Date

Loading Area
Alat Angkut/Opr.

30-Mar-16
RL-685 T (Selatan)
ADTV 2013/Abdul Haris Sabeha

:
:
:

Travel Time (s)


No.

1
2
3

No.

Tque
(s)

Tspot
(s)

n
10

161
181

181

38
11

845

157

34
12

221

45

1
2
3
4

LP-A

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5

115

23

25

20

36

17

45

92

20

16

15

34

19

37

106

25

27

19

38

18

48

123

20

20

18

27

20

37

102

25

26

26

40

29

47

119

22

17

22

35

22

36

31-Mar-16

Loading Area
Alat Angkut/Opr.

:
:

RL-687 T (Selatan)

Tque
(s)

Tspot
(s)

n
12

313

373

27

Tque
(s)

Tspot
(s)

60

550

39

30

30

Tque
(s)

Tspot
(s)

LP-0

LP-A

10

195

10

170

14

299

Tload
(s)

0u-1

1_2

2_3

3_4

4_5

27

33

23

25

15

47

42

17

15

19

40

19

41

31-Mar-16
RL-730 AK (barat)
ADTV 2008/Rukli ADTV 3009/Supardi Mamonto
Travel Time (s)
segmen jalan
LP-0

L
E
L
E
L
E
L
E

:
:
:
n

0-0u

48

Tload
(s)
197

A-0

:
:
:

9
265

ADTK 2020/Setiawan Mokaagow

Travel Time (s)


segmen jalan

Tload
(s)

Date
Loading Area
Alat Angkut/Opr.
No.

LP-0

Date

Date
Loading Area
Alat Angkut/Opr.
No.

segmen jalan

Tload
(s)

LP-A

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5

51

42

20

22

23

38

25

45

38
49
41
63
67
72
70

66
56
68
53
72
45
68

23
25
24
22
27
23
20

20
22
20
25
23
25
20

28
22
19
19
19
16
17

43
37
41
30
28
34
30

27
23
23
16
23
18
17

37
49
40
46
33
46
39

4-Apr-16
RL-670 B (Utara)
ADTV 2011/Erten

Travel Time (s)


segmen jalan

No.

1
2
3
4
5
6
7
8

Tque
(s)

Tspot
(s)

81

45

383

42

108

38

221

42

290

39

211

42

214

48

151

Tload
(s)

150

138

140

137

136

11

198

10

157

10

153

45

Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5

Tque
(s)

Tspot
(s)

39

120

43

296

28

289

33

Tque
(s)

Tspot
(s)

141

11

163

10

197

145

134

33

74
47
70
45
70
51
73
49
56
54
75
52
60
52
81
53

LPu-0 LP-A

A-0

0-0u

BLU
74
65
94
65
68
54
75
48
71
54

L
E
L
E
L
E
L
E
L
E

1_2

2_3

3_4

4_5

40
35
28
27
35
36
37
37
37
36
37
35
39
34
40
33

19
20
27
20
20
24
23
24
24
24
21
22
28
22
26
23

38
43
41
35
33
36
34
36
29
40
37
35
31
35
35
35

22
28
27
25
19
21
22
20
25
22
19
21
19
20
21
20

42
36
45
30
41
33
41
37
43
35
45
32
40
34
41
35

0u-1

1_2

2_3

3_4

4_5

BLU
37
26
36
30
38
31
46
30
39
30

L
25
23
27
18
31
33
27
24
29
23

LU
48
45
47
64
53
51
44
48
47
48

L
28
28
23
32
31
30
32
28
29
28

L
41
45
43
40
45
41
42
42
47
42

11-Apr-16
RL- (utara) cover dump
ADTV 2014/Toto

Travel Time (s)


segmen jalan

Tload
(s)
167

0u-1

11-Apr-16
RL- (utara)
ADTV 2008/Toto

:
:
:

11
0

0-0u

Travel Time (s)


segmen jalan

Tload
(s)

Date
Loading Area
Alat Angkut/Opr.
No.

L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E

A-0

:
:
:

28

254

LPu-0 LP-A

L
E

LP-0

LP-A

65

81

49

71

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5
33
27

Date
Loading Area
Alat Angkut/Opr.
No.

Tque
(s)

Tspot
(s)

12-Apr-16
RL- (utara)
ADTV 2011/Stenly Tulenan

:
:
:
n

Travel Time (s)


segmen jalan

Tload
(s)

LP-0

LP-A

A-0

BLU
1
2
3
4
5

12
190

193

48

449

51

861

57

961

56

1019

56

12

212

11

255

11

267

10

261

Date
Loading Area
Alat Angkut/Opr.
No.

1
2

Tque
(s)

Tspot
(s)

39

10

255

31

10

246

Tspot
(s)
39

97
71
92
67
89
67
96
69
85
67

LPu-0 LP-A
L
E
L
E

Tload
(s)
175

2_3

3_4

4_5

U
17
15
18
20
20
22
19
19
18
19

U
29
30
31
37
37
33
39
36
33
35

19
18
24
21
21
21
21
17
22
18

34
33
35
36
37
35
36
31
37
32

2-May-16
selatan
ADT 2013

A-0

102
102
112
70

0-0u

0u-1

1_2

2_3

3_4

4_5

21
26
23
27

23
27
25
23

20
19
20
22

32
41
31
38

20
28
21
28

36
26
60
32

3_4
17
17

Travel Time (s)


segmen jalan
4_5
35
32

6-May-16
selatan
ADT 2014/Putra

:
:
:

10
166

BLU
27
33
26
34
28
34
32
22
29
29

1_2

Travel Time (s)


segmen jalan

Tload
(s)

Tque
(s)

0u-1

:
:
:

Date
Loading Area
Alat Angkut/Opr.
No.

L
E
L
E
L
E
L
E
L
E

0-0u

L
E

LPu-0 LP-A
145
103

A-0

0-0u
21
21

0u-1
17
18

1_2
15
17

2_3
27
26

DUMP TRUCK: ORE MINED

abeha

Kondisi

cerah

Tujuan
Alat Muat

:
:

Ore TR-Crusher/StockPile
EXVL 3006/Laadi Labani

Travel Time (s)


segmen jalan
7_8

8_9

9_SP SP-14 7_14

14_10

Total
Travel Tspot
Time (s)
(s)
10_SP

SB

5_6

6_7

38

12

52

23

76

491

30

10

50

18

71

419

35

11

48

18

89

490

26

10

51

24

80

464

13

33

52

20

80

502

28

50

18

78

461

Tdump
(s)

39

25

26

23

30

24

DUMP TRUCK: ORE MINED

aagow

Kondisi

cerah

Tujuan
Alat Muat

:
:

Ore TR-Crusher/StockPile
EXVL 3006/Laadi Labani

Travel Time (s)


segmen jalan
7_8

8_9

9_SP SP-14 7_14

14_10

Total
Travel Tspot
(s)
10_SP Time (s)

SB

5_6

6_7

42

11

43

19

52

391

21

37

17

40

323

Tdump
(s)

22

30

DUMP TRUCK: ORE MINED

ardi Mamonto
Travel Time (s)
segmen jalan
7_8

8_9

Kondisi

cerah

Tujuan
Alat Muat

:
:

Ore TR-Crusher/StockPile

9_SP SP-14 7_14

EXVL 3008/Robbyanto

14_10

Total
Travel Tspot
(s)
10_SP Time (s)

SB

5_6

6_7

35

11

56

25

57

459

7
8
8
19
7
8
7

32
36
26
55
32
44
23

11
11
12
10
10
18
13

57
50
63
58
44
46
48

18
23
21
19
17
17
22

71
67
64
74
67
79
62

478
478
470
509
469
491
456

Tdump
(s)

28

33

28

31

56

30

57

32

DUMP TRUCK: ORE MINED

Travel Time (s)


segmen jalan

Kondisi

cerah, becek, licin

Tujuan
Alat Muat

:
:

Ore OX-Crusher/StockPile
EXVL 3008/Wendi Tjarsadiwiryo

Total
Travel Tspot
Time (s)
(s)

Tdump
(s)

SB

5_6

6_7

7_8

8_9

28
10
18
29
19
8
30
7
17
7
8
9
7
6
6
7

31
28
33
20
36
14
33
17
31
17
31
18
32
17
31
17

13
10
10
7
10
7
10
8
9
7
9
7
10
7
10
8

27

42

9_SP SP-14 7_14


28

24
25
24
25
24
25
25

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
376
343
363
335
347
305
367
301
398
305
405
294
390
286
412
291

58

40
42

55

31

44

39
40
40
39
39
38

24

42

35

28

62
60
31

32

28

31

60
58
28

32

Tdump
(s)

50

31

50

31

45

33

33

37

20

32

22

33

20

31

20

33

DUMP TRUCK: ORE MINED


Kondisi

becek, licin, LP-1 Licin+undulasi, overall jalan licin, 9

Tujuan
Alat Muat

:
:

Ore ox-Crusher/StockPile

EXVL 3014/Steven Fadli Maniung ; EXVL 3008/Fekie F

Travel Time (s)


segmen jalan
SB

5_6

6_7

7_8

8_9

L
8
9
8
7
7
7
8
7
9
9

L
38
30
40
28
39
32
42
29
38
28

L
15
11
17
10
15
11
14
11
13
13

L
30

L
53

36
20
36
34

55
55
62
51

9_SP SP-14 7_14


LU
37
22
39
26
37
22
35
20
37
20

33

65

25

64

32

64

23

53

24

64

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
434
402
465
409
439
408
463
363
444
383

Tdump
(s)

33

22

33

37

23

33

27

33

28

33

DUMP TRUCK: ORE MINED

mp

Kondisi

becek, licin, LP-1 Licin+undulasi, overall jalan licin, 9

Tujuan
Alat Muat

:
:

Ore ox-Crusher/StockPile
EXVL 3008/

Travel Time (s)


segmen jalan
SB

5_6

6_7

7_8

8_9

8
7

29
24

9
9

20

41

9_SP SP-14 7_14


37
37

12

58

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
177
294

36

Tdump
(s)
33

DUMP TRUCK: ORE MINED

nan

Kondisi

becek, licin, LP-1 Licin+undulasi, overall jalan licin, 9

Tujuan
Alat Muat

:
:

Ore ox-Crusher/StockPile
EXVL 3015/Robby Moniung ; EXVL 3008/Fekie Fendi

Travel Time (s)


segmen jalan
SB
6
26
15
8
5
19
6
5
6
8

5_6
39
29
33
27
35
31
30
24
37
27

6_7
10
8
9
7
12
11
8
6
9

7_8
21
25
26
27
27

8_9
46
57
47
46
46

9_SP SP-14 7_14


BLU
38
26
35
26
32
17
39
27
59
24

14_10

Total
Travel Tspot
(s)
10_SP Time (s)

Tdump
(s)

BL
29

286
361
400
363
389
373
399
337
408
339

43

28

52

30

53

35

46

30

50

70

24

36

37

30

32

62

30

41

32

DUMP TRUCK: ORE MINED


Kondisi

cerah

Tujuan
Alat Muat

:
:

Ore TR-Crusher/StockPile
EXVL 3009/Erik Firnandi

Travel Time (s)


segmen jalan
SB

5_6

6_7

9
9
8
11

36
26
60
32

11
9
12
12

Travel Time (s)


segmen jalan
SB
5_6
8
32
10
22

6_7
9
8

7_8

8_9

9_SP SP-14 7_14

14_10

60
50
49
55

7_8
23

8_9
41

27
27
27
20

Total
Travel Tspot
(s)
10_SP Time (s)
57
36
37
44

454
426
485
414

28

25

28

25

Kondisi

cerah

Tujuan
Alat Muat

:
:

Ore TR-Crusher/StockPile

9_SP SP-14 7_14


55
32

Tdump
(s)

EXVL 3009/Erik Firnandi

11_14
53

Total
Travel Tspot
(s)
SP_11 Time (s)
445
59
71
430

Tdump
(s)
32

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

jarak (m)

1165

19.4167

2072.47

1222

20.3667

2072.47

1283

21.3833

2072.47

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

jarak (m)

1166

19.4333

2072.47

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

jarak (m)

1255

20.9167 2402.703

1241

20.6833 2402.703

1264

21.0667 2402.703

1365

22.75

2402.703

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

jarak (m)

wiryo

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

995

16.58

959

15.98

908

15.13

917

15.28

930

15.50

994

16.57

932

15.53

954

15.90

jarak (m)
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08

dulasi, overall jalan licin, 9-Sp licin+undulasi

niung ; EXVL 3008/Fekie Fendi Rembet

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

1060

17.6667

1146

19.1

1143

19.05

1059

17.65

1055

17.5833

jarak (m)

1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08

dulasi, overall jalan licin, 9-Sp licin+undulasi

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

740

12.3333

dulasi, overall jalan licin, 9-Sp licin+undulasi, hujan


; EXVL 3008/Fekie Fendi Rembet

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

982

16.3667

1099

18.3167

1136

18.9333

1151

19.1833

1137

18.95

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

972

16.20

983

16.38

Total
Cycle
Time (s)

Total
Cycle
Time
(min)

1180

19.67

jarak (m)

1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08
1840.81

1804.08

jarak (m)

2131.85
2131.85
2131.85
2131.85

jarak (m)

2131.85
2131.85

target

Keterangan
TR-Ore; truk lewat SB 45 s
TR-Ore; Tunggu exca LP: 181 s; air SP: 210 s
TR-Ore; antri 3 truk; exca prepare: 100s

Keterangan
antri 2trukl; material keras; prepare exca: 110s

Keterangan
antri 1 truk; ada exca lewat 123"; ADTV 2008/Rukli
antri 3 truk di Lp; ADTV 2008/Rukli
4-SB ada lv 13"
fuel 298"; antri fuel 307"; 2ADT 1Grader saling 75"

Keterangan

Keterangan
antri 1 truk LP; 4-SB antri 2truk 28"; SP grade; simpang 9"; kom 22"
antri 2truk LP; 1deret truk 1-SB 18"; doser 21"; 5-SB 2truk 29"; deret 1-0 5";
antri 1 truk 4-SB 19"; antri 1-0 3truk 56; 5-SB 8"
antri 1truk LP; 0-1 perbaikan jalan; 4-SB 30"; 5-SB 8"; 5-SB 7"; load prepare 38";
antri 1 truk SP
antri 0-1 5car; antri dari 2-LP 34"; 4-SB 2truk 27"; 5-SB 7"
antri 1truk LP; load prepare 58"; 0-1 antri; simpang 4car 51"
antri 2truk LP; tukar exca 83"
antri 2 truk

n+undulasi

embet

Keterangan

swing 60; LP-0 dozing jalan 24"; komunikasi 19"; EXVL 3014; 5-fuel 42" antri 1gd
129"; fuel 179; fuel-5 78+6"; simpang HM 14"; exvl 3014
antri 2 truk; swing 45; antri sp 1truk 23"; CT 40"; 3-2 1dert truk; exvl 3008
antri 1truk; swing 120; kencing 96; exvl 3014
antri 2truk; swing 150; exvl 3014; lv+adt di SB 57;
antri 2 truk; swing 90; exvl 3014

n+undulasi

Keterangan

SP ox becek undulasi, 4-3 deret 2 truk 33; 0-1 becek undulasi; SB 8,7

n+undulasi, hujan

Keterangan

antri 1truk; swing 60; exvl3008 BD 109; 5sb 1LV lewat; 9sp mundur grade +7%15%; material boulder
antri 2truk; awing 45; material boulder; 4sb 2LV: 15, hujan; SP kom 27
antri 3truk; swing 60 4Sb 5; kencing 87; 5-sb ada drill 19;
antri 3truk; swing 60; load prepare: 44; 4-3 1LV 13; 5sb 5; 4sb 6;
antri 3truk; swing 90; 4sb 6; 5sb 8; sp-14 dozer lewat 57;

