Professional Documents
Culture Documents
CSD Basement
CSD Basement
FIRE PROTECTION
SANITARY/VENT
ELECTRICAL
RAIN WATER DOWN PIPE
EXHAUST AIR DUCT
SUPPLY AIR DUCT
PLUMBING
PNEUMATIC WASTE SYSTEM
S1
NOTES
MO
MO
SAG 500X500
14
CSDS01
9
CSDS01
SAD 400x300
8
CSDS01
MN
MM
7
CSDS01
ML
MK
400 CT
300 CT
MJ
MI
500X1150mm
400x2050mm
150 FP
MH
400x2050mm
400x2050mm
300X1150mm
250 CT
400X1150mm
2
CSDS01
700X1150mm
450 CT
500X1150mm
300x2050mm
900X1150mm
900X1050mm
900X1150mm
5
CSDS01
MG
1
CSDS01
Received on:
EAD 3000x500
EAD 3000x500
Checked by:
EAD 3000x450
Signature / Date
Name / Designation
EAD 3000x450
1:250
700X1000mm
4
CSDS01
MF
700X1000mm
400X1000mm
700X1000mm
18
CSDS01
19
CSDS01
ACMV Sub
Elect Sub
PSG Sub
PWS Sub
FP Sub
RWDP Sub
Sub-Con
Sub-Con
ME
EMPLOYER
MD
HDB Hub 480 Lorong 6 Toa Payoh
Singapore 310480
CONSULTANT
3
CSDS01
MC
16
CSDS01
6
CSDS01
PROJECT TITLE
17
CSDS01
MB
MUKIM NO :
LOT NO :
MA
21
JOB TITLE
PUNGGOL NORTH
CONTRACT 6/7 & NC
S2
S3
S4
S5
S6
S7
S8
S9
S11
S12
S13
S14
S15
S16
S17
S10
AMENDMENT
DATE
REVISION :
DRAWING NO : CSDP01
SCALE : As indicated @ A0
DATE : 05/06/16
DRAWN BY : Author
CHECKED BY : Checker
APPROVED BY : Approver
All DIMENSION ARE IN mm .USE DIMENSION GIVEN: DO NOT SCALE ON DRAWING.
1/6/2016 3:31:06 PM
C:\Users\Administrator\Desktop\Working\PC67\KP_CSD_Basement_WunNa.rvt
S1
LEGENDS
FIRE PROTECTION
SANITARY/VENT
ELECTRICAL
RAIN WATER DOWN PIPE
EXHAUST AIR DUCT
SUPPLY AIR DUCT
PLUMBING
PNEUMATIC WASTE SYSTEM
S25
S26
NOTES
MO
N28
MO
MN
MM
ML
PIPE PENETRATE BEAM
SAME RISER ?
DUCT & RWDP
N27
MK
SAD 3000x450
15
CSDS01
SAD 3000x450
MJ
S01
20
CSDS01
MI
NH
NG
MH
12
CSDS01
N26
NF
MG
Received on:
Checked by:
EAD 3000x450
Signature / Date
11
CSDS01
Name / Designation
10
CSDS01
13
CSDS01
MF
NE
EAD 3000x450
EAD 3000x450
ACMV Sub
Elect Sub
PSG Sub
PWS Sub
FP Sub
RWDP Sub
Sub-Con
Sub-Con
ME
EMPLOYER
MD
ND
EAD 3000x450
EAD 3000x450
MC
NC
N25
PROJECT TITLE
MB
NB
S12
MUKIM NO :
LOT NO :
21
JOB TITLE
MA
NA
PUNGGOL NORTH
CONTRACT 6/7 & NC
DRAWING TITLE (FOR EST. BLK.
S18
S19
S20
S21
S22
S23
S24
BASEMENT CSD PART 2 OF 4
AMENDMENT
DATE
1 : 150
REVISION : 1
DRAWING NO : CSDP02
SCALE : As indicated @ A0
DATE : 05/06/16
DRAWN BY : Author
CHECKED BY : Checker
APPROVED BY : Approver
All DIMENSION ARE IN mm .USE DIMENSION GIVEN: DO NOT SCALE ON DRAWING.
1/6/2016 3:31:10 PM
C:\Users\Administrator\Desktop\Working\PC67\KP_CSD_Basement_WunNa.rvt
S17
LEGENDS
FIRE PROTECTION
SANITARY/VENT
ELECTRICAL
RAIN WATER DOWN PIPE
EXHAUST AIR DUCT
SUPPLY AIR DUCT
PLUMBING
PNEUMATIC WASTE SYSTEM
S5
S5
MG
S5
300
1ST STOREY
1ST STOREY
106.050
106.050
106.050
1050
100
VENT
1350
450 CT
175
EAD 1300x6200
250 CT
150
SANITARY
450 CT
EAD 700x5800
600 PWS
450
RWDP
200x50 CT
GEN 1
100
VENT
150 100
SANITARY VENT
600 CT
NOTES
-ALL ABBREVIATIONS REFER TO GENERAL PROVISIONS OF EACH SERVICES.
-ALL DIMENSIONS ARE IN mm.
-ALL LEVELS ARE MEASURED FROM REFERENCE FLOOR LEVEL.
-ACTUAL SPRINKLER POINTS AND BRANCH DROPPERS, LIGHTING POINTS,
SPEAKER POINTS, CCTV POINTS, DIFFUSER GRILLES, etc.
ARE TO REFER TO RESPECTIVE SHOP DRAWINGS.
-INSTALLATION DETAILS SHALL BE REFEREED TO THE RESPECTIVE
APPROVED SERVICES SHOP DRAWINGS.
