1

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
Customer
Relay Type
Panel Identification
Relay Identification
Relay Make
Model
Serial No.
Firmware Revision
Auxiliary Voltage
Test Starting Date
Test Set Used

Engro Powergen
Numerical Generator Management Relay
Generator Protection Panel GPP
Generator Protection
GENERAL ELECTRIC
G60-G01-HCH-F8F-H67-M8F-P6D-U6D-W6C
AALC07000443
5.4
125V DC
16-04-2015
Freja 300
Mr.Mubasher Ahmed, Testing/Commissioning Engineer.
Contact Number: +92 333 408 30 86
Mr.Ijlal, Engro Powergen

Tested By
Witnessed By
General Data
Generator Genout Voltage
Connection Type
CT Ratio Genout Side (CT-6)
CT Ratio Neutral Side (CT-1)
VT Ratio (VT-G)
Aux. Neutral VT(NET)

11.0 kV
WYE
8000/1
8000/1
13.8kV/100V
13.8kV/200V

Testing Procedure
1.
2.
3.
4.
5.
6.
7.

Verify that the relay rear connection/wiring is according to referred drawings.


Power up relay at its rated voltage mentioned on face plate of relay.
Verify that In Service green LED on face plate is lit up.
Verify that different protection units inside the relay are configured on desired
settings.
Isolate the relay from field side wiring as per referred drawing.
Inject different voltage & current values (according to relay trip settings) to
relay and check its functionality and behavior.
Note down all test results in tables given below.

EPESOL(PVT)LTD

Partner

SHT1OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
1.

Measuring / Metering Accuracy

Source

Phase
Involved

Ratio

Applied Analog
Signals (Secondary)

Measured Value
(Primary)

Source 2,Line Side


Source 2, Line Side
Source 2, Line Side
Source 1, Neutral Side
Source 1, Neutral Side
Source 1, Neutral Side
Main PTs (VTG-P)
Main PTs (VTG-P)
Main PTs (VTG-P)
NET

Ia1
Ia2
Ia3
Ib1
Ib2
Ib3
V1
V2
V3
VT

8000/1
8000/1
8000/1
8000/1
8000/1
8000/1
13.8kV/100V
13.8kV/100V
13.8kV/100V
13.8kV/220V

1.00 0A
1.00 240A
1.00 120A
1.00 0A
1.00 240A
1.00 120A
(57.70)100V
(57.7240)100V
(57.7120)100V
1000 V

7.994-0 kA
8.002-119 kA
7.994-240kA
7.995-0 kA
8.002-119 kA
7.994-240kA
13.796-330 kV
13.794-90 kV
13.808-210 kV
6.27-0 kV

2.

Stator Differential Protection (87G)


Pickup
Slope 1
Break 1
Break 2
Slope 2
2.1

=
=
=
=
=

0.083 P.U
10 %
1.00 P.U
3.07 P.U
60 %

Pickup Accuracy

I Applied at Gen out Side( (Amp)

Sr.

I Applied at Neutral Side (Amp)

Status

Ia1

Ia2

Ia3

Ib1

Ib2

Ib3

1.00

1.00

240

1.00

120

1.00

1.00

240

1.00

120

Stable

0.90

0.90

240

0.90

120 0.810

0.810

240

0.810

120

No Pickup

0.90

0.90

240

0.90

120 0.809

0.809

240

0.809

120

Pickup

3.50

3.50

240

3.50

120

1.41

1.41

240

1.41

120

No Pickup

3.50

3.50

240

3.50

120

1.40

1.40

240

1.40

120

Pickup

EPESOL(PVT)LTD

Partner

SHT2OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
2.2

Operating Time Accuracy

Ia1

Ia2

Ia3

Ib1

Ib2

Ib3

Measured
Time
(msec)

1.00

1.00

240

1.00

120

0.00

0.00

240

0.00

120

13.00

I Applied at Genout Side( (Amp)

Sr.
1

3.

I Applied at Neutral Side (Amp)

Status
Trip

Negative Phase Sequence (Generator Unbalance Alarm 46A)


3.1

Pickup Accuracy
Inom.
Stage 2 Pickup
Time Delay

Sr.