Keterangan
kom 4s; kom 18s di sp; 2adt di 4-3 54s; adt dt di 3-2
load prepapre 35s; ft di sb 23s; dozer di 5-6; adt di lp

Keterangan
antri 1adt; xca di 9 129; antri dump 45s; dozing di wd 9s

utara-ox

utara-tr
18
30

no.

selatan-ox
30

antri di lp
1
2
3
4
5
6
7
8
9
10
11
12

161

13
14

214

15
16
17
18
19
20
21
22

254

23
24
25
26
27
28
29
30
31
32
33

1019

181
845
313
265
550
81
383
108
221
290
211
151
120
296
289
190
449
861
961

166

30

loading prepare
survey
181
100
110
38
58
83
109
44
35

delay (slow moving)


travel berderet (tire)
travel berderet (crawler)
undulasi
belok
penyempitan jalan

lpu-0

lps-0

y
10.08

delay (slow moving)


travel berderet (tire)
travel berderet (crawler)
undulasi
belok
penyempitan jalan

lpu-15

delay (slow moving)


travel berderet (tire)
travel berderet (crawler)
undulasi
belok

lpu-0

penyempitan jalan

lpb-0

lpb-15

lps-15

y
10.08

lpb-0

lps-0

y
10.08

selatan-tr

barat-ox
4
30

fuel exca

30

berpapasan
persimpangan
antri di jalan
123
45
75
13
56
28
21
9
33
29
13
19
19
30
54
27
129
51
14
57
22
13
23

dozing/grading
24
129
57
9

jumlah
0_1

1_2

2_3

3_4

4_5

y
10.949

15_16

16_17

17_18

y
y

0_1

1_2

18_19

19_20

2_3

1_x

x_y

9.695

barat-tr
4
30

ambil air ambil snack


ambil nasi
bak/b
210
40
44

komunikasi
96
87

main hp
22
19
27
4
18

5_6

6_7

7_14

20_21

20_wdr

21_wdr

y_cd

cd_3

y
y

y
y
5.689

14_10

10_sptr

7_8

y
y
y

cek tire

antri di sp
70
23
45

8_9

9_spox

y
y
y

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6

Tque
(s)
315
0

Tspot
(s)

:
:
:
n

Tload
(s)

LP-0

LP-A

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5

SB

5_6

6_7

7_8

8_9

9_SP

9_14

7_14

141
90

25
25

27
20

30
26

37
39

23
39

47
38

17
8

27
20

11
20

48
20

72

83

20

23

25

39

24

46

38

12

50

64

17

15

16

27

23

36

41

10

48

71

21

25

19

33

22

44

28

29

11

52

49

18

15

18

27

17

31

17

10

48

115

81

23

26

26

42

27

46

31

11

48

30

18

15

25

44

23

33

17

10

38

153

E
L

94

22

26

26

34

22

46

24

10

47

53

20

16

17

32

28

35

30

12

56

72

E
L

83

20

23

25

39

24

46

38

12

50

48

18

16

18

33

29

34

32

12

52

41
30
130

77

70
68
6

Travel Time (s)


segmen jalan

L
E

6
55

Tujuan
Alat Muat

119

7
840

Kondisi

7
30

28-Mar-16
RL-687 S (selatan)
DTMR 36/Keny ; DTMR 38/Riswandi

72

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3

Tque
(s)
401

Tspot
(s)

n
6

100

90

64

348

67

124

Kondisi
Tujuan
Alat Muat
Travel Time (s)
segmen jalan

Tload
(s)

35

729

29-Mar-16
RL-675 D_RL-672 A (utara)
DTMR 38/Setiawan

:
:
:

LP-0
L
E
L
E
L
E

121
46
104
45
90
119

LP-A

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5

SB

5_6

6_7

37
37
37
36
37
35

25
20
28
22
30
22

30
30
43
24
38
22

30
23
28
22
25
18

47
40
40
38
47
34

17
8
7
7
28
8

29
23
23
22
25
24

11
9
9
10
10
10

7_8

8_9

9_SP

9_14

7_14
50
45
57
45
54
41

4
5

217
230

94

81

46
47

L
E
L
E

80
89
92
91

39
34
40
33

27
16
37
19

39
27
37
33

27
22
27
25

48
37
42
34

9
6
6
8

29
25
25
24

11
10
10
10

60
47
49
50

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7
8
9
10
11
12

Tque
(s)

Tspot
(s)

51

n
7
5

52

53

731

45

5
5
63

40

204

41

5
6
0

75
98
82
117
77
120

38
6

90

90

41
6

331

125

112

47
9

36

40

6
6

184
133
116

Kondisi
Tujuan
Alat Muat
Travel Time (s)
segmen jalan

Tload
(s)

40
5

19-Apr-16
RL-685 o (selatan)
DTMR 2032/Saiful Bahri

:
:
:

LP-0

LP-A

A-0

0-0u

0u-1

1_2

2_3

3_4

4_5

SB

5_6

6_7

7_8

8_9

9_SP

18

40

30
25
28
25
29
25
34
24
30
30
30
23
29

L
E
L
E
L
E
L
E
L
E
L
E
L

132
106
129
101
130
101
132
105
124
100
129
117
127

25
44
27
33
26
31
23
27
22
28
25
29
24

28
40
32
27
31
25
28
21
28
20
30
34
29

18
30
20
16
20
18
16
16
16
14
20
15
15

22
45
28
43
31
76
24
36
24
37
22
45
28

22
22
19
18
23
26
23
18
20
16
20
20
24

31
25
36
60
33
36
33
30
37
29
38
29
37

8
8
9
9
10
8
10
6
9
8
13
7
7

31
19
25
22
26
21
27
20
24
20
25
16
23

8
9
8
8
9
9
8
8
8
8
8
7
8

E
L
E
L

92

31

27

16

46

22

38

18

126
101
126

23
32
20

28
27
29

26
18
23

45
40
24

22
47
26

40
18
37

8
6
9

26
26
25

8
7
8

108

30

25

16

40

20

30

18

120
104
129
101
128

26
31
30
30
23

30
26
40
25
29

17
15
20
14
19

32
37
29
73
19

23
20
21
20
24

37
30
34
34
69

8
8
8
7
8

40
19
25
15
25

8
8
7
7
8

E
L
E
L
E
L

16
16
16
18
18

36
35
45
49
36

18

35

20

37

20
16
16
17

35
35
35
41

9_14

7_14

30

42

29

42

28

43

29

47

38

40

26

41

25

31

42

28
30
27

38

41

30

34

41

40

41

32

39

30
30
30
25
30

12

195

40

105

30

22

16

16

20

30

17

25

34

39

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Tque
(s)
114

Tspot
(s)

Tload
(s)

101

46
5

193

275
631
244
292

96

37
5

113

34
5

103

100

33
6

87

29
5

105

31
5

47

87

39
5

94

90

35
5

20-Apr-16
RL-685 o (selatan)
DTMR 2034/vian

:
:
:

107

51
6

116

110

35
45
7

136

110

31
41
5

100

L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L

LP-0
94
122
101
90
119
80
101
77
116
95
136
81
112
81
122
77
127
92
96
69
100
77
110
88
105
90
106

LP-A

A-0

0-0u
24
38
26
33
26
36
34
26
28
28
28
28
26
24
28
21
20
20
32
27
30
22
25
45
26
26
28

0u-1
20
17
23
20
22
19
26
19
23
24
26
24
30
18
20
18
30
27
21
22
22
24
22
35
23
20
18

1_2
16
17
15
13
16
14
25
16
16
15
16
14
21
15
21
15
19
17
21
67
20
16
21
15
19
19
19

2_3
30
52
27
20
27
25
47
28
28
30
28
25
35
25
45
25
29
24
31
58
34
28
33
28
31
32
31

3_4
21
36
19
18
17
17
19
16
18
25
18
19
18
18
30
19
20
18
22
21
23
21
24
20
21
21
20

Kondisi
Tujuan
Alat Muat
Travel Time (s)
segmen jalan
4_5
SB
5_6
24
8
26
28
8
20
30
16
39
28
7
21
25
7
30
27
8
17
33
8
27
36
8
23
37
8
24
38
7
18
35
18
24
32
8
21
39
7
26
32
7
23
41
19
26
28
6
26
31
7
26
30
5
24
35
45
30
36
8
25
35
8
23
30
7
18
35
9
25
30
8
19
40
8
24
31
8
19
34
7
27

6_7
8
7
14
8
19
8
9
12
8
7
7
13
9
9
12
7
8
7
7
8
8
8
9
8
7
7
7

7_8
18

8_9
39

31

76

29

54

36

135

18

39

17

39

18

39

21

156

18

40

46

72

19

43

19

40

17

47

28

41

9_SP
15
23
22
22
25
28
69
21
27
16
31
26
22
27
26
23
18
21
28
20
25
17
22
21
24
17
31

9_14

7_14

23

43

23

44

27

46

20

66

19

40

26

50

23

48

31

39

27

50

49

36

20

42

29

42

27

39

14
15
16

388

32
5

67

78

40
6

553

135

36

Date
Loading Area
Alat Angkut/Opr.
No.

E
L
E
L
E

Tque
(s)

Tspot
(s)

237

37

70
80
68
100
75

19
16
25
26
24

Tload
(s)
103

L
E

15
15
13
14
15

24
30
28
30
28

17
22
18
20
18

30
30
30
34
30

5
6
8
8
8

22
22
22
28
22

7
7
7
9
7

16
19

39
40

21-Apr-16
RL-685o (selatan)
DTMR 2037/Bastian

:
:
:
n

21
19
17
20
20

LP-0
115
72

LP-A

A-0

0-0u
32
25

0u-1
34
19

1_2
10
19

2_3
26
36

3_4
18
28

19
22
19
25
19

27

38

27

34

24

40

9_14

7_14

23

54

Kondisi
Tujuan
Alat Muat
Travel Time (s)
segmen jalan
4_5
SB
5_6
32
31
24
53
8
25

6_7
7
8

7_8
16

8_9
44

9_SP
31
15

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7

Tque
(s)

Tspot
(s)

389

30

41

232

36

132

45

54

35

32

:
:
:
n

Tload
(s)

164

76

64

89

80

100

88

L
E
L
E
L
E
L
E
L
E
L
E
L
E

LP-0
118
101
115
100
115
85
116
75
108
80
112
95
115
95

LP-A

27-Apr-16
RL- (selatan)
dtmr 37/bastia; dtmr 35/sony; dtmr 40/risky
Travel Time (s)
segmen jalan
A-0 0-0u 0u-1 1_2
2_3
3_4
4_5
SB
5_6
28
17
17
32
21
36
17
25
23
20
18
31
23
30
12
25
25
26
26
30
21
36
10
26
20
22
17
32
27
37
11
29
22
24
15
36
22
38
9
24
20
22
32
60
23
32
9
22
28
24
20
37
22
42
12
33
24
21
16
30
22
33
11
24
28
22
17
30
21
37
8
30
20
17
15
27
19
35
27
25
27
19
17
33
20
38
14
26
22
17
18
29
26
31
9
25
19
18
17
31
20
32
11
26
25
18
15
30
19
33
7
25

Kondisi
Tujuan
Alat Muat

6_7
9
10
9
12
10
13
11
10
11
11
10
10
9
10

7_8

8_9

9_SP

9_14

7_14
50
46
46
55
56
43
53
50
46
50
47
50
53
50

8
9
10

33

84

89

105

40

70

35

39

L
E
L
E
L
E

134
91
120
83
125
85

27
24
21
24
24
26

22
19
18
19
23
20

22
14
19
15
19
18

37
29
33
30
36
30

22
23
21
26
21
23

38
32
35
35
35
35

9
8
8
10
8
8

28
27
26
23
28
23

10
13
9
9
11
9

52
50
49
53
49
50

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7
8
9
10
11

Tque
(s)

Tspot
(s)

:
:
:
n
9

120

37

245

53

6
5
208

58

411

29

6
6
413

33

47

7
7
215

37

75

33

6
6
165

45

40

39

6
6
151

33

Tload
(s)
167
92
73
93
83
117
115
93
97
103
142

L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E

LP-0
115
86
134
78
149
80
126
87
103
85
115
65
115
64
133
63
111
69
102
70
104
81

29-Apr-16
RL-685 o (selatan)
DTMR 2031/ ;DTMR 2037/Sony; DTMR 2038/setiawan
Travel Time (s)
segmen jalan
LP-A A-0 0-0u 0u-1 1_2
2_3
3_4
4_5
SB
5_6
22
22
19
32
23
30
16
29
40
21
26
43
29
35
7
34
30
50
25
35
23
34
6
28
50
35
18
34
26
35
13
28
33
26
24
36
23
83
8
33
22
16
20
36
28
41
8
28
27
24
23
37
24
41
16
33
25
20
17
37
29
30
9
30
22
21
19
27
17
40
11
29
24
19
48
60
23
35
8
28
32
19
18
37
17
41
7
28
19
17
35
23
21
35
10
32
28
21
21
34
17
42
7
28
18
12
15
25
21
34
7
31
32
24
18
30
24
23
8
30
21
19
16
26
21
37
9
22
31
20
20
44
23
38
6
31
22
19
16
27
22
33
7
22
21
19
19
27
20
35
7
24
33
33
18
31
23
33
6
26
18
18
15
25
16
36
7
30
22
16
16
21
18
30
9
25

Kondisi
Tujuan
Alat Muat

6_7
10
10
12
12
15
12
12
13
11
12
9
14
10
12
10
9
12
10
9
12
9
9

7_8
25
21
21
22
20
22
21
17
21
17
20

8_9
44
45
51
43
40
35
40
43
48
41
42

9_SP
52
26
32
36
56
56
42
52
40
37
31
60
35
24
30
30
29
31
32
29
39
38

9_14

7_14

30

51

24

56

27

60

28

49

28

44

25

56

35

63

30

42

31

51

29

44

36

44

12
13
14
15
16

6
222

100

L
E
L
E
L
E
L
E
L
E

25
6

235

27

155

29

105
100
112

226

39

51

6
93
6

120
67
109
71
115
81
151
80
189
68

29
23
19
22
28
31
33
21
40
25

24
18
15
19
24
25
28
19
35
20

22
15
15
14
20
26
19
18
18
16

35
23
26
22
32
72
32
21
32
25

24
25
18
16
24
19
30
19
24
18

36
31
32
28
36
25
30
35
45
30

9
7
8
8
12
14
24
10
7
7

29
24
23
18
32
17
24
24
33
24

10
10
7
11
13
9
9
10
13
10

19
25
28
23
24

43
38
57
54
55

29
40
28
27
35
24
48
50
33
26

43

42

22

45

34

40

29

56

27

44

DUMP TRUCK: OR
Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3

Tque
(s)

