Shutdown Report For Crude Unit (312) : Assignment
Shutdown Report For Crude Unit (312) : Assignment
ASSIGNMENT:During decontamination procedure I was involved with the following loops:1. crude column overhead system 2. vacuum column overhead system
2. flash drum vapor line 4. LP flare
For the remaining period I was with fired heaters ( F01/F02/F51) looking after the
following jobs:1. New process coils ( 40 no.) in convection section of F01 and F51
2. Burner block replacement in all 3 heaters
3. Air duct modification
4. New impeller installation for induced draft fan
5. Pigging
6. External tube cleaning
7. Windows cutting for inspection
8. Online corrosion monitoring
9. Heat shield for tubes
10. New turbulising steam nozzles on crossover of F02
WHAT I LEARNED
1. Pigging
2. Hydroabrasive cutting
3. Structure of Hi-Fi trays
4. Arrangement of Schoepentoeter
5. Hydrojetting
6. removal of tube bundle from shell
7. Gas cutting
8. Double decker chimney trays
9. Valve trays, sieve trays, tray support ring, Distributor
10. Insullation
11. valves types and their working
12. Burner tips
13. packing installation
14. welding, cutting, blinding
15. Crane operations
16. BMS
17. Demister pad
18. Hydrotesting
19. radiography
20. thickness survey