

4.4.2. Beton K. 175


4.4.5. Besi tulangan untuk beton struktur

m3
kg

1.000
100.000

0.00
0.00

4.4.3. Bekesting kayu termasuk pembongkaran

m2

10.000

0.00

(Rp)

ANALISA BIAYA PEKERJAAN

TOTAL
Harga satuan pekerjaan per - m

JUMLAH

BIDANG PEMBANGUNAN

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00

BIDANG PEMBANGUNAN

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BIDANG PEMBANGUNAN

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00

TOTAL

BIDANG PEMBANGUNAN

(Rp)
0.00
0.00
0.00
0.00
0.00

BIDANG PEMBANGUNAN

5. ANALISA BIAYA PEKERJAAN PINTU AIR


5.5.1. Pintu air type C2, ( B = 1000 mm, H = 1000 mm, H' = 3240 mm )

NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

HARGA SATUAN
(Rp)

BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balk
Besi plate
Besi plate strip
Besi beton
Pipa

kg
kg
kg
kg
kg
kg
kg

382.00
0.00
0.00
94.00
57.00
18.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL

2. Bahan-bantu konstruksi

10.00 TOTAL

3. Bahan dikerjakan mesin


Besi bulat st 42
Besi bulat st 60
Bronze
Besi cor
Baja cor

kg
kg
kg
kg
kg

0.00
69.00
23.00
36.00
0.00

0.00
0.00
0.00
0.00
0.00
TOTAL

4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok Besar
Drucklager kecil
Seal
Kayu balau
Naf + ring kecil

kg
kg
bh
bh
bh
bh
bh
m3
bh

5.00
15.00
1.00
2.00
2.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
1.00
TOTAL

II

ONGKOS KERJA
1 Ongkos kerja konstruksi
2 Ongkos kerja mesin

kg
kg

552.00
128.00

0.00
0.00

3 Ongkos kerja kayu

m3

0.00

0.00

4 Sandblasting & cat

12.32

0.00

5 Pengecatan tanpa sand

0.00

0.00
TOTAL

III

PEMASANGAN

kg

IV

PEMBONGKARAN

kg

TRANSPORT

kg

Harga satuan pekerjaan per - Bh

618.00

3,250.00
2,500.00

618.00

2,500.00
JUMLAH

BIDANG PEMBANGUNAN

BIDANG PEMBANGUNAN

5.5.2. Pintu air type C3, ( B = 400mm; H = 800mm; H' = 2000mm )


NO
I

URAIAN PEKERJAAN
BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balk
Besi plate
Besi plate strip
Besi beton
Pipa besi

SATUAN

kg
kg
kg
kg
kg
kg
kg

KOEFISIEN

HARGA SATUAN
(Rp)

151.00
0.00
0.00
26.00
36.00
12.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL

2. Bahan-bantu konstruksi

10.00 TOTAL

3. Bahan dikerjakan mesin


Besi bulat st 42
Besi bulat st 60
Bronze
Besi cor
Baja cor

kg
kg
kg
kg
kg

0.00
39.00
16.00
36.00
0.00

0.00
0.00
0.00
0.00
0.00
TOTAL

4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok
Drucklager kecil
Seal
Kayu balau
Naf + ring

kg
kg
bh
bh
bh
bh
bh

5.00
11.00
1.00
2.00
2.00
1.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3
bh

0.00
1.00

0.00
0.00
TOTAL

II ONGKOS KERJA
Ongkos kerja konstruksi
Ongkos kerja mesin

kg
kg

214.34
90.50

0.00
0.00

Ongkos kerja kayu

m3

0.00

0.00

Sandblasting & cat

6.00

0.00

Pengecatan tanpa sand

0.00

0.00
TOTAL

III

PEMASANGAN

kg

310.00

3,250.00

IV

PEMBONGKARAN

kg

0.00

2,500.00

TRANSPORT

kg

310.00

2,500.00

Harga satuan pekerjaan per - Bh

JUMLAH

BIDANG PEMBANGUNAN

5.5.3. Pintu air type C5, ( B = 200mm; H = 500mm; H' = 500mm )


NO
I

URAIAN PEKERJAAN
BAHAN
1. Bahan Konstruksi
Besi siku
Besi kanal
Besi balok
Besi plate
Besi plate strip
Besi beton
Pipa

SATUAN

kg
kg
kg
kg
kg
kg
kg

KOEFISIEN

HARGA SATUAN
(Rp)