Tspot
(s)

117

21

129

40

41

2-May-16
RL- (selatan)
DTMR 2037/Bastian

:
:
:
n

Tload
(s)

125

94

102

L
E
L
E
L
E

LP-0
81
97
82
106
82
99

LP-A

A-0

0-0u
19
20
30
25
25
25

0u-1
19
17
23
21
16
20

1_2
12
14
18
18
16
16

2_3
28
29
28
35
32
28

3_4
17
17
19
29
21
19

Kondisi
Tujuan
Alat Muat
Travel Time (s)
segmen jalan
4_5
SB
5_6
31
5
22
34
7
22
35
12
21
43
13
31
34
15
28
34
7
29

6_7
10
10
10
11
11
11

7_8

8_9

9_SP

9_14

7_14
40
41
48
44
43
54

P TRUCK: ORE MINED


:

cerah

:
:

Ore TR+OX-Crusher/StockPile
EXVL 3008/Fekie Rendi Rembet+Nurhidayah Lahinda

14_10

Total
Travel Tspot
(s)
10_SP Time (s)

Total
Cycle
Time
(min)

jarak (m)

1244

20.7333

2294.11

1022

17.0333

2295.11

1136

18.9333

2296.11

1046

17.4333

2297.11

1112

18.5333

2298.11

1045

17.4167

2299.11

Total
Cycle
Time
(min)

jarak (m)

1174

19.5667

1973.198

1069

17.8167

1973.198

1219

20.3167

1973.198

Total
Tdump Cycle
Time (s)
(s)

20
59

61
70

514
474

52

44

14

35

416

52

51

17

80

401

20

52

427

103

45

16

80

354

17

92

479

33

33

13

44

316

21

35

413

48

39

15

69

391

14

35

416

52

51

13

69

382

P TRUCK: ORE MINED


:

cerah

:
:

Ore TR-Crusher/StockPile
EXVL 3013/Dedy

14_10
26
22
25
51
26
18

Total
Travel Tspot
(s)
10_SP Time (s)
84
98
43
21
65
81

507
401
444
343
475
432

Total
Tdump Cycle
Time (s)
(s)

84

47

84

44

77

44

21
16
17
18

80
69
64
72

470
398
446
417

76

64

79

58

1148

19.1333

1973.198

1128

18.8

1973.198

P TRUCK: ORE MINED


:

cerah, jalan licin, lp-1 becek undulasi, 14-10-spox-14 licin undulasi, lp luas, so luas

:
:

Ore ox-Crusher/StockPile
EXVL 3009/Junaedi Kauntu ; exvl 3015/Erwin S Mamonto

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
413
445
413
433
419
447
419
387
409
388
414
409
404

Total
Tdump Cycle
Time (s)
(s)

58

47

63

41

80

63

58

58

72

62

50

51

32

51

37

70

48

71

40

56

44

55

55

55

402
437
431
409
410
422
409
424
422
440

Total
Cycle
Time
(min)

1139

18.9833

1093

18.2167

1129

18.8167

1060

17.6667

1054

17.5667

1081

18.0167

1007

16.7833

1133

18.8833

1097

18.2833

1147

19.1167

1118

18.6333

1073

17.8833

jarak (m)

1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46

1073

367

17.8833

1962.73

P TRUCK: ORE MINED


:

cerah, jalan licin, lp-1 becek undulasi, 14-10-spox-14 licin undulasi, lp luas, sp luas

:
:

Ore ox-Crusher/StockPile
EXVL 3009/Junaedi Kauntu ; exvl 3015/Erwin S Mamonto

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
343
47
434
439
41
347
416
47
352
569
40
368
390
31
362
423
44
367
402
44
350
567
44
335
393
49
362
486
50
446
390
41
330
394
42
388
392
40
356
397
39

Total
Tdump Cycle
Time (s)
(s)
43
53
42
46
54
50
51
51
42
30
42
42
52
50

Total
Cycle
Time
(min)

1014

16.9

1005

16.75

983

16.3833

1159

19.3167

953

15.8833

1017

16.95

994

16.5667

1130

18.8333

1004

16.7333

1163

19.3833

958

15.9667

1033

17.2167

991

16.5167

932

15.5333

jarak (m)

1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46

314
324
316
373
330

36

35

59

46

932

15.5333

829

13.8167

979

16.3167

1962.73
1999.46
1962.73
1999.46
1962.73

cerah, jalan licin, lp-1 becek undulasi, 14-10-spox-14 licin undulasi, lp luas, sp luas

:
:

Ore ox-Crusher/StockPile
EXVL 3009/Junaedi Kauntu ; exvl 3015/Erwin S Mamonto

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
420
47
385

Total
Cycle
Tdump
Time (s)
(s)
43

1035

Total
Cycle
Time
(min)

jarak (m)

1999.46
1962.73

17.25

P TRUCK: ORE MINED


:

: cerah, material keras, DP sempit, 10-sptr undulasi

:
:

Ore tr-Crusher/StockPile
EXVL 3015/Robby Moniung ; exvl 3008/Fekie Ferdi Rembet ;

14_10
24
25
23
20
24
24
24
22
24
22
26
23
22
28

Total
Travel Tspot
(s)
10_SP Time (s)
77
471
54
127
491
59
452
43
47
429
56
451
48
76
461
54
476
40
76
414
52
434
32
62
410
54
443
41
74
429
55
428
30
78
433

Total
Tdump Cycle
Time (s)
(s)
55
52
52
53
52
53
50

Total
Cycle
Time
(min)

1265

21.0833

1093

18.2167

1112

18.5333

1117

18.6167

1062

17.7

1101

18.35

1061

17.6833

jarak (m)

2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85
2131.85

23
20
23
28
26
22

59
65
52
68
58
65

483
415
434
423
463
414

37

54

48

54

61

56

1113

18.55

1083

18.05

1138

18.9667

2131.85
2131.85
2131.85
2131.85
2131.85
2131.85

P TRUCK: ORE MINED


:

cerah, LP dan Sp undulasi

:
:

Ore ox-Crusher/StockPile
EXVL 3005/Rasman Rapiso

14_10

Total
Travel Tspot
(s)
10_SP Time (s)
439
25
438
475
22
445
558
24
434
470
29
426
400
13
451
411
29
412
419
22
361
422
22
345
434
31
360
373
37
387
379
29
365

Total
Tdump Cycle
Time (s)
(s)
54
59
54
44
52
58
50
50
49
44
56

Total
Cycle
Time
(min)

1160

19.3333

1146

19.1

1201

20.0167

1091

18.1833

1032

17.2

1074

17.9

1004

16.7333

965

16.0833

1016

16.9333

983

16.3833

1004

16.7333

jarak (m)

1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73

429
368
363
323
456
417
505
392
548
340

33

139

34

43

48

57

68

65

35

55

1094

18.2333

895

14.9167

1107

18.45

1181

19.6833

1122

18.7

1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73
1999.46
1962.73

P TRUCK: ORE MINED


:

cerah, LP dan Sp undulasi

:
:

Ore tr-Crusher/StockPile
EXVL 3015/ Fadli Mokaagow

14_10
18
20
20
21
22
19

Total
Travel Tspot
(s)
10_SP Time (s)
55
357
40
62
390
49
395
80
61
458
47
392
95
61
422

Total
Tdump Cycle
Time (s)
(s)
60
62
57

Total
Cycle
Time
(min)

993

16.55

1129

18.8167

1109

18.4833

jarak (m)

2131.85
2131.85
2131.85
2131.85
2131.85
2131.85

utara-ox
target

utara-tr
5
30

30

Keterangan

no.

Tque: tukar Exca 97; Ore-TR; DTMR36:Keny; 4SB 1truk


Ore-TR; antri 5 truk di SP: 15.35 s; kurang dozer; DTMR 38: Riswandi
Ore-TR; antri 1 truk; dumping area sempit-undulasi, DTMR 38
Ore-OX; 2LV di SB; dibelakang ADT; antri 3 truk di LP; coffee time: 45s 900s (15-15.15);
DTMR 38
antri di LP 1 Truk; material keras; shalat 900"; DTMR 38
antri 5 truk SP 933"; kurang doser di SP; DTMR 38

Keterangan
TR-Ore; antri 2truk LP
TR-Ore; antri 3truk LP; Exca Lewat 4-3
TR-Ore; antri 3truk LP

antri di lp

loading prepare

315

97

30

60

840

20

55

90

401

41

729

409

7
8
9
10
11
12
13
14
15
16
17
18

348

300
67
118
30
53
59

19
20
21
22
23
24
25

94

217
230
52
731
63
204
331
90
195
114
193

47
103
275
631
244
292

TR-Ore; antri 2truk LP


TR-Ore; antri 2truk LP; antri 1truk SP

p luas, so luas

Keterangan
lv+adt di 4-3: 26s; main hp di sp 30s
antri 1 truk di lp; 5-4 ada exca+grader; 4-sb antri 1 adt 12s;
antri 4truk di lp; ada survey di lp; 174s; load prepare 60s; 2-1 deret 2 adt; main hp di lp
30s;
antri 1truk di lp; antri di sp 3truk 90s; deret 2truk (tidak terdata); main hp di sp 27s
antri 3truk; fuel:263s (antri 2truk);155s;7ss; fuel exca (tidak terdata)
antri di sp adt 45s;

4
load prepare 20s;
antri 3truk; antri di sp adt 46s;
antri 1truk di lp; antri di sp 2dt 72s; antri di lp ada dozer 45; main hp di sp 15s

26
27
28
29
30
31
32
33
34
35
36

388
67
553
237
389
232
132
33
70
120
245

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

208

55
main hp di lp 10s;
load prepare 90s; 3-2 deret 1adt; ada lthn di 0; antri di 20 1 adt 2dt 162
antri 1truk di lp; antri di sp 3dt, 1adt 301s; 4-5 ada 2adt berderet

411
413
215
75
165
40
151
222
235
155
226
48
117
129

antri 1truk di lp; antri di sp 3dt, 1adt 301s; 4-5 ada 2adt berderet

p luas, sp luas

5
Keterangan
antri 1dt; load prepare 41s;antri 2dt di sp 91s; 5-1 deret adt+dt; 0-lp deret dt+adt
antri 2dt; 5-spox adt; antri di sp adt+dt 95s; fuel 39s,145s,57s; 5-sb dt; antri di sp 1dt; 30s
fueal exca jam10 373s; 6-spox adt; antri di spox 1adt 33s; kencing 50s; 0-lp adt 24s;
antri 1adt; 1-3 adt; 6-spox 2adt; antri di sp 2adt 107; ambil konsum 51s; komunikasi 12
antri 1adt; isi form p2h di sp 34; lp dt 32s
4-sb 1adt; di lp dt 11s;
antri di sp 2dt 145s
antri 1dt dilp; komunikasi 25s; 1-spox 1dt; antri di sp 1dt 34s;
tunggu exca 409s; lp-0 2dt 15s
antri 2truk di lp; 4-sb dt 45s; 6-9 2adt, ada dozer; 3-1 2lv+1adt
antri 4dt di lp; 1dt di lp 20s
antri 2dt di lp; 1-lp deret 2adt;
antri 2dt di lp; kencing 58;
antri 3dt di lp; ambil snack 52s; komunikasi di sp 20s; ambil air 245

antri 3dt di lp; ambil snack 52s; komunikasi di sp 20s; ambil air 245
antri 2truk di lp; charge battrai ht 9"
antri 4dt di lp; dozing di lp 32; exca lewat di lp 24

p luas, sp luas

Keterangan
antri 2dt; 0-1 adt; antri di 8-9 3dt+2adt 419s; antri di sp 2dt+adt 287s; 5-sb 1adt; 14-lp
sambil makan

Keterangan
antri 3dt di lp; load prepare 300s; kom 10; miskom 78
exvl 3015 bd 10.30; dt di lp 8s; ada lv di sptr 11s; ada dt di 14-7 7s; cek lampu 54s; masuk
workshop
antri 2dt; ada dt di 7-14; kom 24s; ada dt di sptr 21s; dozing di sp 33s; ada adt di 3-1
antri 1dt; load prepare 67; ada dt di 14-7 13s
load prepare 118; bak 45; 4-sb adt+ft 36; sb-14 adt; di sb ada 2motor+lv
exca no operator: 30; di 2-1 ada fthn 8
ambil snack 83; telfon 22; antri dt di sptr 58; simpang 4 adt 38

coffee time 515


antri 1dt; simpang 6; antri adt di sp 56; simpang 1dt 11; 1adt di sb 12; simpang 1 adt; 7
clear

Keterangan
antri 2dt; berpapasan di 2 4s; ada lv di 0 4s; dozing di sp 22s; adt di 4-sb; sb-0 ada adt+lv;
kom 13s; 4-3 adt 17s
antri 1dt; berpapasan dt di lp 16; ada exca di 0u-1; berpapasan dt di 6-7 11s; antri
dumping 1adt 56; ke workshop 282s; dt 1-0
antri 2adt; ada 3 exca di 14-7; ada dt+dozer di sb 45s; ada manhaul di sb: 33; ada doser
5-6; antri 1dt di sp 93s; 4-5 ada dozer
antri 2 adt; ada dt di lp 37s; kom 20; fuel 48; 242;86; di sb dt+truk 24;
antri 3dt; survey 160s; ada adt 4-0; berpapasan adt di lp 8s; ada dumping di sp 27s
main hp sp-4; main hp di lp 77s; berpapasan di sp 8s; berpapasan di lp dt 9s
antri 2dt; kencing 65; kom di sp 44; pindah dumpingan 46
antri 1dt; kom 71s; ambil konsum 15s; persimpangan lv 10s
antri 1dt; load prepare 53; berpapasan di lp 23s; ada dt di 0 12s; ada exca di 3; ada lv+adt
di lp 23s
antri 1dt; dt di lp 27s; konsum 13; grader di 0 18
antri 1dt; adt di sb 8; ada exca di sp 23s; pindah dp 52s; lv bagi snack di 14 225s; dt+adt
di lp 120s

antri 2dt; dumping ulang, masih ada material; cek tire 8s;
antri 2dt;
antri 1dt; 5-6 ada exca+fthn+adt 46s; ada lv di sb; adt 3-0
antri 2 dt; adt di sb 7s; dumping tidak pas; ada adt di sp 46; load prepare 59
ambil snack 30, 20; ada 3 lv di sb 62s

Keterangan
antri 1dt; antri 3dt di sp 392s
antri 1dt; dt 25s; antri sp 2dt 156; dozing di sp 179s; pindah lp 48s; water truck 30s;
survey di sp 24s
sb lv; dozer 7-14 9s

selatan-ox

selatan-tr
30

survey

fuel exca

6
30

174

berpapasan persimpangan
antri di jalan
dozing/grading
ambil air ambil snack ambil nasi
417
25
9
162
45
245
45
51

160

373

24

26

18

12

33

52

24

12

45

22

83

32

38

419

18

30

11

15

11

20
9
8
11
7
13
4
4
13
17
16
45

12
7
10

33
37
24
8
17
23
27

20

10

18
23
8
23
120
225
46
62
25
9

bak/b komunikasi main hp cek tire


50
12
30

antri di sp isi form p2h lain


935
34

54 cek tire

58

25

30

933

45

20

27

49

46 pindah dumping

65

10

15

90

52 pindah dumping

78

10

45

24

77

46

22
13
20
15
13

72
301
91
95
30
33
107
145
34
287
21
58
56
56
93
37
27
44
46

282 ke workshop

8 cek tire
30 water truk

392
156
179

Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5

No.