=
=
=

0.830 P.U.
10.00%
6.0 sec

Applied Current Gen out Source 2 (Amp)


Ia2
Ia3
I1
I2

Ia1

Status

I3

0.050

0.050

0.050

120

240

No Pickup

0.051

0.051

0.051

120

240

Pickup

: Phase T
OC and Stator Diff. Settings should be switched off to test this function.
Negative Phase Sequence ( Generator Unbalance Trip 46T)

4.

4.1

Pickup Accuracy
Stage 1 Pickup
Stage 1 K Value
Stage 1 min.
Stage 1 max.
Stage 1 K Reset

=
=
=
=
=

10.00 %
6.40
0.250 Sec
640.0 Sec
256.0 Sec

Applied Current Gen Out Source 2 (Amp)

Sr.

Status

Ia1

Ia2

Ia3

I1

I2

I3

0.084

0.084

0.084

120

240

No Pickup

0.085

0.085

0.085

120

240

Pickup

EPESOL(PVT)LTD

Partner

SHT3OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
4.2

Applied Current Neutral Source 2 (Amp)

Sr.

Ia1
1.00
1.50
2.50

1
2
3
5.

Operating Time Accuracy

Ia2
1.00
1.50
2.50

Ia3
1.00
1.50
2.50

I1
0
0
0

I2
120
120
120

Measured Time
( Sec )

I3
240
240
240

4.434
1.994
0.733

Sensitive Directional Power Stage 1(32 N. Stop)


5.1

Pickup Accuracy
Directional Power RCA
Stage 1 SMIN
Stage 1 Delay

Sr.

V1

=
=
=

180
0.035 P.U
3.0 Sec

Applied Voltage (Volts)


V2
V3 V1 V2 V3

Applied Current Source 2 (Amp)


Ia1
Ia2
Ia3 I1 I2 I3

Status

57.70 57.70 57.70

240

120

0.035 0.035 0.035 180

60

300

No
Pickup

57.70 57.70 57.70

240

120

0.036 0.036 0.036 180

60

300

Pickup

5.2
Sr.
1
6.

V1

Operating Time Accuracy


Applied Voltage (Volts)

Applied Current Source 2 (Amp)

V2

Ia1

Ia2

Ia3

I1 I2 I3

0.2

0.2

0.2

180

V3

57.70 57.70 57.70

V1 V2 V3
0

240

120

60

Measured
Time (m
Sec)

300

3.074

Sensitive Directional Power Stage 2 (32-2)


6.1

Pickup Accuracy
Directional Power RCA
Stage 2 SMIN
Stage 2 Delay

Sr.

V1

Applied Voltage (Volts)


V2
V3 V1 V2

=
=
=
V3

180
-0.007
0.50 Sec
Applied Current Source 2 (Amp)
Ia1
Ia2
Ia3
I1 I2 I3

Status

57.70 57.70 57.70

240

120

0.007

0.007

0.007

180

60

300

No
Pickup

57.70 57.70 57.70

240

120

0.008

0.008

0.008

180

60

300

Pickup

EPESOL(PVT)LTD

Partner

SHT4OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
6.2

Operating Time Accuracy

Applied Voltage (Volts)


Sr.
1

7.

V1

V2

V3

Applied Current Source 2 (Amp)

V1 V2 V3

57.70 57.70 57.70

240

120

Ia1

Ia2

Ia3

I1 I2 I3

0.005 0.005 0.005 180

60

Measured
Time
(mSec)

300

579

Loss of Field Stage 1 (40):


7.1

Pickup Accuracy
Center
Radius
Time Delay
Off Set

= 44.14 ohm
= 34.76 ohm
= 1.000 sec
= 9.38 ohm

V1

Applied Voltage (Volts)


V2 V3 V1 V2 V3

20

20

20

240

120

0.254

0.254

0.254

90

330

20

20

20

240

120

0.255

0.255

0.255

90

330

Sr.

7.2

Applied Current Sorce 2 (Amp)


Ia1
Ia2
Ia3 I1 I2 I3
210

78.74

No

210

78.41

Yes

Applied Current Sorce 2 (Amp)

V1

V2 V3 V1 V2

V3

Ia1

Ia2

Ia3

I1

I2

I3

20

20

120

0.51

0.51

0.51

90

330

210

8.