-ALL COMBINE SERVICES DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
THE RESPECTIVE APPROVED SHOP DRAWINGS.
-THIS CSD SERVES AS A REFERENCE TO SOLVES ANTICIPATED HEAD ROOM,
SERVICES TO SERVICES, SERVICES TO STRUCTURAL AND SERVICES
TO ARCHITECTURAL NEEDS.
250 CT
175
2050
300x2050mm
EAD 500x3000
1ST STOREY
106.050
400
106.050
400
1ST STOREY
S6
400
900X1050mm
1ST STOREY
150
SANITARY
EAD 450x3000
600 PWS
EAD 5800x700
600 PWS
4500
LIGHTING
4500
4500
600 PWS
UNDER DUCT
SPRINKLER
3600
3475
2725
2725
2950
3175
2400
2759
2797
2675
2760
3125
2725
BASEMENT
BASEMENT
BASEMENT
BASEMENT
BASEMENT
101.550
101.550
101.550
101.550
101.550
S01
2550
2379
2400
2700
2550
2725
2950
3450
600 PWS
S02
1 : 50
1 : 50
S03
S04
1 : 50
1 : 50
S23
S06
1 : 50
MN
MG
S13
1ST STOREY
1ST STOREY
1ST STOREY
106.050
106.050
106.050
106.050
1ST STOREY
1ST STOREY
106.050
106.050
650
EAD 3000x500
400 CT
700X1000mm
150 FP 150 FP
450
RWDP
EAD 3000x450
400 CT
100 CWS
450x50 CT
BCS
2941
3175
2950
2400
2950
3121
3458
3405
3052
3294
3500
3350
3066
2990
3220
2775
200x50 CT
GEN 1
175
150
SANITARY
150 FP
600 PWS
2725
250x50 CT
SNP
320
450x50 CT
TEL
2990
100
150
VENT SANITARY
100
VENT
450
RWDP
3133
150 FP
3350
3350
600 PWS
EAD 250x250
3169
54 FHR
400 CT
150
100 SANITARY
VENT
SAD 150x300
400 CT
3350
80 FP
400 CT
320
54 FHR
100
VENT
362
150
150
SANITARY
1000
400
1ST STOREY
MF
3500
S12
3350
S10
S4
BASEMENT
BASEMENT
BASEMENT
BASEMENT
101.550
101.550
101.550
101.550
BASEMENT
BASEMENT
101.550
101.550
1 : 50
S08
1 : 50
S19
S09
10
1 : 50
S20
S10
1 : 50
MG
MF
S05
14
1 : 50
S18
S14
Rejected. To resubmit
1 : 50
S19
1ST STOREY
1ST STOREY
106.050
106.050
106.050
200 FP
1000
500X1000mm
650
900
450
RWDP
1ST STOREY
400
150
SANITARY
100x75 TKG
60x50 TKG
500X900mm
400 CT
1:100
EAD 450x3000
Received on:
150 FP
EAD 3000x450
EAD 3000x450
Checked by:
EAD 450x3000
150 FP
2960
3066
Name / Designation
2400
2960
3350
3266
3066
3066
2960
3066
2575
2600
2960
3066
3590
Signature / Date
3590
BASEMENT
BASEMENT
BASEMENT
101.550
101.550
101.550
ACMV Sub
Elect Sub
PSG Sub
PWS Sub
FP Sub
RWDP Sub
Sub-Con
Sub-Con
EMPLOYER
S13
13
11
S11
S12
12
1 : 50
1 : 50
CONSULTANT
1 : 50
HDB Hub 480 Lorong 6 Toa Payoh
Singapore 310480
MAIN CONTRACTOR
MF
MC
S13
150
SANITARY
106.050
106.050
450
RWDP
700X1000mm
600 CT
600 CT
600 CT
600 CT
106.050
200 CT
250 CT
500X1300mm
50
450 CT
500X1000mm
1300
106.050
1ST STOREY
400
106.050
1ST STOREY
1000
106.050
1ST STOREY
1000
1ST STOREY
1000
1ST STOREY
400
1ST STOREY
400
300X1000mm
300
450
RWDP
PROJECT TITLE
S20
S19
450 CT
SAD 450x3000
150
SANITARY
105.004
150
SANITARY
1:100
600 PWS
100x75 TKG
400 CT
200 CT
600 PWS
1:250
600 PWS
104.683
104.658
600 PWS
450
RWDP
150 FP
150 FP
150
SANITARY
MUKIM NO :
LOT NO :
SAD 450x3000
104.445
150
SANITARY
21
3500
PUNGGOL NORTH
CONTRACT 6/7 & NC
2680
2725
3066
3350
3475
3600
2725
3475
3600
3350
2725
3045
3175
JOB TITLE
3019
15
S15
1 : 50
BASEMENT
BASEMENT
BASEMENT
BASEMENT
BASEMENT
BASEMENT
101.550
101.550
101.550
101.550
101.550
101.550
16
S16
1 : 50
17
S17
1 : 50
18
S18
1 : 50
19
S19
1 : 50
20
S20
1 : 50
AMENDMENT
DATE
REVISION :
DRAWING NO : CSDS01
SCALE :
1 : 50 @ A0
DRAWN BY : WUN
APPROVED BY : Approver
All DIMENSION ARE IN mm .USE DIMENSION GIVEN: DO NOT SCALE ON DRAWING.
1/6/2016 3:31:20 PM
DATE : 05/17/16
CHECKED BY : CQ
C:\Users\Administrator\Desktop\Working\PC67\KP_CSD_Basement_WunNa.rvt
S07