1
2
3

Tque
(s)

Tspot
(s)

n
8

196

Tload
(s)
187

36
8

163

30

45

50

28

33

131
115

125

121

170

24

50

59

150

21

46

66

170

18

50

55

114

16

43

41

L
E
L
E
L
E

142

24

47

50

143
143
109
159
112

13
22
20
27
17

38
48
40
41
41

37
57
31
51
35

31-Mar-16

Loading Area
Alat Angkut/Opr.

:
:

RL 687 L (Selatan) + RL-730 AK (Barat)

Tque
(s)

Tspot
(s)

20

250

57

114

Tload
(s)

146

140

153

38

Date
Loading Area
Alat Angkut/Opr.

L
E

LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18

Date

No.

30-Mar-16
RL-697 T
ADTV 2016/Franky
Travel Time (s)
segmen jalan

:
:
:

Tque
(s)

Tspot
(s)

39

39

LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18


L
E
L
E
L
E
L
E
L
E

:
:
:
n

Tload
(s)

11

183

11

184

ADTK 2020/Setiawan
Travel Time (s)
segmen jalan
54
46
62
32
50
35

31
12
25
28
26
21

62
63
81
59

52
32
50
47
47
40

55
28
59
37
54
35

9-Apr-16
RL-670 A (utara)
ADTV 2011/Stenly Tulenan
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18

L
E
L
E

65
68
91
70

41
32
40
30

22
10
25
9

41
35
41
27

45
22
45
23

3
4
5

11

179

12

262

10

224

53

277

42

522

47

Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7

Tque
(s)
0
404
314

Tspot
(s)

11

147

10

140

11

166

13

214

11

174

11

160

10

155

42

39

737

Tload
(s)

44

35

36
34

Date
Loading Area
Alat Angkut/Opr.
No.

Tque
(s)

Tload
(s)

31

15

284

Date
Loading Area
Alat Angkut/Opr.
No.

1
2

Tque
(s)
0

Tspot
(s)

L
E
L
E
L
E
L
E
L
E
L
E
L
E

L
E

:
:
:
n

Tload
(s)

145

150

39

21
11
26
8
25
11

46
40
46
32
52
35

50
32
48
27
49
30

LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18

:
:
:

Tspot
(s)

43
34
43
34
40
72

12-Apr-16
RL- utara
ADTV 2011/Stenly Tulenan
Travel Time (s)
segmen jalan

:
:
:

40

241

97
71
94
72
68
71

L
E
L
E
L
E

L
E
L

90
62
95
63

35
24
41
36

18
13
22
13

44
33
43
35

44
30
46
35

94
67
91
71
83
70
90
80
76
69

39
31
37
35
38
38
48
32
40
35

21
17
22
15
24
15
22
12
23
12

45
33
44
32
42
39
44
33
46
29

44
30
45
31
45
34
45
26
51
29

12-Apr-16
RL- selatan
ADTV 2011/Stenly Tulenan
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18
137

22

52

103

55

5-May-16
RL- selatan
ADTV 2016/Adrian ADTV 2014/Putra S mamonto
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18
121
40
52
53
120
12
37
31
127
19
45
41

2
3
4
5
6
7
8
9
10

37

67

226

83

67

67

36

51

180

52

76

145

129

142

137

155

130

163

140

50

Date
Loading Area
Alat Angkut/Opr.
No.

Tque
(s)

Tspot
(s)

387

32

:
:
:
n

Tload
(s)

165

Date
Loading Area
Alat Angkut/Opr.
No.

Tque
(s)
163

Tspot
(s)

1
2
3

Tque
(s)

Tload
(s)

157

32

Tspot
(s)

32

120

24

131

50

L
E
:
:
:

Date
Loading Area
Alat Angkut/Opr.
No.

E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E

L
E
:
:
:

Tload
(s)

12

239

185

127

L
E
L
E
L
E

117
123
113
130
142
113
139
157
129
119
146
71
140
125
131
126
130

12
19
24
19
18
19
14
23
12
30
12
24
11
24
14
23
12

32
44
35
42
48
40
37
38
35
43
40
45
34
43
39
40
35

31
39
30
41
34
36
24
42
20
45
28
44
20
60
30
41
25

7-May-16
RL- utara
2014/Putra S mamonto
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18
48
30
23
43
47
44
24
12
31
21
11-May-16
RL- utara
2014/Toto
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18
49
35
27
47
64
41
23
12
38
28
13-May-16
RL- utara
ADT 2016/Franky 2012/Sutardi moko
Travel Time (s)
segmen jalan
LP-15 LP-A A-15 LP-0U 0U-15 15-16 16-17 17-18
49
31
18
39
41
46
24
12
36
31
63
31
20
40
42
46
31
14
43
31
86
26
23
43
45
90
24
12
38
24

DUMP TRUCK: WASTE MINED


Kondisi

: Hujan, Jalan becek


: Waste mined/ WD Dur
: EXVL 3006/Laadi Labani

Tujuan
Alat Muat

18-19 19-20 20-21

20-WD

21-WD

Total
Travel
time (s)

Tspot
(s)
40

33

25

34

42

33

42

32

45

50

55

48

44

160

610

57

33

41

147

561

57

52

30

124

556

61

40

22

113

450

74

54

30

132

553

50
71
66
70
45

32
52
31
51
36

28
30
28
37
28

136
129
124
105
105

477
552
449
541
419

Total Cycle
Tdump Time (s)
(s)

Total
Cycle
Time
(min)

1467

24.45

1226

20.4333

1270

21.1667

1228

20.4667

1209

20.15

DUMP TRUCK: WASTE MINED

arat)

Kondisi

: Cerah

Tujuan
Alat Muat

: Waste Mined/WD Dur

18-19 19-20 20-21


89
42
75
50
72
46

56
25
52
37
53
29

20-WD

34
19
32
28
30
15

: EXVL 3008/Robbyanto ; EXVL 3006/Laadi Labani

21-WD
122
90
57
31

Total
Travel
time (s)
493
294
474
353
413
280
0
0
0
0

Tspot
(s)

Total Cycle
Tdump Time (s)
(s)

20

25

24

33

25

34

Total
Cycle
Time
(min)

998

16.6333

1081

18.0167

943

15.7167

DUMP TRUCK: WASTE MINED


Kondisi

: cerah, LP banjir, lintasan LP-0 becek


: WD Dur/Waste/sub grade, keras, blsting material
: EXVL 3013/Rudi Mamonto ; EXVL 3009/Mohammad Rizky Siliware

Tujuan
Alat Muat

18-19 19-20 20-21


81
41
74
43

42
24
45
45

42
60
42
23

20-WD

21-WD

Total
Travel
time (s)

87
60
83
52

466
352
486
322

Tspot
(s)

Total Cycle
Tdump Time (s)
(s)

18

26

15

28

Total
Cycle
Time
(min)

1084

18.0667

1074

17.9

mamonto

81
47
78
46
83
46

46
24
49
26
51
27

50
97
52
108
56
103

434
356
436
353
424
395

26

33

26

30

29

31

1081

18.0167

1149

19.15

1150

19.1667

DUMP TRUCK: WASTE MINED


Kondisi

: cerah, jalan lembab, LP becek undula


: waste dump durian 1
: EXVL 3008/Fekie Fendi Rembet

Tujuan
Alat Muat

18-19 19-20 20-21

20-WD

21-WD

Total
Travel
time (s)

Tspot
(s)

65
38
68
48

48
29
50
30

44
28
44
44

75
88
78
78

463
345
487
382

35

31

25

33

72
44
72
41
71
49
71
41
75
44

44
29
49
30
46
28
46
30
54
23

37
40
38
27
41
28
40
32
42
33

75
81
82
65
108
59
85
62
86
60

471
372
480
347
498
360
491
348
493
334

31

33

44

28

32

31

30

30

33

33

Kondisi

20-WD

1061

17.6833

1111

18.5167

1115

18.5833

1148

19.1333

1134

18.9

1095

18.25

1082

18.0333

: cerah, jalan lembab, LP becek undula


: waste dump durian 1
: EXVL 3008/Fekie Fendi Rembet

Tujuan
Alat Muat

18-19 19-20 20-21

Total
Cycle
Time
(min)

Total Cycle
Tdump Time (s)
(s)

21-WD

Total
Travel
time (s)

Tspot
(s)

211

54

Total Cycle
Tdump Time (s)
(s)
38

167

754

Total
Cycle
Time
(min)
12.5667

DUMP TRUCK: WASTE MINED


Kondisi

: cerah, undulasi
: waste dump durian 1 kanan
: EXVL 3009/ ; exvl 3005/

Tujuan
Alat Muat

18-19 19-20 20-21


72
54
42
34
60
50

20-WD
42
39
32

21-WD

Total
Travel
time (s)
434
315
374

Tspot
(s)

Total Cycle
Tdump Time (s)
(s)

31

35

50

30

Total
Cycle
Time
(min)

999

16.65

941

15.6833

oko

40
60
38
64
55
62
40
69
40
71
44
73
43
81
53
45
43

29
42
20
41
37
39
37
45
25
45
27
48
28
60
35
45
30

39
38
32
29
46
23
45
31
37
33
46
38
50
53
52
30
50

300
365
292
366
380
332
336
405
298
386
343
343
326
446
354
350
325

Kondisi

20-WD

21-WD
116
140

Kondisi

20-WD

21-WD
133
91

Kondisi

20-WD

32

31

31

39

29

42

29

38

25

50

42

30

32

15.6333

1028

17.1333

939

15.65

975

16.25

991

16.5167

913

15.2167

1107

18.45

927

15.45

Total
Travel
time (s)
472
352

Tspot
(s)
46

Total Cycle
Tdump Time (s)
(s)
27

1094

Total
Cycle
Time
(min)
18.2333

Total
Travel
time (s)
552
333

Tspot
(s)
43

Total Cycle
Tdump Time (s)
(s)
36

1153

Total
Cycle
Time
(min)
19.2167

: cerah, undulasi
: waste dump durian 1/waste-sub
: EXVL 3015/

Tujuan
Alat Muat

18-19 19-20 20-21


62
42
38
38
28
26
69
44
39
67
33
31
66
44
36
40
32
24

38

938

: cerah, undulasi
: waste dump durian 1
: EXVL 3009/

Tujuan
Alat Muat

18-19 19-20 20-21


84
67
46
41
29
30

34

15.6833

: cerah, undulasi
: waste dump durian 1
: EXVL 3009/

Tujuan
Alat Muat

18-19 19-20 20-21


77
46
42
34
24
22

35

941

21-WD
112
127
135
140
135
123

Total
Travel
time (s)
432
368
483
436
504
407

Tspot
(s)

Total Cycle
Tdump Time (s)
(s)

32

33

40

29

32

36

Total
Cycle
Time
(min)

1136

18.9333

1197

19.95

1156

19.2667

target

jarak (m)

Keterangan

1746.303

Waste mined; 3DTMR lewatdi WD: 45s; antri 1 truk; exvl


prepare jalan: 45s

1746.303

waste mined; antri 1 truk

1746.303

waste mined; antri 1 truk

1746.303

waste mined; bak di WD: 67s; dozer di 5: 25s; 2DTMR


lewat: 20s

1746.303

waste mined; coffee time: 120s

Laadi Labani
jarak (m)

Keterangan

1686.925

waste mined; ambil air: 180s; RL 687 L (Selatan); ADTK


2020_EXVL 3008

2017.158

waste mined; komunikasi: 120s; antri 3 truk di LP; RL-730


AK; ADTK 2020_EXVL 3008

2017.158

waste mined; antri 2 truk di LP; RL-730 AK; ADTK


2020_EXVL 3008

sting material
009/Mohammad Rizky Siliware (support)
jarak (m)

1871.765
1871.765

Keterangan
swing 90, komunikasi waste ore 234", WD 1
swing 90, WD 1

LP utara
banjir; LP
utara-0u:
becek,
undulasi;
0u-15
undulasi;
16-17
undulasi;
WD kanan20 undulasi

1386.992
1387.992
1388.992

swing 60; dozing di WD kanan 10"; 18-LP deret 1truk


swing 60; 12" di 0u simpang 2truk; material keras

LP utara
banjir; LP
utara-0u:
becek,
undulasi;
0u-15
undulasi;
16-17
undulasi;
WD kanan20 undulasi

swing 60; di 0 lv lwat 10"; konsumsi 25"; deret 1sandvik 15-0

jarak (m)

1871.765
1871.765
1871.765
1871.765
1871.765
1871.765
1871.765

Keterangan
swing 45
antri 2truk; swing 60
antri 2truk; swing 60; komunikasi 47
antri 1truk; swing 90; load prepare 88
swing 60; WD beda jalur
swing 45;
antri 2truk; LP kering

jarak (m)

Keterangan
load prepare 106

447.492

jarak (m)

Keterangan

1386.992 adt di 0 9s; adtv 0-17


1386.992
1386.992 adt di 0 13s; survey 206s

adt di 0 13s; survey 206s


1386.992
1386.992 kencing di lp 60; load prepare 25s;
1386.992
1386.992 antri 1adt; papas adt 0-lpb 13s
1386.992
1386.992
1386.992
1386.992 0-f-0 205; 271; 278; lv di lp 11s
1386.992
1386.992 adt lp-0; dozing di lp 97s
1386.992
1386.992 lv di lp 18s; papas 2adt 13s;17s;17s
1386.992
1386.992 antri 1adt; ambil snack 27s; adt di lp 18s; 2 adt wd-17
1386.992
1386.992 antri 1 adt 76s; antri dumping 38s
1386.992

jarak (m)

Keterangan

1871.77 antri 2 adt; kom 14s; ambil air 240s; kom 31; ganti
1871.77 operator 897s

jarak (m)

Keterangan

1871.77 antri 1adt; kom di lp 6; deret 2 adt 16-wd; papas 1adt di


1871.77 wd

jarak (m)

Keterangan

1871.77 subgrade
1871.77
1871.77 antri 1adt; load prepare 123; papas 1adt di lp 22; bak 53;
1871.77 cek alat 20; papas di 1 12s;
1871.77 antri 1adt
1871.77

utara-wd

utara-wdr selatan-wd
12
30

no.