Pickup

Operating Time Accuracy

Applied Voltage (Volts)


Sr.

Z
ohm

20

240

Measured
Time
(sec)
1.024

Loss of Field Stage 2 (40):


8.1

Pickup Accuracy
Center
Radius
Time Delay
Off Set

=
=
=
=

80.98 ohm
71.60 ohm
1.00 sec
9.38

V1

Applied Voltage (Volts)


V2 V3 V1 V2 V3

20

20

20

240

120

0.132 0.132 0.132

90

330 210 151.52

20

20

20

240

120

0.133 0.133 0.133

90

330 210 150.38

Sr.

EPESOL(PVT)LTD

Applied Current Sorce 2 (Amp)


I1 I2 I3
Ia1
Ia2
Ia3

Z
ohm

Status

No
Pickup
Yes

Partner

SHT5OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
8.2
Sr.
1

9.

Operating Time Accuracy (at 36.0 ohm)

V1

Applied Voltage (Volts)


V2 V3 V1 V2

V3

Applied Current Source 2 (Amp)


Ia1
Ia2
Ia3 I1 I2 I3

20

20

120

0.17

20

240

0.17

90

330

210

1.034

Phase Over Voltage Element (59P1):


9.1

Pickup Accuracy
Pickup
Time Delay

Sr.

=
=

1.200 P.U.
0.50 Sec

Applied Voltage (Volts)


V3
V1
V2

Status

V1

V2

69.18

69.18

69.18

240

120

No Pickup

69.19

69.19

69.19

240

120

Pickup

9.2

Sr.
1

10.

0.17

Measured
Time (sec)

V3

Operating Time Accuracy


Applied Voltage (Volts)

V1

V2

V3

V1

V2

V3

Measured Time
(Sec)

75.00

75.00

75.00

240

120

0.554

Under Frequency (81-1U):


10.1

Pickup Accuracy
Pickup Level

49.00 Hz

Sr.

Voltage Applied
(Volts)

Applied Frequency
(Hz)

Status

1
2

63.50
63.50

49.01
49.00

No Pickup
Pickup

EPESOL(PVT)LTD

Partner

SHT6OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
11. Under Frequency (81-2U):
11.1

Pickup Accuracy
Pickup Level
Time Delay
Voltage Applied
(Volts)
63.50
63.50

Sr.
1
2
11.2

Applied Frequency
(Hz)
47.50
47.49

No Pickup
Pickup

Applied Frequency
(Hz)
47.00

Measured Time
( Sec)
3.10 Sec

Status

Over-Frequency (81-1O):
12.1

Pickup Accuracy
Pickup Level

13.

47.50 Hz
3.00 Sec

Operating Time Accuracy


Voltage Applied
(Volts)
63.50

Sr.

12.

=
=

51.00 Hz

Sr.

Voltage Applied
(Volts)

Applied Frequency
(Hz)

Status

1
2

63.50
63.50

50.98
50.99

No Pickup
Pickup

Over-Frequency (81-2O):
13.1

Pickup Accuracy
Pickup Level
Time Delay

=
=

52.50 Hz
3.00Sec

Sr.

Voltage Applied
(Volts)

Applied Frequency
(Hz)

Status

1
2

63.50
63.50

52.49
52.50

No Pickup
Pickup

EPESOL(PVT)LTD

Partner

SHT7OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
13.2

14.

Operating Time Accuracy

Sr.

Voltage Applied
(Volts)

Applied Frequency
(Hz)

Measured Time
( Sec)

63.50

53.00

3.10

Over-Frequency (81-3O):
14.1

Pickup Accuracy
Pickup Level
Time Delay

=
=

52.50 Hz
30.00 Sec

Sr.

Voltage Applied
(Volts)

Applied Frequency
(Hz)

Status

1
2

63.50
63.50

52.49
52.50

No Pickup
Pickup

Applied Frequency
(Hz)
53.00

Measured Time
( Sec)
30.10

14.2

Operating Time Accuracy


Voltage Applied
(Volts)
63.50

Sr.
1

Note: Overfrequency Stage 2 & Stage 3 has same pickups


15.

