Documents - MX API 570 Final Exam Closed Book

You might also like

Download as pdf
Download as pdf
You are on page 1of 17
API 570 Certification Practice Exam Name: Closed Book - Multiple Choice (No Codes or class materials may be used) A total of 125 Questions. Each question counts for 1/2 point. 1. Insevere refinery services which type of pipe is normally used? a) Cast b) Machined ©) Seamless a) Welded 2. Pressure applied inside a pipe creates stresses in the pipe wall. These stresses are highest on which weld orientation’ a) Cireumferential weld b) Longitudinal weld ©) 30 degree mitered weld )—Allare about the same 3. Which of the following is not an acceptable method for establishing the piping corrosion rate in & a) Owner's experience b) Inspect the piping system within 3 months of operation ©) Corrosion data from trade journal ) Corrosion data from phone discussion with a consultant corrosion engineer. 4. Per B31.3, how much RT is conducted on circumferential welds of a pipe in Normal Service? ay 0% b) 5% 2) 10% 100% ©) Depends on flange class For welded pipe, the normal thickness undertolerance is: a) 0.0 b) 0.01 in ©) 0.0125 inch, 125% of the specified wall thickness 6. When qualifying a weld procedure the essential variables must: a) be recorded on only the POR b) be recorded on only the WPS. ©) be recorded on both the WPS and POR. d) be recorded on both the WPS and WPQ 7. Apipe has a thickness designation of “40S”. What docs the “S” mean? 8) Schedule b) ness ©) Stainless steel Steel sts 1 221109 bed 10. 4, 12, 13, M4 MsTS API 570 Certification Practice Exam ‘Which of the following types of pipe should not be used in pressurized hydrocarbon service? a) Threaded cast iron b) Butt welded carbon steel ©) Rolled and welded carbon steet d) Socket welded stainless steet ‘Generally socket-welded piping is not used for nominal pipe sizes above 3) Linch, b) inch, 3) ’) Apropan piping system shouldbe casted ay pope — Cay a) Class 1 b) Class2. Mathore — CO} ©) Class3 Ether, - CF 4) Category D % a 4 ahah — ‘According to ASMEJANSI B16.5 flanges a) blind flanges. b) Class 150 flanges. ©) Class 150 and 300 flanges. 4) threaded flanges, ade from plate materials can only be used for ‘The corrosiveness of soils can be determined by measuring the soil’s a) plasticity b) resistivity. ©) modulus of ela Proheat should never be substituted for a postweld heat treatment ifthe: ) pipe wall thickness is greater than 1.0”. b) pipe is @ P-3 material ©) post weld heat treatment was designed to prevent environmental cracking, ) post weld heat treatment was designed to reduce stress levels in the heat affected zone. ‘Which of the following is a required marking on ASME/ANSI B16.5 flanges? a) Bolt material b) Nominal pipes ©) Outside diameter of flange 4) Temperature rating During welding, non-essential variables: 4) must be recorded only on the WPS and must be followed by the welder. b) must be recorded on the WPS and are optional for the welder. €) must be recorded on both the WPS and POR 4) are optional on both the WPS and POR. 2 2121109 16, 1. 18. 19, 21, 2, MSTS API570 Certification Practice Exam During a hydrotest, all joints should be: a) tested for 1 hour. b) left uninsulated. ¢) left uninsulated and unpainted. 2) soap tested. ASMEVANSI B16.5 requires flanges to be: a) made by forging. b) hydrotested. ©) inspected by RT. 4) marked with the class rating, ‘Which of the following activities is not included in the scope of API 570? a) Rerating a piping system b) Operating a piping system ) Replacing a portion of a piping system d)— InspeGling a system ‘Which of the following refinery piping systems may be excluded from the specific requirements of API S70? 8) 3/8” OD gasoline drain line b) 6 NPS fuel gas line ©) 4NPS crude line operating at 100 °F d) 3 NPS catalyst line Graphitization of carbon steels begins to occur when metal lemperatures exceed: a) 20°F. by) 800°, ©) 1000°R, d) 1100°R. During pipe fabrication, who has overall responsibility for compliance with the Code? a) APL570 Authorized Inspection b) Designer ©) Manufacturer d) Owner ©) Owmer’s Inspector ‘Who has the responsibility to determine the extent of PMI performed? a) Authorized Inspector b)— Owner/User ©) Repair organization d) Engineering organization Which of the following piping systems is covered by B31.3? 8) 4 NPS-10psilow presse instrument epg at local einer. 