30

selatan-wdr

6
30

barat-wd barat-wdr
2
30
30
30

antri di lp loading prepasurvey


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

196
163
45
250
114
277
522
404
314
241
737
226
180
76
387
163
120
131

45
88
106
25
123

fuel exca berpapasa persimpan


206

45
25
20
10
9
13
13
11
18
13
17
17
18
22
12

12

antri di jal dozing/gra ambil air


10
97

180
240

ambil snacambil nasi bak/b


120
27

25

komunikasimain hp
67
60
53

120
234
47
14
31
6

cek tire/alaantri di wd isi form p2h


20

38

lain-lain
897 ganti operator

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5

Tque
(s)

Tspot
(s)

280

55

:
:
:
n
6
5

287

151
125

Tload
(s)
110

LP-15

LP-A

A-15

LP-0U

0U-15

Kondisi
Tujuan
Alat Muat

15-16

16-17

17-18

18-19

19-20

20-21

142

15

37

34

54

35

20

110

14

32

26

42

30

25

84

143

16

36

37

51

35

18

132

10

29

33

41

32

13

107

E
L

136

18

40

34

55

35

20

E
L
E
L
E

102

26

35

34

49

35

22

150
100
260
95

22
12
20
10

44
25
43
37

45
22
50
33

59
40
53
45

40
37
34
37

22
21
20
20

52
6

320

28-Mar-16
RL-687 S (Selatan)
DTMR 2036/Keny
Travel Time (s)
segmen jalan

50
7

136

118

45
63

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5

Tque
(s)

Tspot
(s)

27

113

29

438

23

42

228

37

100

83

168

98

124

Kondisi

RL-685 T (Selatan)

DTMR 2032/Irlan

Tujuan
Alat Muat

Travel Time (s)


segmen jalan

Tload
(s)

1-Apr-16

:
:

LP-15
L
E
L
E
L
E
L
E
L
E

152
50
137
17
132
45
53
30
48
28

LP-A

A-15

LP-0U

0U-15

15-16

16-17

17-18

18-19

19-20

20-21

23
12
23
13
20
11
17
12
15
11

73
33
40
31
33
26
35
26
39
30

88
33
60
39
33
31
41
32
41
32

50
50
50
45
47
39
49
39
49
41

78
34
47
30
35
30
37
26
49
27

50
22
30
37
31
19
29
21
30
19

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4

Tque
(s)
28
56
82
45

Tspot
(s)

2-May-16
RL-685 T (selatan)
ADTV 2013/ I Made
Travel Time (s)

:
:
:
n

56

109

80

70

27
29
24
30

Tujuan
Alat Muat

segmen jalan

Tload
(s)

Kondisi

L
E
L
E
L
E
L
E
L
E

LP-15
111
61
129
36
150
26
140
33

LP-A

A-15

LP-0U

0U-15

15-16
20
15
23
12
17
10
23
15

16-17
38
40
30
40
27
30
37
37

17-18
33
47
48
40
33
31
45
36

18-19
58
70
70
69
40
35
59
38

19-20
35
27
53
80
32
24
42
26

20-21
19
21

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5

Tque
(s)
0
0
0
0
0

Tspot
(s)

:
:
:
n

Tload
(s)

83

95

164

65

80

55
70
60
41
46

L
E
L
E
L
E
L
E
L
E

LP-15
70
55
76
59
72
57
75
97
80
46

LP-A

A-15

2-Apr-16
RL-687 S Selatan
DTMR 2008/Aldris H. Panto
Travel Time (s)
segmen jalan
LP-0U
0U-15
15-16
20
17
17
20
21
17
17
17
18
17

Kondisi
Tujuan
Alat Muat

16-17
39
39
39
44
45
46
39
43
39
47

17-18
43
35
45
53
43
34
45
35
40
60

18-19
55
52
55
51
60
46
61
50
53
49

19-20
45
45
45
42
43
42
35
36
36
41

20-21

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6

Tque
(s)

Tspot
(s)

128

31

245

39

73

38

436

36

363

39

165

:
:
:
n

Tload
(s)

165

133

95

96

60

144

31

L
E
L
E
L
E
L
E
L
E
L
E

LP-15
119
92
97
98
117
95
119
106
117
90
147
90

LP-A

A-15

21-Apr-16
RL-685 0 (Selatan)
DTMR 2037/viyan
Travel Time (s)
segmen jalan
LP-0U
0U-15
15-16
16
9
15
9
18
10
13
17
17
18
21
11

Kondisi
Tujuan
Alat Muat

16-17
31
27
27
27
26
33
30
40
39
32
37
27

17-18
35
18
26
17
28
17
28
26
35
16
30
24

18-19
48
30
43
30
49
43
47
37
45
35
50
36

19-20
36
29
23
23
27
32
27
32
27
29
35
28

20-21
28
24
23
19
26
25
30
25
20
28
25
22

DUMP TRUCK: WASTE MINED


Date
Loading Area
Alat Angkut/Opr.
No.

1
2

:
:
:

Tque
(s)

Tspot
(s)

45

Tload
(s)
150
145

433

48

Date
Loading Area

L
E
L

LP-15
145
103
180

94

:
:

LP-A

A-15

27-Apr-16
RL- selatan
DTMR 2033/Bastian Mamonto
Travel Time (s)
segmen jalan
LP-0U
0U-15
15-16
23
13
22
14
4-May-16
RL- 0 (Selatan)

Kondisi
Tujuan
Alat Muat

16-17
42
40
53

17-18
35
36
39

18-19
72
49
45

19-20
66
40
32

20-21
39
27
24

42

27

65

31

30
Kondisi
Tujuan

Alat Angkut/Opr.
No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Tque
(s)

Tspot
(s)

660

51

34

183

49

145

41

722

37

815

50

246

66

455

35

335

47

213

36

461

37

204

53

41

43

:
n

Tload
(s)

113

111

114

106

97

84

83

141

103

120

208

108

86

116

L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E

LP-15
141
119
148
97
123
117
127
118
129
103
177
96
126
102
134
121
141
108
148
107
116
100
137
110
148
121
110
100

LP-A

A-15

DTMR 2037/viyan
Travel Time (s)
segmen jalan
LP-0U
0U-15
15-16
17
9
14
10
15
11
14
9
13
7
17
10
19
9
20
11
20
10
20
14
15
12
16
9
16
26
15
13

Alat Muat

16-17
32
38
44
25
38
32
31
24
32
24
32
26
43
35
47
26
29
29
27
35
29
39
47
37
30
47
29
30

17-18
32
17
33
18
50
20
33
24
29
22
30
25
25
21
27
26
46
17
30
33
31
37
65
23
37
29
32
29

18-19
47
28
62
28
61
28
44
31
42
28
74
36
40
37
46
38
47
29
47
35
43
46
87
28
46
37
46
37

19-20
28
18
37
23
37
23
28
22
30
22
51
27
24
26
29
41
33
20
29
26
29
25
57
20
34
24
33
29

20-21
23
14
27
21
25
17
25
21
34
15
41
23
20
24
23
19
29
20
24
23
28
21
35
22
25
21
27
33

Date
Loading Area
Alat Angkut/Opr.
No.

1
2
3
4
5
6
7

Tque
(s)

Tspot
(s)

33

149

38

234

32

134

33

38

242

29

118

34

8
174
9
10

Tload
(s)

37

45

LP-15

115

140

97

112

118

193

93

L
E

108

L
E
L
E
L
E

29

161

6-May-16
RL- 0 (Barat)
DTMR 2037/viyan
Travel Time (s)
segmen jalan

:
:
:

108

102

L
E
L
E
L
E
L
E
L
E
L
E

LP-A

A-15

LP-0U

0U-15

Kondisi
Tujuan
Alat Muat

15-16

16-17

17-18

18-19

19-20

115
81
112
92
100
63
90
104
105
83
117
92
105
88

13
14
13
12
12
8
13
12
13
13
15
12
12
12

33
26
36
25
27
26
32
25
28
26
33
27
37
32

35
18
33
20
38
19
30
25
20
20
33
19
30
20

45
30
47
51
46
32
44
29
45
26
44
44
45
36

35
20
32
35
35
33
29
19
28
23
35
21
30
22

137

13

32

31

48

31

89
121
76
90
80

10
13
12
15
12

35
25
27
30
30

20
32
22
34
21

29
45
30
47
34

24
32
24
35
20

20-21

E MINED
: Cerah
: Waste Dump Durian
: EXVL 3008

uat

20-WD

21-WD

Total
Travel
time (s)

Tspot
(s)
15

40

32

35

12

37

23

37

42

37

80

417

104

383

80

416

105

395

90

428

111

414

89
103
59
72

471
360
539
349

target

Total
Tdump Cycle
Time (s)
(s)

Total
Cycle
Time
(min)

jarak
(m)

no.
1

Keterangan

1020

17.00

1746.3 menunggu exca 97s

1014

16.90

1746.3 fuel time: 685s

1048

17.47

1746.3 antri truk; ada survey 465s

1072

17.87

1746.3 tukar exca, 165s

1148

19.13

1746.3 pembagian konsum LP 45s

E MINED

2
: Cerah
: Waste Dump Durian

uat

: EXVL 3013/Robbyanto

20-WD

selatan-wd
11
30

21-WD

Total
Travel
time (s)

52
57
71
43
73
50
74
42
80
49

566
291
458
255
404
251
335
228
351
237

Tspot
(s)

Total
Cycle
Tdump
Time (s)
(s)

26

47

23

46

19

51

24

53

21

51

Total
Cycle
Time
(min)

jarak
(m)

Keterangan

1057

17.62

x-LP-y; 18-19 perbaikan jalan: 53"; 15-20 ada water truk;


1746.3 3 deret truk 15-20; load prepare 22"

894

14.90

x-LP-y; antri 2truk; LP-fuel_fuel_fuel-LP: 317"_220"_240";


1746.3 17-WD perbaikan jalan: 23"

916

15.27

x-LP-y; antri 2truk; 1 deret ADT; material keras; load


1746.3 prepare 32", simpang 17"

780

13.00

pindah LP-utara 690 FD D EXVL 3008: Hendra Batalipu,


1746.3 deret 1ADT 17-WD

821

13.68

antri 2truk; pindah LP-utara 690 FD EXVL 3008: Hendra


1746.3 Batalipu, deret 2ADT 17-WD; load prep 40"

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

E MINED

3
: Cerah
: Waste Dump Durian
: EXVL 3015/Erwin S Mamonto

uat

20-WD

21-WD
65
38

57
31
46
54
76
60

Total
Travel
time (s)
379
319
410
308
345
210
422
245
0
0

Tspot
(s)

Total
Cycle
Tdump
Time (s)
(s)

23

53

42

38

21

44

41

49

Total
Cycle
Time
(min)

857

14.28

936

15.60

724

jarak
(m)

Keterangan

x-LP-y; selatan barat LP EXVL 3006: Laadi Labani; antri


1746.3 1truk; 3deret ADT 19-15

1387 x-LP-y; antri 1truk; survey 34"; isi air 81"; 3deret ADT 161406.21 WD; simpang DT 27"
1387 x-LP-y; antri 1truk; perbaikan exca 684"; simpang DT 27";
12.07
1406.21 simpang ADT 10"; 2 deret ADT 19"

857

14.28

0.00

1387 x-LP-y; antri 1truk;


1406.21

E MINED

4
: Cerah
: Waste Dump Durian
: EXVL 3008

uat

20-WD
65
67
58
66
52
69
69
75
57
71

21-WD

Total
Travel
time (s)
337
310
335
335
336
311
341
353
323
331

Tspot
(s)

Total
Tdump Cycle
Time (s)
(s)

48

58

58

58

41

63

39

61

44

60

Total
Cycle
Time
(min)

891

14.85

951

15.85

975
900
884

jarak
(m)

Keterangan

1387 WD simpang 1 truk: 16";


1406.21
1387 loading sempit, undulasi, becek; pulang-jalan licin disiram

1406.21
1387 load prepare, simpang LV, dozing, ADT: 140"; fuel: 190"16.25
1406.21 231"-314"
1387 WD ADT salah jalur: 25"; ada grader di 0; ganti posisi:
15.00
1406.21 108"
14.73

1387 simpang 70"; komunikasi operator: 30"; penyiraman


1406.21

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

E MINED

uat

20-WD

21-WD
106
73
76
94
95
115
95
117
84
101
88
98

: Cerah
: Waste Dump Durian
:EXVL 3009/Junaedi Kauntu ; exvl 3015/Erwin S Mamonto
Total
Total
Total
jarak
Cycle
Travel
Keterangan
Tspot Tdump Cycle
(m)
Time
time (s)
Time (s)
(s)
(s)
(min)
antri 1adt dilp; load prepare 44s; komunikasi di wd
419
33
47
997
16.62 1746.3 42s,46s; waste
302
antri 2dt di lp; survey 444s; fuel 134s;115s;137s;216s;
330
42
56
917
15.28 1746.3 ada lv di lp 14s; subgrade
317
386
370
389
400
384
349
433
336

29

51

38

50

40

46

33

45

antri 1dt; operator pindah batu di jalan 124s; waste

969

16.15

1746.3

1009

16.82

1746.3

918

15.30

antri 2dt; dosing+loading prepare 75s; kencing 84s;


1746.3 nelfon di 17 200s

1022

17.03

antri 1dt; ambil konsum di lp 25s; komunikasi 37; antri di


1746.3 wd 1dt 50s

antri 4dt di lp; bersihkan kacamata di 19-20 48s

E MINED
: cerah, material keras, DP sempit
: waste dump durian 1
: EXVL 3015/

uat

20-WD

21-WD
93
194
87
166

Total
Travel
time (s)
515
502
482

Tspot
(s)

Total
Tdump Cycle
Time (s)
(s)

29

59

30

64

469
: Cerah
: Waste Dump Durian

Total
Cycle
Time
(min)

jarak
(m)

Keterangan

1300

ada dt di 19-20; dp sempit; dozing di wd 114; dt dumping


21.6667 1746.3 di wd 35; fuel 338; 643; 367

1238

antri 2dt; survey 35; load prepare 18; ada lv di lp 95;


20.6333 1746.3 komunikasi 18; deret adt lp-17; dt dumping di
wd+manuver 138; 17-18 nelfon

uat

: exvl 3015/Erwin S Mamonto

20-WD

21-WD
72
61
70
63
70
55
57
75
109
66
79
82
77
81
82
82
80
74
72
90
79
77
92
73
75
84
54
54

Total
Travel
time (s)
392
304
435
285
419
303
359
324
418
287
501
325
374
335
408
364
425
307
397
363
370
357
536
322
411
389
346
325

Tspot
(s)

Total
Cycle
Time
(min)

jarak
(m)

946

15.77

1746.3

943

15.72

1746.3

967

16.12

antri 1dt; isi air 159; 16-17+2adt sambil nelfon; nelfon di


1746.3 17 68; bantu dozer 97; kom 16

929

15.48

antri 1dt; salah dumping 40s; cek tire 21; kom 20; 0f0
1746.3 140, 257;191;

937

15.62

1746.3

1047

17.45

antri 2 dt; nelfon di lp 22; adt di 18-20; dt di lp 9; adt di


1746.3 20 42s

956

15.93

1746.3

1043

17.38

antri 3dt; main hp di lp 104; adt di 0 9s; adt di 0-17; isi air
1746.3 66s

988

16.47

1746.3

997

16.62

1746.3

1086

18.10

antri 3dt; load prepare 311; ganti exca 272, 11s; adt 19-0;
1746.3 exca dt di lp 54;

1107

18.45

1746.3

1010

16.83

1746.3

915

15.25

1746.3

Total
Cycle
Tdump
Time (s)
(s)