Phase Under Voltage (27-U1):


15.1

Pickup Accuracy
Pickup
Curve
Time Delay

Sr.

=
=
=

0.90 P.U (Phase to Ground)


Definite Time
10.00 Sec

Applied Voltage (Volts)


V2
V3
V1
V2

V1

V3

Status

51.94

51.94

51.94

240

120

No Pickup

51.93

51.93

51.93

240

120

Pickup

EPESOL(PVT)LTD

Partner

SHT8OF14

GEEnergy

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
16.

Phase Under Voltage (27-U2):


16.1

Pickup Accuracy
Pickup
Curve
Time Delay

Sr.

=
=
=

0.90 P.U (Phase to Ground)


Definite Time
3.00Sec

Applied Voltage (Volts)


V3
V1
V2

Status

V1

V2

V3

40.41

40.41

40.41

240

120

No Pickup

40.40

40.40

40.40

240

120

Pickup

Applied Voltage (Volts)


V3
V1
V2

V3

Measured Time
(Sec)

120

3.034

16.2 Operating Time Accuracy

Sr.
1

17.

V1

V2

30.0

30.0

30.0

240

Phase Time Over Current with Voltage Restraint (51V)


17.1 Pickup Accuracy
Pickup Level
Curve
TD Multiplier
Voltage Restrained

Sr.
V1

= 0.997 P.U
= IEEE Mod Inv
= 2.00
= Enabled

Applied Voltage (Volts)

Applied Current Source 2 (Amp)

V2

Ia1

V3

V1 V2 V3

Ia2

Ia3

I1

I2

Status

I3

57.70 57.70 57.70

240

120

0.997 0.997 0.997

240 120

No
Pickup

57.70 57.70 57.70

240

120

0.998 0.998 0.998

240 120

Pickup

0.00

0.00

0.00

240

120

0.100 0.100 0.100

240 120

No
Pickup

0.00

0.00

0.00

240

120

0.101 0.101 0.101

240 120

Pickup

EPESOL(PVT)LTD

Partner

SHT9OF14

GEEnergy

10

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
17.2 Operating Time Accuracy
Sr.

Applied Voltage (Volts)

Applied Current Source 2 (Amp)

V2

Ia1

V1

V3

V1 V2 V3

Ia2

Ia3

I1

I2

Measured
Time(Sec)

I3

57.70 57.70 57.70

240

120

2.00 2.00 2.00

240 120

7.574

50.00 50.00 50.00

240

120

2.00 2.00 2.00

240 120

6.334

40.00 40.00 40.00

240

120

2.00 2.00 2.00

240 120

5.044

30.00 30.00 30.00

240

120

2.00 2.00 2.00

240 120

4.004

10.00 10.00 10.00

240

120

2.00 2.00 2.00

240 120

2.294

0.00

240

120

2.00 2.00 2.00

240 120

1.915

18.

0.00

0.00

Phase Instantaneous Time Over Current-1 for (50 P)


18.1

Pickup Accuracy
Pickup Level
Time Delay

Sr.

=
=

3.076 P.U
0.01Sec

Applied Current Source 2 (Amp)


Ia3
I1
I2

Status

Ia1

Ia2

3.077

3.077

3.077

240

120

No Pickup

3.078

3.078

3.078

240

120

Pickup

I3

Measured Time
( Sec )

120

0.041

18.2

Sr.
1

Ia1

I3

Operating Time Accuracy


Applied Current Neutral Source 1 (Amp)
Ia2
Ia3
I1
I2

4.00

4.00

EPESOL(PVT)LTD

4.00

240

Partner

SHT10OF14

GEEnergy

11

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
19.

Phase Instantaneous Time Over Current-1 for (50BF)


19.1

Operating Time Accuracy


Pickup Level
Time Delay

Sr.
1

20.