8) GNPS~ 300 psi el ga ine at loca wily power plant. ©) NPS 45 psi gasoline line at a tank terminal. d) — GNPS-900 psi high pressure crude pipeline in the Gulf of Mexico, 3 2121109 API 570 Certification Practice Exam 24. An in-service process pipe is classified as Class | when the percentage of H2S exceeds a) 0.5%. by 1%. 2%. dD 3%. 25. Awelder becomes unqualified when he has nol welded using the: a) procedure for 6 months. b) procedure for 12 months. ©} process for 6 months. ) process for 12 months. 26. APQR test coupon with a shell thickness of “I can generally be used to qualify a wall thickness con the WPS up to: a) T ur > 2 4) 2T uptoa” 27. A prossure testis always required: 2) after all repairs, b) after all major repairs and alterations. ©) after all rerates. d) whenever the authorized inspector believes one is necessary. 28. When can radiography not be used to qualify a welder? a) When using the SAW process b) When using the GMAW process with the pulse arc mode ©) When using the GMAW process with the short circuit mode 4) When qualilying in the overhead position 2) When qualifying using P3 materials £) Radiography is never allowed to qualify a welder 29. Generally, raised face Manges should have surface finish of: a) 50-250 micro-in, b) 125-250 micro-in ©) 125-500 micro-in 4) 250-500 miero-in, 30. During a direct visual exam of a pipe weld, the minimum light intensity should be: a) 10 footcandles. b) 50 footcandles ©) 100 footcandies 4) 1000 footcandles. 31, Describe the “3G” welding test position, 3) Horizontal groove b) Vertical groove ©) Overhead groove 4) Arkansas beiholo MSTS 4 221109 by 32. 33. 34. 35. 3. 38, 39, MSTS API 570 Certification Practice Exam ‘Seal welding pipe threads: a) may be used to prevent leaks. b) is used to strengthen the threaded joint, ©) is notallowed in B31.3, 4) is notallowed in APIS0, Which of the following piping components is most likely to have a substitution with the weong, material? 8) 4.20" length of 6 NPS pipe b)— Weld-neck flan ©) Expansion oil 6) Boling Liquid thermal relief valves should be sot at a pressure not higher than: 2) 100% of the design pressure. b) 110% of the design pressure. ©) 120% ofthe design pressure. d) 150% of the design pressure. When fabricating pipe, unknown materials: a) should never be used (except for door stops). b) can beused only in Category “D” piping. ©) canbe used only if successful tensile tests are conducted, ) can be used only if the safety factor is increased to 4 to 1 ‘The material verification program specilied by APIS78 covers: 4) only pressure-containing components b) only pipe, and fittings ©) only pipe, fittings, and welds. 6) pressure-containing and non-pressure con ng, components, ‘What is the interval for thickness measurements on a Class 1 piping system? a) S years b) 10 years ©) The lesser of 5 years or 1/2 the remaining life of the pipe 4) The lesser of 10 years or 1/2 the remaining life of the pipe According to B31.3, a welder's qualification records from a previous employer can: a) never be accepted. b) be accepted if the Inspector approves. ©) be accepted only if the welding is performed on Category “D” piping, d) be accepted only after obtaining an written recommendation from the previous employer. ‘When welding together piping components of different thickness, the thicker part should be trimmed with a: a) 10° taper b) 20° taper. ©) 30° taper. 6) 40° taper. 5 2121109 40, 4 2. 43, 44, 45. 46. 47. MSTS API 570 Certification Practice Exam When performing soil-o-air inspections on uncoated lines, it is recommended to excavate the soil a) 3-6". b) 6-12 ©) 12-18. d) - 12-24". ‘When performing preteat prior to pipe welding, the preheat zone must extend: a) I” beyond the edge of the weld. b) 3 beyond the edge of the weld ©) 6” beyond the edge of the weld. d) 12” beyond the edge of the weld. When obtaining thickness measurements; a) all TMLs on the circuit must be measured. ) the TML readings on a circuit should be averaged. ©) a TMLon each type of pipe component should be recorded. d) the TML’s must be measured using the UT. method, Flange bolts are unacceptable if the bolt throads do not extend: 2) beyond the face of the nut by 1 thread. b) inside the nut within 1/2 thread of the nut face. ¢) inside the nut within 1 thread of the mut face. 4) inside the nut within 2 threads of the nut face, Carbon steel mat ils are most likely to be incorrectly substitution in: a) a chrome steet pipe system b) stainless steel pipe system. ©) any ferritic steel pipe system, é) any non-ferrous pipe system. Per B3L:S"how much of the fabrication should be visually examined for a pipe in Severe Cyoli service? a 5% b) 10% ©) 50% d) 100% ©) Depends on flange class When calibrating a UT instrument, that has a delay line with a single element search un a) atest block of any thickness, made of the same material of that to be examined, b) atest block of any thickness, made of material with the same velocity of that to, be examined, ) atleast two test Blocks of any thickness, d) at least two test blocks with thicknesses near the maximum and minimum to be examined. During an API 570 pipe repair, which welding discontinuity is always unacesptable? a) Crack b) Incomplete Penetration ©) Porosity ©) Undereut 6 2122109 48, 49. 