MATERIAL APPROVAL

Project
Packages/Works
No.

: THE ASPEN RESIDENCES@ADMIRALTY


: TOWER C-D
: ......................................................

MATERIAL DATA
1
2
3
4
5

Sub Contractor
Submission Date
Name Of Material Sample
Supplier
Specification Details

PT. .................................................................................

Product
Type
Material Code

Specification Detail as Contract


Product
Type

Reference
Drawing No.
RKS Page
Others

Location Of Woks
Zone and Axis

Tower C & D

Floor and Room

Attachment
Sample of Materials

enclosed

Not enclosed

Brochure Or Booklet

enclosed

Not enclosed

Test Result

enclosed

Not enclosed

RESPONSE
MAIN CONTRACTOR

10
Base of
Evaluation

a. Drawing

b. Technical Specification
Material Quality

11

Evaluation Result

12

Follow Up

13

14

CM

OWNER

Comply

Comply

Comply

Not Comply

Not Comply

Not Comply

Comply

Comply

Comply

Not Comply

Not Comply

Not Comply

Good

Good

Good

Fair

Fair

Fair

Pool

Pool

Pool

Approved

Approved

Approved

Approved with Note

Approved with Note

Approved with Note

Not Approved

Not Approved

Not Approved

Lab. Test required

Lab. Test required

Lab. Test required

Guarantee doc required

Guarantee doc required

Guarantee doc required

Revise & Re - Submit

Revise & Re - Submit

Revise & Re - Submit

Mock Up Required

Mock Up Required

Mock Up Required

Notes
Approved by Owner

Checked by Main - Contractor

PT. HARMAS JALESVEVA

PT. PULAU INTAN BPK

PT. ENERTEC MITRA SOLUSI

(Panhudi Yuwono)
Project Manager

(.......................................)
Engineer Manager

(Sigit Dwi Handoko)


Engineer Manager