31

55

23

55

27

55

44

55

37

61

37

50

39

59

42

53

60

46

26

55

40

74

40

48

37

46

38

47

Keterangan
antri 4dt; kom 7,11; nelfon 13; dozing di lp 133, bab 432
16-17 adtkm; telfon 92

antri 4dt; kom 31

antri 2dt; dozing 70; kom 12; adt 15-17

antri 2dt; main hp 210s; 3 lv di 0 30s;


antri 2dt; main hp 17; dt 18-lp; becek

antri 1dt; 4 adt di 16-20; adt di 20 14s;


ambil snack 164; kom 19; adt 17-0
adt di lp 21

: Cerah
: Waste Dump Durian kanan
: exvl 3009/

uat

20-WD

21-WD

Total
Travel
time (s)

35
37
35
35
33
35
33
29
35
30
29
40
31
41

311
226
308
270
291
216
271
243
274
221
306
255
290
251

38

50

30

54

39

53

32

54

30

48

39

50

29

56

40

332

28

49
39
45
39
42

256
307
236
290
239

Tspot
(s)

Total
Tdump Cycle
Time (s)
(s)

46

33

53

33

55

Total
Cycle
Time
(min)

jarak
(m)

Keterangan
ganti posisi dumping 16s; papas dt adt di 0 7

773

12.88 1657.85

840

antri 1 dt, kom 27, papas adt di lp 6s; makan 9s; adt di
14.00 1657.85 20-18

728

12.13 1657.85

745

12.42 1657.85

729

12.15 1657.85

872

14.53 1657.85

753

12.55 1657.85

799

antri 2dt; load prepare 20; ada dt 18-wd; kom di wd 30;


13.32 1657.85 makan di wd 281s

774

antri 1dt; makan di lp 16, 162; papas adt di lp 10; load


12.90 1657.85 prepare 38; dozing di wd 18s

764

12.73 1657.85

antri 2dt; kencing 84; kom 6s; 0-f-0 240,420,240


antri 1dt

antri 2dt; kom 21; water truk di 17-16; atur radio 11s
antri 1dt; load prepare 94s

main hp 123s

selatan-wdr
8
30
antri di lp loading presurvey
fuel exca berpapasa persimpan antri di jal dozing/gra ambil air ambil snacambil nasi bak/b
280
97
465
14
17
124
53
159
164
45
287
320
151
125
113
438
228
28
56
82
45
128
245
73
436
363
165
433
660
183
145
722
815
246
455
335
213
461
204

165
22
32
40
120
108
44
75
18
311
272
94
20
38

444
35

18
9
42
9
30
11
54
14
21
7
6
10

27
19
16
20
70

48
35
138
95

23
114
133
70
18

66

25
9
281
16
162

84
432
84

komunikasi
30
42
46
37
7
11
16
20
31
22
12
19
27
6
21
11
30

149
234
134
242
118
174
161

main hp cek tire


antri di wd isi form p2h
200
21
50
13
92
68
104
210
17
123

25
40
16

lain lain
97 bantu dozer

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

1
2
3
4
5

Tque
(s)
62

Tspot (s)

30-Mar-16
RL-697 T (selatan)
ADTV 2013/ Abdul Haris Sabeha
Travel Time (s)
n
11

210

10
32

46

13

161

40

150

39

LP-0 LP-A

1
2
3

Tque
(s)

Tspot (s)

188

48

124

37

34

1
2
3
4
5

Tque
(s)

Tspot (s)

33

50

118

39

120

36

0u-1 1-2' 2'-3'

174

L
E
L

25
25
30

72
46
61

32
55
46

88

18

20

19

57

321

E
L

123

27

33

66

41

102

23

28

44

52

123
85
105
55

27
23
27
20

33
28
33
25

66
38
60
39

41
41
34
51

10

138

13

180

E
L
E
L
E

31-Mar-16
RL-730 AK (Barat)
ADTV 3009/Supardi Mamonto
Travel Time (s)
n

segmen jalan

Tload (s)

150

180

11

214

L
E
L
E
L
E

LP-0 LP-A
67
46

A-0
53
70

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

LP-1 0-0u
20
19
24

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

A-0

107
112
99

35

62

segmen jalan

Tload (s)

Tload (s)

10

140

125

61

11

197

10

177

LP-0 LP-A
L
E
L
E
L
E
L
E
L

53
52
57
53
61
51
64
50
64

A-0

LP-1 0-0u
18
21
44
36
48
10

0u-1 1-2' 2'-3'


21
53
40
18
56
40
55
39
55
39
53
40
45
40

11-Apr-16
Cover dump
ADTV 2014/
Travel Time (s)
segmen jalan
LP-1 0-0u 0u-1 1-2' 2'-3'

5
6
7
8

291

39

197

39

796

48

84

41

130

134

101

E
L
E
L
E
L
E

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

1
2
3
4
5
6
7
8

Tque
(s)
0
0
0
58
284
159
120
0

Tspot (s)

12-Apr-16
RL- (utara)
ADTV 2011/Stenly Tulenan
Travel Time (s)
segmen jalan
LP-0 LP-A A-0 LP-1 0-0u 0u-1 1-2' 2'-3'

Tload (s)

11

195

11

201

11

200

11

216

13

276

10

145

172

169

39
39
37
44
50
43
43
41

53
64
57
57
80
69
57

L
E
L
E
L
E
L
E
L
E
L
E
L
E
L
E

84
65
88
67
87
78
96
80
88
83
81
67
89
65
95
66

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

1
2
3
4
5
6

Tque
(s)

Tspot (s)

49

n
12

38

34

264

51

241

52

Tload (s)
220

12

212

12

224

10

176

10

183

14

323

LP-0 LP-A
L
E
L
E
L
E
L
E
L
E
L

118
125
160
152
87
77
115
100
134
92
137

29
28
30
23
52
41
30
42
30
41
33
32
33
43
26
28

64
39
69
40

41
49
52
41

18
20

40
41

2-May-16
RL- selatan
ADTV 2013/ I Made
Travel Time (s)
segmen jalan
A-0 LP-1 0-0u 0u-1 1-2' 2'-3'
22
20
24
53
24
20
25
27
25
21
27

25
18
22
30
22
21
22
23
24
18
23

54
75
36
65
45
76
25
76
40
92

61
57
61
58
54
50
43
50
56
50

6
9
10

280

38

51

176

11

162

31

E
L
E
L
E

84
150
135
130
157

Date
:
Loading Area
:
Alat Angkut/Opr. :
No.

1
2
3
4
5

Tque
(s)
121
439
130
129
0

Tspot (s)

Tload (s)

117

156

146

150

159

57
55
29
39
31

LP-0 LP-A
L
E
L
E
L
E
L
E
L
E

50
63
62
68
54
70
58
51
56
55

21

21

41

50

13-May-16
RL- utara
ADTV 2016/ Franky
Travel Time (s)
segmen jalan
A-0 LP-1 0-0u 0u-1 1-2' 2'-3'
53
49
59
39
66
33
83
37
64
37

50
37
52
43
55
45
68
48
40
45

DUMP TRUCK: WASTE MINED

eha
(s)

Kondisi

cerah

Tujuan
Alat Muat

:
:

waste mined/CD

an
3'-CD 1_2 2_3 3_4

4_CD

27
24
43
35

Total
Travel
Time (s)
283
281
303

53

EXVL 3006/ Laadi Labani

Tspot (s)

Tdump (s)

17

30

15

30

19

27

25

25

16

20

290

41

331

46

295

52
60
51
55

342
275
310
245

Total Cycle
Time (s)

Total Cycle
Time (min)

856

14.27

844

14.07

1039

17.32

845

14.08

810

13.50

DUMP TRUCK: WASTE MINED


Kondisi
Tujuan
Alat Muat

to
(s)

an
3'-CD 1_2 2_3 3_4
27
31
46
46
30
56

4_CD

Me
waste mine
EXVL 300

:
:
:
Total
Travel
Time (s)
279
282
184
176
171
151

Tspot (s)

Tdump (s)

23

33

21

29

22

32

Total Cycle
Time (s)

Total Cycle
Time (min)

815

13.583333

627

10.45

624

10.4

DUMP TRUCK: WASTE MINED


Kondisi

(s)
an
3'-CD 1_2 2_3 3_4

LP tidak rata;
CD wa
EXVL 3008/Fe

:
:

Tujuan
Alat Muat

4_CD

Total
Travel
Time (s)

77
62
58
64
66
70
65
61
78

130
114
115
117
127
121
129
111
142

Tspot (s)

Tdump (s)

28

34

30

34

27

47

48

43

32

33

Total Cycle
Time (s)

Total Cycle
Time (min)

479

7.9833333

471

7.85

422

7.0333333

564

9.4

549

9.15

73
75
84
56
64
71
65

126
139
141
113
144
140
122

Kondisi

3'-CD 1_2 2_3 3_4

4_CD

65
47
65
70

Total
Travel
Time (s)

Kondisi

3'-CD 1_2 2_3 3_4


21
159
121
198
130
107
218
154
141
151

40

4_CD
268
104

33

40

34

8.7

519

8.65

478

7.9666667

LP tidak rata;
CD wa
EXVL 3008/Fekie Fendi Rem
Tspot (s)

Tdump (s)

25

34

39

32

40

32

40

33

51

34

50

32

40

30

35

33

Total Cycle
Time (s)

Total Cycle
Time (min)

804

13.4

856

14.266667

567

9.45

581

9.6833333

653

10.883333

483

8.05

515

8.5833333

825

13.75

LP tidak rata;
CD wa
exvl 3015/Er

:
:

Tujuan
Alat Muat

(s)
an

47

522

283
228
304
241
139
119
126
122
118
124
114
99
122
108
292
255

113
100

33

9.15

:
:

Tujuan
Alat Muat

(s)
an

40

549

:
Total
Travel
Time (s)
494
382
497
453
454
347
395
436
463
368
480

Tspot (s)

Tdump (s)

33

28

68

31

116

28

107

29

47

27

21

27

Total Cycle
Time (s)

Total Cycle
Time (min)

1206

20.1

1299

21.65

1203

20.05

1194

19.9

1140

19

1232

20.533333

126

343
150
135
130
157
Kondisi

3'-CD 1_2 2_3 3_4


124
128
44
50
33
63
52
64
95
64

4_CD

47

33

111

20.533333

597

9.95

624

10.4

cerah
wd 2
exvl 3015/Er

:
:

Tujuan
Alat Muat

(s)
an

38

1232

:
Total
Travel
Time (s)
277
277
217
200
208
211
261
200
255
201

Tspot (s)

Tdump (s)

27

32

55

32

56

36

34

34

31

31

Total Cycle
Time (s)

Total Cycle
Time (min)

787

13.116667

715

11.916667

686

11.433333

718

11.966667

708

11.8

1 utara-cd
3
30

target
no.
Keterangan

jarak (m)

910.757 waste mined; pp jalur baru Prepare EXVL: 36; antri 1truk
910.757 LP; Misskom: 237s
910.757 waste mined; pe-baru pu-biasa; Prepare EXVL: 36; antri
1truk LP; Misskom: 237s; antri 1truk LP
1081.453
910.757 waste mined; pp jalur baru; material keras
910.757
910.757 Waste Mined; Beda LP: EXVL 3015-Fadli Mokaagow; antri
910.757 1truk
910.757 waste mined; antri 1truk
910.757

2
Mendung
waste mined/Cover Dump
EXVL 3008/Robbyanto
Keterangan

jarak (m)

1181.612 antri 1 truk 188s


1181.612
antri 1 truk; Pindah LP timur RL 672 D EXVL Dedy Rusdin
material keras

3
LP tidak rata; blasting material
CD waste mined
EXVL 3008/Fekie Fendi Rembet
jarak (m)

266.608

Keterangan
0-CD undulasi, becek, swing 45

266.608

0-CD undulasi, becek, swing 45; kencing 119; cd-1 adt


lewat

266.608

antri 1 truk; 0-CD undulasi, becek, swing 90; load prepare


60,

266.608
266.608

antri 1truk; 0-CD undulasi, becek, swing 60; keras


antri 2truk; 0-CD undulasi, becek, swing 60; load prepare
69

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

266.608

antri 2truk; 0-CD undulasi, becek, swing 60; load prepare


69

266.608

antri 1truk0-CD undulasi, becek, swing 60; load prepare


36;

266.608
266.608

antri 1truk+exca stb; 0-CD undulasi, becek, swing 60


antri 1truk; 0-CD undulasi, becek, swing 60

LP tidak rata; blasting material


CD waste mined
L 3008/Fekie Fendi Rembet; exvl 3015/Robby Maniung
jarak (m)

Keterangan

752.107 swing 60; gangguan layar 17; 2-1 lv+roller 12'; dumping
752.107 bawah
752.107 swing 60; dumping atas; LP ada lv 9; 2-1 ada lv 12;
752.107
266.608 swing 60; hujan; komunikasi 91
266.608
266.608 antri 1truk; load prepare 27, hujan
266.608
266.608 antri 1truk; hujan, swing 90; 1-fuel 133 fuel 292 fuel-1
266.608 198; exvl 3015
266.608 antri 1truk; load prepare 25; hujan; exvl 3015
266.608
266.608 antri 1 truk, swing 90; exvl 3015
266.608
752.107 swing 90; exca BD 175, load prepare 66
752.107

LP tidak rata; blasting material


CD waste mined
exvl 3015/Erwin S Mamonto
jarak (m)

Keterangan

1081.453 load prepare 33 s


910.757
910.757 papas adt di cd 10s; papas adt di 0 9s; grading 65; deret
910.757 1-3; load prepare 28; kom 18s
910.757 papas adt di cd 55
910.757
910.757 antri dumping di cd 135, fuel; load prepare 131; antri
910.757 1adt; ambilct 85; kom 9
910.757 antri 1adt; load prepare 24; kom 17
910.757
910.757 antri 1adt; load prepare 20,58,42; kencing di cd 77; antri
di cd 153; papas di cd 27

antri 1adt; load prepare 20,58,42; kencing di cd 77; antri


910.757 di cd 153; papas di cd 27
266.608 load prepare 106; survey 41; mine service
266.608
266.608 fthn: 329; kom 12; mine service
266.608

cerah undulasi
wd 2/waste
exvl 3015/Erwin S Mamonto
jarak (m)

Keterangan

752.107 antri 1adt; load prepare 158; papas adt di 1 21


752.107
752.107 antri 3adt; papas di 3 22; test rem 28; papas di 1 8; papas
752.107 di lp 9
752.107 antri 1adt; papas di cd 22; papas di cd 49; ambil konsum
752.107 di 1 78
752.107 antri 1adt; load prepare 20
752.107
752.107 antri 1adt; load prepare 123; papas lp 22
752.107

selatan-cd

barat-cd
5
30

antri di lp
62
62
161
150
188
124
118
120
291
197
796
84
58
284
159
120
264
241
280
121
439
130
129

1
30
loading prepare

survey
60
36
27
25
66
175
33
28
131
24
20
58
42
106
158
20
123

fuel exca berpapasan


41

12
9
12
10
9
55
27
329
21
22
8
9
22
49
22

persimpangan

antri di jalan

dozing/grading
17

ambil air
36
65

ambil snack
85

ambil nasi

bak/b
78

komunikasi
main hp
119
237
77
91
18
9
17
12

cek tire

antri di cd
isi form p2h
28
135
153

si form p2h

ADT
no.

antri di lp

94.00 data
loading prepare

survey

fuel exca

berpapasan

161

1
2

181

181

206

123

100

41

75

845

110

56

38

21

58

33

83

13

109

19

44

54

35

129

45

45

88

25

313

4
265

5
550

81

7
383

8
108

9
221

10
11

290

211

12

106

20

25

10

60

36

13

27

13

25
66
175
33
28
131
24
20
58
42
106
123
158
20
123

11
18
13
17
17
18
12
9
12
10
9
55
27
329
22
12
21
22
8
9
22
49
22

214

13
14

151

254

15
120

16

296

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

289
190
449
861
961
1019
166

196
163
45
250
114
277
522
404
314
241
737
226
180
76
387
62
62
161
150
188

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

count
total
persen

124
118
120
291
197
796
84
58
284
159
120
264
241
280
163
120
131

This chart isn't available in your version

121
439
130
129

Editing this shape or saving this workboo

65

31

39

32%

15%

1%

0%

19%

akumulasi
rata" waktu

no.