50, SI. 92 33. 34, 58. MSTS API 570 Certification Practice Exam Which of the following best describes undercut of a weld? a) The parent material and filer material are not completely bonded. b) ‘The weld root is not completely filled. ©) There isa groove in the parent material at the toe of the weld. 4) Anetongated inclusion directly under the weld cap. Which of the following is not « common location for significant external corrosion of a piping system which operates at 125 °F? a) Bottom side of a pipe at the pipe supports, b) Under pipe clamps ©) Near smali connections that penetrate through the insulation 4) Topside of an uncoated & uninsulated line in the unit pipecack. ‘The RT procedure used for a pipe repair must conform to the requirements of a) ASNT, SNT-TC-1A b) ASME, B&PY Code Section V ©) ASME, B&PY Code Section VITT 4) ASME, B&PV Code Section IX b) ° 60 minutes When a relief device or valve is removed for repair, the inspector should: a) inspect the inside of the inlet and outlet piping where the valve was removed. b) tag the valve, fo ensure the valve is returned to the correct location, ©) provide a cost estimate for the anticipated repairs 4) ensure that the flange bolts are renewed. ‘Thickness measurements are suggested at pipe fitings since: a) they are generally more accessible. b) many are forged or cast. ©) directional changes generally create increased turbulence. 4) the nominal thickness of most fittings is generally less than that of straight pipe. An insulated line is subject to dewpalitSbrxosion. Which of the following pats ofthe pipe is most likely to experience aecelerated corrosion? 2) Dead Legs ») Elbows 3) Welds 4) Straight pipe Flange leaks in certain fluids can cause: 4) gallingof bolts and nuts, b) bolt iengths to shorten, ©) bolts to crack or corrode. d) bolting stresses to decrease. 7 2/21109 56. 31, 58, 59, 6 02. MSTS API 570 Certification Practice Exam Heat ting could cause cracking in a carbontste piping which isin a) crude oil service. b) asphalt service. ) sulfuric acid service, d) caustic service, Exxcessive:xepairs to pumpibediiigs may be a result of a) increased corrosion rates in the attached piping systems, b} excessive forces coming from thermal growth in the attached piping systems ) incorrect metallurgy in the attached piping, systems. 4) external pipe inspections are overdue. Loose or broken anchor bolts at pipe supports are most easily detected by: 2) visual examination b) straight beam UT ©) finger tightening 6) hammertesting A pneumatic pressure testis to be conducted on a riornial Service-piping system. During pipe erection, how many of the jofivassonibliéSshould be examined? a) 5% b) 10% ©) 100% 4) random examination ©) spot examination, During a pipe repair, preheat is substituted for the required postweld heat treatment. What is the ‘minimum acceptable prebeal temperature? a) 150°F b)200°F ) 300°F 4) 50°F ‘When UT readings are taken at higher temperatures, the hot readings: a) will be greater than the actual thickness. b) will be sinatler than the actual thickness, ©) may be greater or smaller than the actual thickness depending on the material type. d) will vary from the actual thickness only because the UT instrument’ accuracy decreases. Existing valves in seyere cyclic temperature services should be checked for: a) erosion, b) cracks. ©) distortion caused by liquid harammer. 4) galvanic corrosion, A primary location of deterioration in a swing check-valveis the: a) flange face. b) cover gasker. c) shaft and hinges. a) disk. 8 2122109 API 570 Certification Practice Exam 64. Thickness measurements on Injection Points should be conducted at least every: a) year b) 3 years. ©) Syears. LO years. 