Professional Documents
Culture Documents
Specification
Specification
4.
5.
6.
7.
8.
below:
Foundation
50mm
Column
40mm
Beam
25mm
Slab
20mm
Stairs
20mm
Grade of concrete should be M20.
Grade of steel should be Fe415.
Reinforcement should be placed properly.
Minimum curing period should be 14 days.
Beam with higher reinforcement should be adopted at the
9.