30.00
6.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

9.00
4.00
5.00
TOTAL

2. Bahan-bantu konstruksi

3. Bahan dikerjakan mesin


Besi bulat st 42
Besi bulat st 60
Bronze
Besi cor
Baja cor

kg
kg
kg
kg
kg

10.00 TOTAL

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
TOTAL

4. Bahan-bahan lain
Mur baut 1/2", 5/8", 7/8"
Paku keling 3/4", 5/8", 7/8"
Nipple
Splite pen
Gembok
Drucklager kecil/besar
Seal
Kayu balau
Naf + ring

kg
kg
bh
bh
bh
bh
bh

2.00
4.00
0.00
1.00
1.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3
bh

0.00
0.00

0.00
0.00
TOTAL

II ONGKOS KERJA
1 Ongkos kerja konstruksi
2 Ongkos kerja mesin

kg
kg

54.00
0.00

0.00
0.00

3 Ongkos kerja kayu

m3

0.00

0.00

4 Sandblasting & cat

1.68

0.00

5 Pengecatan tanpa sand

0.00

0.00
TOTAL

III

PEMASANGAN

kg

50.00

3,250.00

IV

PEMBONGKARAN

kg

0.00

2,500.00

TRANSPORT

kg

50.00

2,500.00

Harga satuan pekerjaan per - Bh

JUMLAH

BIDANG PEMBANGUNAN

TOTAL
(Rp)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
2,008,500.00
0.00
1,545,000.00
3,553,500.00

BIDANG PEMBANGUNAN

BIDANG PEMBANGUNAN

TOTAL
(Rp)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
750,202.48
0.00
0.00
0.00
0.00
750,202.48
1,007,500.00
0.00
775,000.00
2,532,702.48

BIDANG PEMBANGUNAN

TOTAL
(Rp)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130,231.00
0.00
130,231.00
162,500.00
0.00
125,000.00
417,731.00

BIDANG PSDA

7. ANALISA BIAYA PEKERJAAN GORONG - GORONG


7.7.1. Gorong-gorong beton d = 0,30 m ( K.175 ) tebal 5 cm
NO

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

4.4.2. Beton K. 175

m3

0.055

4.4.3. Bekesting kayu termasuk pembongkaran

2.198

HARGA SATUAN
(Rp)

TOTAL
(Rp)

I BAHAN
3

0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.029
0.012
0.116
0.581
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar

bh
bh

0.050
0.050

Harga satuan pekerjaan per - m'


7.7.2. Gorong-gorong beton d = 0,40 m ( K.175 ) tebal 5 cm
NO

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

4.4.2. Beton K. 175

m3

0.071

4.4.3. Bekesting kayu termasuk pembongkaran

2.826

HARGA SATUAN
(Rp)

TOTAL
(Rp)

I BAHAN
3

0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.037
0.015
0.149
0.744
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar

bh
bh

0.053
0.053

Harga satuan pekerjaan per - m'


7.7.3. Gorong-gorong beton d = 0,50 m ( K.175 ) tebal 5 cm
NO

URAIAN PEKERJAAN

HARGA SATUAN
(Rp)

TOTAL
(Rp)

SATUAN

KOEFISIEN

4.4.2. Beton K. 175

m3

0.086

0.00

0.00

4.4.3. Bekesting kayu termasuk pembongkaran

m3

3.454

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

I BAHAN

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.046
0.018
0.182
0.912
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar
Harga satuan pekerjaan per - m'

bh
bh

0.056
0.056

BIDANG PSDA

7.7.4. Gorong-gorong beton d = 0,60 m ( K.175 ) tebal 6 cm


NO

URAIAN PEKERJAAN

HARGA SATUAN
(Rp)

TOTAL
(Rp)

SATUAN

KOEFISIEN

4.4.2. Beton K. 175

m3

0.124

0.00

0.00

4.4.3. Bekesting kayu termasuk pembongkaran

m3

4.145

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

I BAHAN

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.066
0.026
0.263
1.315
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar

bh
bh

0.059
0.059

Harga satuan pekerjaan per - m'


7.7.5. Gorong-gorong beton d = 0,80 m ( K.175 ) tebal 8 cm
NO

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

6.6.4. Beton K. 225


4.4.5. Besi tulangan untuk beton struktur

m3
kg

0.221
11.050

4.4.3. Bekesting kayu termasuk pembongkaran

m3

5.526

HARGA SATUAN
(Rp)

TOTAL
(Rp)

I BAHAN
0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.119
0.048
0.477
2.386
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar

bh
bh

0.063
0.063

Harga satuan pekerjaan per - m'


7.7.6. Gorong-gorong beton d = 1,00 m ( K.175 ) tebal 10 cm
NO

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

6.6.4. Beton K. 225


4.4.5. Besi tulangan untuk beton struktur

m3
kg

0.345
17.250

4.4.3. Bekesting kayu termasuk pembongkaran

m3

6.908

HARGA SATUAN
(Rp)

TOTAL
(Rp)

I BAHAN
0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
TOTAL

0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II TENAGA
Mandor
Kepala tukang
Tukang batu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.186
0.075
0.746
3.730
TOTAL

III ALAT
Linggis
Kayu pemikul & tampar
Harga satuan pekerjaan per - m'

bh
bh

0.067
0.067

BIDANG PSDA

9. ANALISA PEKERJAAN CAT


9.9.1.

Mengerok karat cat lama permukaan baja dengan cara manual

NO
I

URAIAN PEKERJAAN
BAHAN
Sabun

SATUAN

KOEFISIEN

Kg

0.050

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
TOTAL

0.00
0.00
0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.003
0.000
0.000
0.150
TOTAL

III

ALAT
0.000
0.000
0.000
Harga satuan pekerjaan per - m2

9.9.2.

Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting ) dengan tingkat
kebersihan Sa. 21/2.

NO
I

URAIAN PEKERJAAN
BAHAN
Pasir silika
BBM

SATUAN

KOEFISIEN

Kg
Ltr

40.000
10.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.500
0.800
1.600
0.150
TOTAL

III

ALAT
Kompresor, blasting pot, selang dan nozzle

hr

1.000

Harga satuan pekerjaan per - m2

TOTAL

0.00

JUMLAH

0.00

9.9.3. Mengecat permukaan besi dengan meni besi


NO
I

URAIAN PEKERJAAN
BAHAN
Meni besi

SATUAN

KOEFISIEN

Kg

0.100

HARGA SATUAN
(Rp)
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.010
0.020
0.200
0.020
TOTAL

III

ALAT
Kuas
Harga satuan pekerjaan per - m2

bh

TOTAL
(Rp)

0.010

BIDANG PSDA

9.9.4. Mengecat permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat mutakhir , t = 200 um
NO
I

URAIAN PEKERJAAN
BAHAN
Cat

SATUAN

KOEFISIEN

Kg

0.300

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.006
0.012
0.060
0.006
TOTAL

III

ALAT
Kuas

bh

0.010

Harga satuan pekerjaan per - m2

9.9.5. Mengecat permukaan baja lapis seng (galbani) secara manual sistem 3 lapis cat konvensionan , t = 200 um
NO
I

URAIAN PEKERJAAN
BAHAN
Cat dasar
Cat antara
Cat penutup

SATUAN

KOEFISIEN

Kg
Kg
Kg

0.110
0.170
0.080

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.200
0.300
0.800
0.500
TOTAL

III

ALAT
Kuas

bh

0.010

Harga satuan pekerjaan per - m2

9.9.6. Mengecat tembok baru


NO
I

URAIAN PEKERJAAN
BAHAN
Plamir
Cat dasar
Cat penutup 2 x

SATUAN

KOEFISIEN

Kg
Kg
Kg

0.100
0.100
0.260

HARGA SATUAN
(Rp)
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang
Tukang cat
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.0025
0.0063
0.063
0.020
TOTAL

III

ALAT
Kuas
Harga satuan pekerjaan per - m2

bh

TOTAL
(Rp)

0.010

BIDANG PSDA

10. PEKERJAAN PENUNJANG


10.10.1. Pengeringan / pemompaan air
NO
I

URAIAN PEKERJAAN
BAHAN
Solar

SATUAN

KOEFISIEN

ltr

0.500

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Operator semi terampil
Mekanik semi terampil

Org/hr
Org/hr

0.042
0.042
TOTAL

III

ALAT
Pompa air

unit

0.042

Harga satuan pekerjaan per - jam


10.10.2. Pasangan ijuk tebal 2 cm
NO
I

URAIAN PEKERJAAN
BAHAN
Ijuk

SATUAN

KOEFISIEN

kg

2.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.010
0.100
TOTAL

III

ALAT
0.000
Harga satuan pekerjaan per - m2

10.10.3. Timbunan pasir dalam karung


NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3
bh

1.000
20.000

HARGA SATUAN
(Rp)

TOTAL
(Rp)

BAHAN
Pasir uruk
Karung plastik

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
TOTAL

0.00
0.00

JUMLAH

0.00

TOTAL
II

TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.010
0.288
TOTAL

III

ALAT
Keranjang

0.050

Harga satuan pekerjaan per - m3


10.10.4. Pemasangan Trucuk bambu
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m3

1.000

HARGA SATUAN
(Rp)

BAHAN
Bambu bongkotan

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

TOTAL
II

TENAGA
Mandor
Kepala tukang kayu
Tukang kayu
Pekerja

Org/hr
Org/hr
Org/hr
Org/hr

0.087
0.032
0.317
1.552
TOTAL

III

TOTAL
(Rp)

ALAT
Tripot
Timbris
Palu / Bodem

unit/hr
unit/hr
bh

0.015
0.015
0.015
TOTAL

BIDANG PSDA

Harga satuan pekerjaan per - batang

JUMLAH

0.00

BIDANG PSDA

11. ANALISA BIAYA PEKERJAAN RUMPUT


11.11.1. Gebalan rumput
NO
I

URAIAN PEKERJAAN

SATUAN

KOEFISIEN

m2

1.000

HARGA SATUAN
(Rp)

BAHAN
Gebalan rumput

0.00
TOTAL

II

TENAGA
Mandor
Pekerja

Org/hr
Org/hr

0.010
0.144

0.00
0.00
TOTAL

III

ALAT
Tusuk bambu
Gerobak

bh
bh

0.020
0.005

0.00
0.00
TOTAL

Harga satuan pekerjaan per - m2

JUMLAH

BIDANG PSDA

TOTAL
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

You might also like