65, An existing hydracarhon line is being pressure tested at 300.psi. Which of the following test ‘medivpas should nobe used? (line has not been thoroughly cleaned) a) Gasoil b) Nitrogen ©) Helium Air 66, Pressure wsts should be conducted: a) after PWHT. b) before PWHT. ©) without the joints being painted or primed, 4) without the joints being painted. (priming is ok) 67. What is the corrosion rate for the described TML? Reading #1 0331 611982 Retirement Thickness: 0.120" Reading #2 0320" 611988 Reading #3: 0.292" 611995 a) 0002ipy b) 0.003 ipy ©) 0.004ipy ) 0029ipy 68. What does the letter “F” on an RT indicate? a) Fast film speed b) Radiation is also coming for the far side of the radiograph ©) Penetrameter was placed on the film side d) Acertain wire type penetrameter was used for the RT 69. Fatigue eracks may be difficult to find since: a) the cracks are extremely tight. b) _itisdifficut to predict the location of fatigue cracks. ©) most eracks occurs under insulation 4) the time period between crack initiation and failure is shor. 70. Whats the minimum # of 1 exposures required to RT a re(2meoeu (No access tothe inside) ; 0 dD £34 BNPS L3I¥ / >a MSTS 9 % 2121109 1 7. RB 74, B. 16. 1, 78, MSTS API 570 Certification Practice Exam ‘When using a hole type penetrameter on a radiograph, what hole size must be seen on the radiograph? a IT or Qo st Q 47 During inspection of an injection point circuit, extensive inspection should be conducted downstream of the injection point fora distance at least: a) 12inches b) 25 feet ©) 3 pipe diameters ) 10 pipe diameters Insulated austenitic stainless steel pipe is susceptible to CUL (chloride stress corrosion cracking) at a) 0-200°R, b) 25-250°R. ©) 65-204°F. <) 150-400 Tack welds should be: a) made by a qualified welder or welding operator. b) _temoved when welding out the piping joint. ©) made with a filler material that is stronger than the pipe. ) fused wit the final pass. Which of the following is not a factor contributing to creep? a) Line size 6) Operation temperature ©) Length of time in operation 6) Actual stress levels in pipe ‘The minimum and maximum density range in the area of i ray source is: rest on a radiograph using a gamma a) 13-40 b) 18-40. 2) 20-40, 6) dependent on the plate material ‘Which of the following is not a major contributor to fatigue cracking? 8) Mechanical vibration b) ‘The number of pressure cycles ©) ‘The number of temperature cycles @) The number of ph changes According to API 570, internal inspection of large pipe: a) is mandatory. b) when done, should be conducted similar to API'S10 internal inspections, ©) when done, should be conducted at least every 10 years. 4) isnever recommended, 10 2121109 7. 80. 81. 82, 83. 84, 85. 86. MSTS API 570 Certification Practice Exam ‘Which of the fotlowing is not an acceptable way to qualify a welder? a) Bend tests of coupon, b} Tension tests of a coupon. ©) RT ofa coupon, 4) RT of 1* production weld, During the external inspectionespring hapgess should be checked to ensure thatthe: a) spring is not stuck. D) spring is not bottomed out ©) correct spring type was installed. 4) correct spring metallurgy was installed. According to API S10: a) a TML should be assigned to each fitting, b) — TML?s can never be eliminated. ©) the number of TML’s should be based on the metallurgy and length of the pipe. ) thickness measurements should be taken at the 4 pipe quadra During a piping repair, who is specifically responsible for quality contol? a) Authorized Inspector b) Examiner ©) Owner/User 4) Repair Organization ©) Testing Lab Ifa hydrostatic pressure testis maintsined fora lengtby period of time: a) a spare hydrotest pump should be provided, +) the inspector should remain at the test site for the total time ofthe hydrotest ©) precautions shall be taken to avoid excessive pressure 4) the test pressures should be recorded every 10 minutes. According to API 570, who should conduct the external inspection? 2) The Authorized Inspector b) ‘The Authorized Inspector or a Level I NDE examiner ©} The Authorized Inspector or qualified operation or maintenance personnel Anyone designated by the Owner-User ‘What NDE technique is useful fr finding plugging in piping? 