32%
272.35

47%
73.45

48%
123.50

48%
#DIV/0!

67%
35.95

dt
108.00 data
antri di lp loading prepare
survey
fuel exca berpapasan
315
1
97
174
417
25
30
2
60
160
373
26
840
3
20
24
24
55
4
90
465
32
401
5
41
444
11
729
6
409
35
15
348
7
300
20
217
8
67
9
230
9
118
8
52
10
30
11
731
11
53
7
63
12
59
13
204
13
97
4
331
14
165
4
90
15
22
13
195
16
32
17
114
17
40
16
193
18
120
45
94
19
108
33
47
20
44
37
103
21
75
24
275
22
18
8
631
23
311
17
244
24
272
23
292
25
94
27
388
26
20
18
67
27
38
23
553
28
8
237
29
23
389
30
120
232
31
225
132
32
46
33
33
62
70
34
25
120
35
9
245
36
14
208
37
18
411
38
9
413
39
42
215
40
9
75
41
30
165
42
11
40
43
54

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
count
total
persen

14
21
7
6
10
30

151
222
235
155
226
48
117
129
280
287
320
151
125
113
438
228
28
56
82
45
128
245
73
436
363
165
433
660
183
145
722
815
246
455
335
213
461
204
149
234
134
242
118
174
161

This chart isn't available in

Editing this shape or saving

88

27

49

28%

9%

2%

1%

16%

akumulasi
average

28%
247.125

delay hauler
no.

39%
217

40%
55%
395 26.5918367347

202.00
antri di lp

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

37%
103.7037037037

161
181
845
313
265
550
81
383
108
221
290
211
214
151
254
120
296
289
190
449
861
961
1019
166

196
163
45
250
114
277
522
404
314
241
737
226
180
76
387
62
62
161

loading prepare
181
100
110
38
58
83
109
44
35
45
88
106
25
60
36
27
25
66
175
33
28
131
24
20
58
42
106
97
60
20
90
41
409
300
67
118
30
53
59
97
165
22

survey
206
41
174
160
24
465
444
35

fuel exca
417
373

berpapasan
123
75
56
21
33
13
19
54
129
45
25
20
10
9
13
13
11
18
13
17
17
18
12
9
12
10
9
55
27
329
25
26
24
32
11
15
20
9
8
11
7
13

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

150
188
124
118
120
291
197
796
84
58
284
159
120
264
241
280
315
30
840
55
401
729
348
217
230
52
731
63
204
331
90
195
114
193
94
47
103
275
631
244
292
388
67
553
237
389
232
132

32
40
120
108
44
75
18
311
272
94
20
38
123
158
20
123

4
4
13
17
16
45
33
37
24
8
17
23
27
18
23
8
23
120
225
46
62
25
9
14
18
9
42
9
30
11
54
14
21
7
6
10
30
22
12
21
22
8
9
22
49
22

91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138

33
70
120
245
208
411
413
215
75
165
40
151
222
235
155
226
48
117
129
280
287
320
151
125
113
438
228
28
56
82
45
128
245
73
436
363
165
433
660
183
145
722
815
246
455
335
213
461

139
140
141
142
143
144
145
146
147
148
149
150
151
152
153

count
total
persen
akumulasi
rata" waktu

204
149
234
134
242
118
174
161
163
120
131
121
439
130
129

153

58

88

30%
30%
257.84

11%
41%
87.53

2%
43%
193.63

0%
43%
395.00

17%
60%
30.74

antri di
jalan

persimpangan

45

ambil
snack

ambil nasi

bak/b

24

210

40

44

96

13

129

180

120

25

87

28

57

240

27

67

85

60

29

10

119

19

97

77

30

36

53

27

65

51

14
57

17

dozing/gr
ambil air
ading

22

13
23

12

sn't available in your version of Excel.


shape or saving this workbook into a different file format will permanently break the chart.

15

1%

2%

1%

3%

203
7%

0%

4%

75%
26.13

persimpangan

75%
17.00

79%
53.38

81%
210.00

83%
68.00

84%
34.50

87%
79.86

antri di jal dozing/graambil air ambil snacambil nasi bak/b


9
162
45
245
45
51
50
18
12
33
159
52
10
58
12
45
22
66
83
45
45
38
419
18
30
25
65
6
124
53
20
9
84
11
48
23
164
281
432
12
35
114
16
84
7
138
133
162
10
95
70
17
18
27
19
16
20
70

This chart isn't available in your version of Excel.


Editing this shape or saving this workbook into a different file format will permanently break the chart.

15

10

1%

2%

3%

2%

311
5%

3%

3%

60%
63%
19.4666666667 119.7778

persimpangan
45
13
28
9
29
19
30
27
51
14
57
22
13
23
12
9
18
12
38
6
11
12
7
10
17
27
19
16
20
70

66%
67%
69%
52.9 156.6667 65.66667

antri di dozing/gr
ambil air
jalan
ading
17
24
210
162
129
180
12
57
240
45
9
245
419
10
159
124
97
66
48
36
35
65
138
45
95
33
22
18
53
23
114
133
70
18

72%
74%
74.875 116.8571

ambil
ambil nasi
snack
40
44
120
25
27
51
85
10
45
45
52
25
83
9
30
281
20
16
164
162

bak/b
96
87
67
60
119
77
50
58
45
65
84
432
84

30

10

18

6
512
6%
2%
4%
1%
66%
68%
72%
73%
22.80
53.11
183.33
This
chart isn't109.50
available in your
version of
Excel.

10

10

13

2%
75%
66.60

2%
77%
66.80

3%
79%
101.85

Editing this shape or saving this workbook into a different file format will permanently break the chart.

komunikasi

main hp

cek tire

antri di sp

22

20

70

19

28

23

27

45

135

18

153

120

38

234

47

14

31
237

isi form
p2h

ganti
operator

897

91

18
9

17

12

17

8%

0%

1%

3%

0%

0%

96%
54.47

96%
#DIV/0!

komunikasi main
12
25
20
10
78
24
22
13
20
15
13
30
42
46
37
7
11
16
20
31
22
12
19
27
6
21
11
30

97%
24.00

100%
77.33

100%

100%
897.00

hp cek tire
antri di sp isi form p2 bantu dozer
30
21
935
34
97
30
54
933
27
8
49
15
90
10
45
77
46
200
72
13
301
92
91
68
95
104
30
210
33
17
107
123
145
34
287
21
58
56
56
93
37
27
44
46
392
156
179
46
52
50
25
40
16

28

14

34

9%

5%

1%

11%

0%

0%

83%
87%
88%
99%
22.85714286 72.57143 27.66667 137.8529

komunikasi
22
19
27
4
18
120
234
47
14
31
237
91
18
9
17
12
12
25
20
10
78
24
22
13
20
15
13
30
42
46
37
7
11
16
20
31
22
12
19
27
6
21

main hp
30
30
27
15
10
77
200
13
92
68
104
210
17
123

100%
34

cek
isi form
antri di dp
tire/alat
p2h
21
70
34
54
23
8
45
28
135
153
38
935
933
49
90
45
46
72
301
91
95
30
33
107
145
34
287
21
58
56
56
93
37
27
44
46
392
156
179
46
52
50
25
40
16

100%
97

ganti
operator bantu dozer
897
97

11
30
6

45

14

40

9%
88%
34.80

3%
91%
72.57

1%
92%
27.75

8%
99%
128.78

0%
100%
34.00

0%
100%
897.00

0%
100%
97.00

manently break the chart.

antri
di lp

loadi
ng
prep
are
0
surv
ey

fuel
exca
0
berp
apas
an
persi
mpa
ngan
antri
di
jalan
dozi
ng/g
radin
g
ambi
l air
ambi
l
snac
k
ambi
l
nasi
bak/
b

0
0

kom
unik
asi
main
hp
cek
tire
antri
di sp
isi
form
p2h

0
0

ganti
oper
ator
0

No.

jenis hambatan

1 antri di lp
2 berpapasan
3 loading prepare
4 komunikasi
5 antri di dp
6 persimpangan
7 dozing/grading
8 main hp
9 bak/b
10 antri di jalan
11 ambil snack
12 ambil nasi
13 survey
14 ambil air
15 cek tire/alat
16 fuel exca
17 isi form p2h
18 ganti operator
19 bantu dozer

waktu rata-rata
per kejadian
(min)
4.30
0.51
1.46
0.58
2.15
0.38
0.89
1.21
1.70
1.83
1.11
1.11
3.23
3.06
0.46
6.58
0.57
14.95
1.62

persentase
kontribusi (%)
29.88%
17.19%
11.33%
8.79%
7.81%
5.86%
3.52%
2.73%
2.54%
1.95%
1.95%
1.95%
1.56%
1.17%
0.78%
0.39%
0.20%
0.20%
0.20%

waktu rata-rata
per kejadian (s)
257.84
30.74
87.53
34.80
128.78
22.80
53.11
72.57
101.85
109.50
66.60
66.80
193.63
183.33
27.75
395.00
34.00
897.00
97.00

LP
loading prepare
dozing/grading
survey
fuel exca

time

frek
1.46
0.89
3.23
6.58

TRAVEL
berpapasan
58
18 komunikasi
8 persimpangan
2 main hp
antri di jalan
ambil nasi
ambil air
cek tire/alat
isi form p2h
ganti operator
bantu dozer
bak/b
ambil snack

N DATA

202.00

JUMLAH

ANTRIAN
153
88
58
45
40
30
18
14
13
10
10
10
8
6
4
2
1
1
1

3.25

LP
0.69

TRAVEL
0.99

DP
0.43

512
time

DP

frek
0.51
0.58
0.38
1.21
1.83
1.11
3.06
0.46
0.57
14.95
1.62
1.70
1.11

88
45
30
14
10
10
6
4
1
1
1
13
10

antri di dp

time

frek
2.15

40

per shift per seri alat adt per unit


waktu

alat/operator

Working

Delay
8.77

0.57

7.82

0.25

2009/Supardi Mamonto
2011/Erten
2011/Stenly Tulenan
2008/Toto

10.23

0.53

9.93

0.73

8.65

0.97

10.58

0.17

ADTV 2014/Putra
12-Apr-16 ADTV 2011/Stenly Tulenan
2-May-16 ADT 2013/Imade
5-May-16 ADTV 2016/Adrian
ADTV 2014/Putra S mamonto
6-May-16 ADT 2014/Putra
7-May 2014/Putra S mamonto

3.45

10.4

0.15

10.22

0.42

9.48

0.28

9.35

1.17

7.23

2.02

9.47

0.8

7.67

0.62

0.6

8.89076923

0.62

30-Mar-16 ADTV 2013/Abdul Haris Sabeha


ADTV 2016/Franky
31-Mar-16 ADTK 2020/Setiawan Mokaagow
ADTV
4-Apr-16 ADTV
9-Apr-16 ADTV
11-Apr-16 ADTV

11-May-16 2014/Toto
13-May-16 2012/Sutardi Moko
2016/Franky
average

per hari per seri alat adt


waktu

alat/operator

Working
19.2

0.82

14.9

0.13

19.33

1.41

15.6

2.97

12.16

0.42

3.45

19.98

1.32

14.9457143

1.01

30-Mar-16 ADTV 2013/Abdul Haris Sabeha


ADTV 2016/Franky
31-Mar-16 ADTK 2020/Setiawan Mokaagow
ADTV
4-Apr-16 ADTV
9-Apr-16 ADTV
11-Apr-16 ADTV

2009/Supardi Mamonto
2011/Erten
2011/Stenly Tulenan
2008/Toto

ADTV 2014/Putra
12-Apr-16 ADTV 2011/Stenly Tulenan
2-May-16 ADT 2013/Imade
5-May-16 ADTV 2016/Adrian
ADTV 2014/Putra S mamonto
6-May-16 ADT 2014/Putra
7-May 2014/Putra S mamonto

Delay

11-May-16 2014/Toto
13-May-16 2012/Sutardi Moko
2016/Franky
average

per bulan per seri alat adt


maret
ADTV 2009/Supardi Mamonto

Working
431.03

Delay
41.67

April

Mei

ADTV 2013/Abdul Haris Sabeha


ADTV 2016/Franky
ADTK 2020/Setiawan Mokaagow
ADTV 2008/Toto
ADTV 2011/Erten
ADT 2013/Imade