= 0.200 P.U
= 0.250 Sec (in logic)

Applied Current Source 2 (Amp)


Ia3
I1
I2

Ia1

Ia2

1.39

1.39

1.39

=
=
=

Applied Voltage (Volts)


V3
V1
V2

V1

V2

64.59

64.59

64.59

64.60

64.60

64.60

268.9

1.12 P.U.
Definite Time
5.00
Applied Freq
Hz

Status

V3

240

120

50

No Pickup

240

120

50

Pickup

Status

V3

Applied Freq
Hz

Over Excitation Protection Stage 2(24 T):


20.1

Pickup Accuracy
Pickup
Curve
T.D

Sr.

120

Pickup Accuracy
Pickup
Curve
T.D

20.

240

Measured Time
(mSec)

Over Excitation Protection Stage 1(24):


20.1

Sr.

I3

= 1.15 pu
= Definite Time
= 3.00

Applied Voltage (Volts)


V3
V1
V2

V1

V2

1.

66.30

66.30

66.30

240

120

50

No Pickup

2.

66.32

66.32

66.32

240

120

50

Pickup

EPESOL(PVT)LTD

Partner

SHT11OF14

GEEnergy

12

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project

20.2

Sr.
1.

Operating Time Accuracy

V1

V2

72.0

72.0

Applied Voltage (Volts)


V3
V1
V2
72.0

240

V3

Applied Freq
Hz

Measured Time
( Sec )

120

50

3.114

3rd Harmonic Neutral Under Voltage Protection (27TN)

21.

21.1

Pickup Accuracy
Pickup Level
Time Delay

= 0.0087 pu
= 5.00 sec

Sr.
1

Voltage Applied Neutral Source 1 Aux VT (Volts)


2.00

Status
No Pickup

1.90

Pickup

23.

Accidental Energization(AE)
23.1

Pickup Accuracy
AE Armed
Under Voltage
Over Current

=
=
=

UV & OFFLINE
0.7 PU
0.3 PU

Applied Voltage (Volts)

Sr.

Applied Current Source 2 (Amp)

V1 V2 V3

V1

V2

V3

0.00

0.00

0.00

240

120

0.301 0.301 0.301

240 120

No
Pickup

0.00

0.00

0.00

240

120

0.300 0.300 0.300

240 120

Pickup

41.50 41.50 41.50

240

120

0.301 0.301 0.301

240 120

Normal

41.60 41.60 41.60

240

120

0.300 0.300 0.300

240 120

Delatched

EPESOL(PVT)LTD

Ia1

Ia2

Ia3

Status

I1

I2

I3

Partner

SHT12OF14

GEEnergy

13

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
23.2

Sr.
1

Operating Time Accuracy

Applied Voltage (Volts)

Applied Current Source 2 (Amp)

V1

V2

Ia1

Ia2

Ia3

0.00

0.00 0.00

0.80

0.80

0.80

V3

V1 V2 V3
0

240

120

I1 I2 I3
0

Measured
Time(msec)

240 120

23.50

hase TOC and Stator Diff.


Settings should
be switched off to test this function.
24.
Ground Time Over Current-1 (51G)
24.1 Pickup Accuracy
Pickup Level
Time Delay

Sr.

=
=

0.065 P.U
1.00 Sec

Applied Ground Current (Amp)

Status

Ig

I1

0.066

No Pickup

0.067

Pickup

24.2 Operating Time Accuracy

Sr.
1

Applied Ground Current (Amp)


Ig

I1

0.100

EPESOL(PVT)LTD

Measured Time
(Sec)
1.02

Partner

SHT13OF14

GEEnergy

14

Test Report of Generator Protection Relay (G60-A) for


Engro Powergen Project
25.

Verification of LEDs

Sr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Configuration
Stator differential
Phase TOC
Phase IOC
Ground TOC
Generator Unbalance
Phase UV 1
Phase UV 2
Phase OV 1
Volts Per Hz 1
Volts Per Hz 2
Loss of excitation
Accidental Energization
3rd harmonic under voltage
Sensitive directional Power stage 1
Sensitive directional Power stage 2

Remarks
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional
Functional

Tested By

Witnessed By

Mr.Mubasher Ahmed
EPESOL PVT LTD

Mr.Ijlal
Engro Powergen

EPESOL(PVT)LTD

Partner

SHT14OF14

GEEnergy