2) Accoustic emission, b) Eddy Current RT our ‘Marking pens used to mark piping components should not contain: a) Carbon. ») Chrome. ©) Oxides. @) Sulfur. n 2121109 API 570 Certification Practice Exam 87. Which of the following is not an important step when performing a hydrotest on 2 300 series Stainless steel? a) Use potable water or condensate for the test medium. b) Raise pressure in small pressure steps, ©) Thoroughly drain piping, ) Thoroughly dry by blowing air through pipe. 88, Per API 970, during repairs and alterations, the inspector shall verify that the new materials being used are correct, What is the minimum amount of verification that the inspecior shall perform? a) 100% of all piping metallurgy’s b) 100% of all alloy piping ©) 100% of all high alloy piping A sampling ofall piping metallurgy’s ©) Asampling of all alloy piping 4) Assampling of all high alloy piping 89. During weld quality radiography, when possible IQIs should be placed on the: 2) film side. b) source side. ©) outside of the component weld. 90. Which valve type generally tends to create the most turbulainee in the Auid flow? 8) Ball valve b) Butterfly valve 3) Gate valve dy Globe valve 91, During an in-service inspect imperfection must be: n, an old fabrication imperfection was discovered in a weld. ‘This 4) evaluated to the acceptance standards of the original construction cade. b) evaluated to the acceplance standards of the curtent edition of B31.3. ©) evaluated to the acceptance standards of either the original construction cade or the current edition of B31.3. d) evaluated by an engineer or inspector. 8 Gey) 92. Whatis the harness its for ppe made fom 94% Ce-1% Mo? | oo 3)” 200 Beaeet c, Voy b) 225 Brinnel ca 5 ea Chee | 256 Brinn! Vg Geno : i ‘yao | 284 93. A locally thinned area on a pipe: oy w VG i" a) may be evaluated using API 579. 14 cated b) may be evaluated using API 598. oe wt ©) must be evaluated by a piping engineer. tn d) must never result in a thickness lower than allowed by the B31.3 thickness calculations. STS 2 2121109 94, 95, 96. 97. 98, 99, 100. MSTS API 570 Certification Practice Exam In which of the following activities must the name of the individual performing the activity be [permanently recorded in the piping records? 8) Creating the TML’s on a piping circuit b) Establishing the inspection intervals ©) Taking the thickness readings at the TML's 4) Establishing the Pipe Class forthe piping circuit Prior to performing a pipe repair the work must be authorized by the P 164 pipe rep: a) authorized inspector ») piping engineer. ©) authorized inspector and the piping engineer. 4) jurisdiction, ‘Temporary non-welded repairs of thinned piping: a) can never be made. b) can be made only if they are fully welded to the pipe ©) must always use leak seating fluids. 4d) must be designed to account for axial forces. What is the Quality Factor “I” for a seamless pipe made from A106 gr. BY 2) 0.80 b) 0.85 090 ) 095 ©) 1.00 ‘When the maximum weld hardness is specified in the Code, how many welds should be hardness tested? a) 10% of all heat treated welds b) 50% of all heat uated welds ©) 100% of all heat treated welds 4) 10% of furnace heat treated welds and 100% of local heat treated welds ‘When qualifying a WPS, a bead testis considered acceptable if there is no open defect greater than: a) 0.00" b) 6” os" d) 3/16" ‘What is the minimum radius for a fush repair patch on a large diameter pipe? a) finch b) inch ©) Ginch 4d) Flush patches are not allowed. B 2121/09 101 102. 103. 104. 105, 106. MsTS API 570 Certification Practice Exam What code covers the safety aspects of performing weld-overlay on a hydrocarbon line that is service? a) APLS79 b) API 2015 ce) API2201 4) AWSDILI If a weld map is not used, the welder must stamp: a) each weld personally made. b) every 6” of weld personally made. ©) every 3° of weld personally made. d)- 5% of the welds personally mad. ‘Welded temporary repairs on pipe: a) may remain past the next maintenance oppor iy only if approved & documented by the b) past the next maintenance opportunity oaly if approved by the engineer and inspector. 6) must always be replace af the next maintenance opportunity regardless of Pipe Class. d) must always be replace at the next maintenance opportunity only if the pipe is a Class 1 system, Ifa welder qualifies using RT on a coupon, the total length of weld RT'ed mist be at least: a 8 by 12 18" 36" Determine the Remain 1g Life ata specific TML. Data for the TML is as follows: Thicknesses: - Corrosion Rates: Nominal thickness: 0.375" / ‘Short-term Rate: 0.002 ipy Current thickness: 0.295" Long-term Rate: 0.004 ipy ‘Minimum thickness: 0.223 ~ a) 18 years — b) years ©) 36years d) 38 years - 2) 0 years years During fabrication, how many welds should be visually examined? Pipe is classified as Normal Sessice a) 5% b) 10% 2) 100% d) depends on API 570 piping classification. 4 2121/09 107. 108. 109. 110, nL 42. 1. 114, STS API 570 Certification Practice Exam What is the total number of tests that must be conducted to qualify.aWPS? a) Dhen teats b) ben tests or a radiograph of the tested weld ©) Dieasion tests and 2 berd tests 4) 2tension tests and 4 bend tests Which of the following is not included within the scope of B31.3? 4) Engineering requirements that are necessary for sae design of a piping systen b) Engineering requirements that are necessary for safe construction ofa piping system: ©) Specifying temperature limitations based on pipe materials. ~ 49 ~ 3bu"¥ 2 4) Provide guidance for selection of pipe materials based on process chemistry, ~ RF} $1 UT readings are generally accurate of pipe sizes greater than: a) NPS. b) LV/2Nps. ©) 2NPS. €) 3 NPS. ‘During a pipe alteration, a defective weld is discovered on a radiograph. How many more welds from the same welder should now be radiographed? ao by 2 3) 3 ad 4 Olle, a welding operator, takes a SMAW qualification test on his fist production weld. How much weld should be radiographed? ay 6” b) 1m °) 36" d) Radiography is not allowed when qualifying SMAW 3) m2 During radiography, whenever a placed under a hole-type TOL a) atleast 3 sides of the 101 image should be visible in the RT. b) all 4 sides of the 101 image should be visible in the RT. ) the shim should be made of stainless steel. 4) the shim should be the same thickness as the IO If alloy element(s) are conisined in the flux of a welding electrode, PMI testing: a) isnot necessary. 1b) isnot necessary provided appropriate documentation is provided by the supplier, ©) could be conducted on any of the production welds. d) could be conducted on a weld button prior to procluction welds. ‘The external inspection on a Class 2 Hine should be conducted: a) every 5 years. b) every 10 years, ©) lesser of 12 remaining life or 5 yeas. d) lesser of 1/2 remaining life or 10 years 15 2121109 us. 6. 47, 18, 119. 120. 121, STS API 570 Certification Practice Exam Cold spring generally refers to: a) spring support in its cold position. b) _aspring support in its “chocked” position. ©) purposely shortening a line during fabrication to offset thermal growth 2) the installation practice of rigging a large line into a congested piperack, ‘The suggested upstream limit of an injection poiat is a 6" wR 2, ©) 3 pipe diameters, 4) pipe diameters ©) greater of 6" or 3 pipe diameters. f) greater of 6” or 10 pipe diameters. 2) greater of 12” or 3 pipe diameters. h) greater of 12” or 10 pipe diameters. ‘When impact testing is required each test should consist of how many (est bats? aoa b) 2 ) 3 4) Depends on the material Identification of materials by visual stamps or markings: a) isnot an important part of the material verification program, b) isnot a substitute for PMI testing, ©) isimportant only with high alloy materials, ) should be done only by inspectors, Accordiag to APIS70, who should conduct the thickness measurement examinations? 2) ‘The Authorized Inspector b) The NDE Examiner ©) The Authorized Inspector or the NDE Examiner 4) Anyone designated by the Owner-User ‘The nominal size (NPS) of a pipe generally refers to the pipe’s: a) inside diameter. >) outside diameter. ©) inside diameter, ifthe pipe size is less 24 NPS. 4) outside diameter, if the pipe size is greater than or equal to 14 NPS. Creep begins to oceur in 1-1/4 Chrome steels at temperatures above: a) 450°R, b) 800°F 2 900°R. 4 1100°R 16 2121/09 API 570 Certification Practice Exam 122, A.welder who passes groove weld qualification test using SMAW, is qualified to weld: 2) on some fillets. b) on all filles 1g a few other welding processes. @) — onall pipe diameters, ©) onal materials. 1) using any SMAW filler rod. 123, Per API.578, what isthe appropriate action to take when an incorrect material is located during a PMI sampling of new materials a) Inspect 2 more items from the inspection lot. b) Inspect 50% of the items from the inspection lot. ©) Inspect 100% of the items from the inspection lot. €) Inspection all items supplied by that manufacturer 124, Piping stresses are generally higher at which of the following pipe connections? a) Flanged connections above the 300 class rating, b) _Non-feinforced branched connections ¢) Socketweld connections €) — Weld-o-tet connections 125, All owner/users thal use API 570 should: a) directly hire authorized inspectors. b) directly hire authorized inspectors and engineers. ©) have a quality assurance inspection manual. ) specify that all inspectors at their site get 12 weeks of vacation per year! Gove dst guabily Some Hil Fila eh does iol qnsify Gavel ‘MSIS 7 2/21109

You might also like