483.09

49.01

501.25

35.8

498.91

53.14

539.04

29.77

457.51

37.38

467.09

40.01

ADTV
ADTV
ADTV
ADTV

460.17

39.92

571.02

46.93

2014/Putra
2016/Adrian
2012/Sutardi Moko
2013/Made

ADTV 2014/Toto
ADTV 2016/Franky

per bulan adt


maret
April
Mei

Working

ADT
ADT
ADT

per bulan semua adt


Total Fleet : JRBM ADT 40 T
maret
Total Fleet : JRBM ADT 40 T
April
mei

478.57
498.96

Working

Delay

44.91
41.19

Delay

8008.49

639.63

7438.00

591.24

Idle

Unsched Maint Sched Maint

Out Of Plan

Total Hours

PA%

Usage%

UA%

2.25

0.42

12

96.50

75.67

80.59

3.93

12

100.00

65.17

67.25

1.23

12

100.00

85.32

89.74

1.33

12

100.00

82.82

88.91

1.57

0.82

12

93.17

77.30

85.97

1.25

12

100.00

88.17

89.58

8.55

12

28.75

100.00

100.00

1.45

12

100.00

86.67

87.92

1.37

12

100.00

85.10

88.59

2.23

12

100.00

79.07

81.40

1.48

12

100.00

77.92

87.67

2.75

12

100.00

60.25

77.08

1.25

0.48

12

96.00

82.20

89.15

1.9

1.82

12

84.85

75.27

81.35

2.4

12

100.00

75.00

80.00

1.6992308

0.79

Idle

Unsched Maint Sched Maint

Out Of Plan

12 93.417329 80.434087 85.680655

Total Hours

PA%

Usage%

UA%

3.57

0.42

24

98.25

81.39

84.87

7.55

1.42

24

94.08

65.99

66.56

2.58

0.67

24

97.21

82.89

88.94

3.07

0.82

1.55

24

90.13

72.09

85.81

1.25

10.17

24

57.63

87.92

90.96

20.55

24

14.38

100.00

100.00

2.7

24

100.00

83.25

88.75

2.96 4.8642857 0.2214286

Idle
117.08

Unsched Maint Sched Maint


91.77

62.47

Out Of Plan

24 78.810049
Total Hours

744

PA%
79.27

81.93311 86.555903
Usage%
73.08

UA%
80.15

140.98

64.32

6.59

744

90.47

71.77

79.05

160.54

33.38

13.02

744

93.76

71.85

76.99

166.55

18.67

6.8

744

96.58

69.43

76.82

89.63

45.14

16.38

720

91.46

81.87

86.39

103.49

91.85

29.8

720

83.10

76.46

82.70

130.86

78.19

3.85

720

88.61

73.22

79.49

118.93

86.38

14.57

720

85.98

74.34

80.79

103.87

14.94

7.22

744

97.02

79.11

85.61

Idle

146.29
118.89

Idle

Unsched Maint Sched Maint

52.04
55.86

22.22
13.10

Unsched Maint Sched Maint

Out Of Plan

Total Hours

0.00
0.00

Out Of Plan

744.00
728.00

Total Hours

PA%

90.02
90.46

PA%

Usage%

71.53
75.74

Usage%

UA%

78.25
81.97

UA%

2040.64

997.69

241.72

11928

89.61

74.92

80.91

1654.56

1689.7

170.52

11544

83.89

76.81

82.91

Use%

UT%

93.90

73.02

96.90

65.17

95.07

85.32

93.15

82.82

89.92

72.02

98.42

88.17

100.00

28.75

98.58

86.67

96.05

85.10

97.13

79.07

88.88

77.92

78.16

60.25

92.21

78.92

92.52

63.86

93.75

75.00

93.721067 74.090837

Use%

UT%

95.90

79.97

99.14

62.08

93.20

80.58

84.01

64.97

96.66

50.67

100.00

14.38

93.80

83.25

94.67305 62.269978
Use%
91.18

UT%
57.93

90.79

64.93

93.33

67.37

90.37

67.05

94.77

74.87

92.45

63.54

92.11

64.87

92.02

63.92

92.41

76.75

Use%

91.42
92.35

Use%

UT%

64.32
68.50

UT%

92.60

67.14

92.64

64.43

per hari per seri alat dt


waktu

alat/operator

28-Mar-16 DTMR 36/Keny ;


DTMR 38/Riswandi
29-Mar-16 DTMR 38/Setiawan
19-Apr-16 DTMR 2032/Saiful Bahri
20-Apr-16 DTMR 2034/vian
21-Apr-16 DTMR 2037/Bastian
27-Apr-16 dtmr 37/bastian;
dtmr 35/sony;
dtmr 40/risky
29-Apr-16 DTMR 2031/Daldiono ;
DTMR 2038/setiawan
DTMR 2037/Sony;
2-May-16 DTMR 2037/Bastian
average

Working

Delay

8.85

1.17

8.28

1.77

8.68

1.33

5.1

0.18

9.4

1.35

9.95

0.17

7.9

0.62

3.82

0.4

5.25

8.33

0.33

7.3

0.43

3.58

0.65

8.22

0.65

7.28

0.70

per hari per seri alat dt


waktu

alat/operator

28-Mar-16 DTMR 36/Keny ;


DTMR 38/Riswandi
29-Mar-16 DTMR 38/Setiawan
19-Apr-16 DTMR 2032/Saiful Bahri
20-Apr-16 DTMR 2034/vian
21-Apr-16 DTMR 2037/Bastian
27-Apr-16 dtmr 37/bastian;
dtmr 35/sony;
dtmr 40/risky
29-Apr-16 DTMR 2031/Daldiono ;
DTMR 2038/setiawan
DTMR 2037/Sony;
2-May-16 DTMR 2037/Bastian
average

per bulan per seri alat dt


DTMR 36/Keny ;
maret
april

mei

DTMR 38/Riswandi
DTMR 2031/Daldiono ;
DTMR 2032/Saiful Bahri
DTMR 2034/vian
dtmr 35/sony;
DTMR 2037/Bastian
DTMR 2038/setiawan
dtmr 40/risky

Working

Delay

16.88

2.94

18.41

2.37

18.23

2.21

9.05

2.1

17.56

1.22

19.7

0.55

9.97

0.8

11.72

1.63

5.25

17.86

0.81

16.67

0.96

10.25

1.9

14.30

1.46

Working

Delay

363.14

39.19

487.07

55.46

331.34

30.7

430.1

70.39

425.5

40.41

406.93

40.77

421.35

45.98

463.94

40.97

197.89

22.74

per bulan
maret
April
Mei

dt
DT
DT
DT

per bulan semua adt


Total Fleet : JRBM DT 30 T
maret
Total Fleet : JRBM DT 30 T
April
mei

Working

425.11
382.44

Working

Delay

47.33
41.71

Delay

5468.13

588.97

6044.9

689.83

Idle

Unsched Maint Sched Maint

Out Of Plan

Total Hours

PA%

Usage%

UA%

1.3

0.68

12

94.33

78.18

88.52

1.95

12

100.00

69.00

83.75

1.98

12

100.00

72.39

83.49

6.72

12

100.00

42.50

44.00

1.25

12

100.00

78.33

89.58

1.88

12

100.00

82.92

84.33

3.48

12

100.00

65.83

71.00

3.9

3.88

12

67.67

47.04

51.97

6.75

12

100.00

43.75

43.75

3.33

12

100.00

69.47

72.23

4.27

12

100.00

60.83

64.42

1.08

2.25

4.43

12

44.29

67.42

79.66

1.48

1.65

12

86.25

79.42

85.70

3.03

0.65

0.34

0.00

12.00

91.73

65.93

72.49

Idle

Unsched Maint Sched Maint

Out Of Plan

Total Hours

PA%

Usage%

UA%

2.6

1.58

24

93.42

75.29

88.40

3.22

24

100.00

76.71

86.58

3.55

24

100.00

75.99

85.20

7.85

24

67.29

56.04

69.04

5.22

24

100.00

73.17

78.25

3.75

24

100.00

82.08

84.38

13.23

24

100.00

41.54

44.88

6.77

3.88

24

83.83

58.25

66.35

18.75

24

100.00

21.88

21.88

5.31

24

100.00

74.48

77.86

6.37

24

100.00

69.46

73.46

3.16

2.25

6.43

24

63.82

66.95

79.36

6.41

1.30

0.54

0.00

24.00

92.36

64.32

71.30

Idle

Unsched Maint Sched Maint

Out Of Plan

Total Hours

PA%

Usage%

UA%

238.55

40.52

9.97

52.65

744

92.70

56.66

62.78

165.79

29.04

6.67

744

95.20

68.76

76.59

182.48

54.96

12

108.5

720

89.05

60.85

66.49

206.58

12.97

720

98.20

60.83

70.78

196.68

49.84

7.6

720

92.02

64.22

70.32

187.25

67.68

17.4

720

88.18

64.09

70.51

189.74

17.62

9.31

36

720

96.06

64.13

71.12

178.94

47.47

12.67

744

91.92

67.84

73.83

292.22

169.44

37.77

720

71.22

38.59

43.02

Idle

202.17
204.84

Idle

Unsched Maint Sched Maint

34.78
60.00

8.32
13.82

Unsched Maint Sched Maint

Out Of Plan

26.33
20.64

Out Of Plan

Total Hours

744.00
723.43

Total Hours

PA%

93.95
89.52

PA%

Usage%

62.71
60.08

Usage%

UA%

69.69
66.58

UA%

2965.43

897.51

172.32

2172

12264

89.40

60.61

67.13

2763.46

839.11

77.95

2232.85

12648

91.20

63.64

70.91

Use%

UT%

88.32

73.75

82.39

69.00

86.71

72.39

96.59

42.50

87.44

78.33

98.32

82.92

92.72

65.83

90.52

31.83

100.00

43.75

96.19

69.47

94.44

60.83

84.63

29.86

92.67

68.50

91.61

60.69

Use%

UT%

85.17

70.33

88.59

76.71

89.19

75.99

81.17

37.71

93.50

73.17

97.28

82.08

92.57

41.54

87.79

48.83

100.00

21.88

95.66

74.48

94.55

69.46

84.36

42.73

90.82

59.58

Use%

UT%

90.26

52.52

89.78

65.46

91.52

54.19

85.94

59.73

91.33

59.09

90.89

56.52

90.16

61.60

91.89

62.36

89.69

27.48

Use%

90.02
90.20

Use%

UT%

58.99
54.42

UT%

90.28

54.18

89.76

58.04

CODE
010
013
014
015
016
017
019
020
021
025
026
027
033
035
036
037
041

STATUS
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY
DELAY

REASON
REFUELING
WAIT FOR FUEL
LUBRICATION
OPERATOR CHANGE
ENGINEERING DELAY
TYRE CHECK
WASTE DUMP PREPARATION
TOILET
WAIT GRADE CONTROL
WAIT EXCAVATOR
WAIT TRUCK
WAIT ON OTHER EQUIPMENT
WAIT LOCATION
PRESTART CHECK UNIT
DUSTY
WASHING EQUIPMENT
COFFEE TIME

segmen

grade
12
23
34
45
56

jarak
1%
2%
3%
4%
5%

waktu
12.00
15.00
12.00
18.00
21.00
78.00

kec
3.00
5.00
6.00
11.00
18.00
43.00

bobot
average

efh

kec

4.00
14.4
3.00
10.8
2.00
7.2
1.64 5.890909
1.17
4.2
2.36
8.50
1.8139535 6.530233
1.8139535 6.530233

1.14
1.02
1.69
1.35

Chart Title
2.50
2.00
1.50
1.00
0.50
0.00

segmen grade
lp1_0
lp2_0
0_1
0_0u
lpu_0u
0u_1
1_2
2_3
3_4
3_CD2
4_5
4-SB
SB-5
5_6
6_7
7_8
7_14
6_8
8_9
9_SP ox
6_14
14_10
10_SP ox
10_SP tr
6-b
b'-6
14_d
d_14
14_lp
lp_0
1_x
x_y
y_cd
3_cd
15-16
16-17
17-18
18-19
19-20
20-wd
20-wdr
wdr-20
spox_14
lpb-0
lpu-15
utara-tr
utara-ox

jarak
2.91
4.52
-7.14
8.68
4.99
-3.89
-10.25
0.08
-3.50
2.32

4.69
0.12
7.80
-3.13
5.33
-1.29
1.77
-2.75
4.16
10.69
7.81
-6.88
9.33
-17.23
5.95
-7.30
-9.96
11.01
-10.71
-10.29
6.70
8.33
7.70
4.69
8.26
6.87
5.20
-1.64
1.51
-19.75
-12.25

178.85
119.48
246.40
142.06
162.26
104.35
159.46
215.70
163.32
277.04
236.47

217.24
71.73
141.41
395.42
214.08
294.32
73.62
468.35
168.35
103.71
77.69
371.80
268.72
67.62
151.97
172.08
325.87
210.63
134.21
140.66
281.03
108.62
160.02
260.95
308.71
212.46
516.69
157.38
176.60
76.93
449.71
304.32
1973.20
1840.81

3
5
-7
9
5
-4
-10
0
-3
2

5
0
8
-3
5
-1
2
-3
4
11
8
-7
9
-17
6
-7
-10
11
-11
-10
7
8
8
5
8
7
5
-2
2

-36.729

304.316

447.49
1077.46
806.41

ox-utara
barat-tr
selatan-tr
selatan2-tr
selatan-wd
selatan2-wd
barat-wd
utara-wd
selatan-wdr
wdr-selatan
selatan cd bawah
selatan cd
cd selatan
utara cd
lpu-1
barat-cd
selatan -ox
ox selatan
barat wdr
wdr-barat
barat-ox
ox-barat

1804.08
2402.70
2131.85
2072.47
1746.30
1686.93
2017.16
1871.77
1386.99
1406.21
1081.45
910.76
1081.45
752.11
266.61
1181.61
1999.46
1962.73
1657.85
1677.07
2270.32
2233.59

-36.729

utara-wdr
wdr-utara

1512.45
1531.68

19.222

19.222

segment grade (%)


lps-0
2.91
lpb-0
-12.25
lpu-0u
8.68
0-0u
-7.14
0u-1
4.99
1_2
-3.89
1_2'
11.01
2_3
-10.25
2'-3'
-10.71
3_4
0.08
3'-WD2
6.70
4_5
2.32
5_6
4.69
6_7
0.12
7_8
7.80
8_9
-1.29
9-spox
1.77
7_14
-3.13
14_10
4.16
10-sptr
7.81
0-16
8.33
16-17
7.70
17-18
4.69
18-19
8.26
19-20
6.87
20-WDr
-1.64
20-WD1
5.20

distance (m)
haul road condisition
178.85 undulasi, bottle neck
449.71 undulasi, bottle neck
162.26 undulasi, bottle neck
142.06 cukup baik, cukup lebar
104.35 cukup baik, lebar
159.46 baik, lebar
210.63 sedikit undulasi, lebar
215.70 sedikit undulasi, cukup lebar
134.21 sedikit undulasi, cukup lebar
163.32 cukup baik, bottle neck
281.03 undulasi, bottle neck
236.47 baik, lebar
217.24 baik, lebar
71.73 baik, lebar
141.41 sedikit undulasi, sempit
294.32 cukup baik, sempit
73.62 undulasi sempit
395.42 baik, lebar
168.35 cukup baik, lebar
77.69 undulasi, bottle neck
108.62 baik, lebar
160.02 undulasi, belokan patah, sempit
260.95 baik, lebar
308.71 sedikit undulasi, belokan patah, lebar
212.46 baik, lebar
157.38 undulasi, sempit
516.69 undulasi, bottle neck

Column1
Mean
Standard Error
Median
Mode
Standard Deviation
Sample Variance
Kurtosis
Skewness
Range
Minimum
Maximum
Sum
Count
Confidence Level(95,0%)

2.92
0.19
3.00
3.00
0.67
0.45
0.19
0.09
2.00
2.00
4.00
35.00
12.00
0.42

3
3
3
3
3
3
3
3
3
3
3
4

2
2
3
2
3
4
3
3
4
3
3
3

Column1
Mean
Standard Error
Median
Mode
Standard Deviation
Sample Variance
Kurtosis
Skewness
Range
Minimum
Maximum
Sum
Count
Confidence Level(95,0%)

3.083333
0.083333
3
3
0.288675
0.083333
12
3.464102
1
3
4
37
12
0.183415

2
2
3
2
3
4
3
3
4
3
3
3
7

99%
99%
99%
99%
99%
99%
99%
99%
99%
99%
99%
99%
98%

3
3
3
3
3
3
3
3
3
3
3
3

Column1
Mean
Standard Error
Median
Mode
Standard Deviation
Sample Variance
Kurtosis
Skewness
Range
Minimum
Maximum
Sum
Count
Confidence Level(95,0%)

3
0
3
3
0
0
Err:512
Err:512
0
3
3
36
12
0

Column1
Mean
Standard Error
Median
Mode
Standard Deviation
Sample Variance
Kurtosis
Skewness
Range
Minimum
Maximum
Sum
Count
Confidence Level(95,0%)

3.23
0.36
3.00
3.00
1.30
1.69
6.16
2.18
5.00
2.00
7.00
42.00
13.00
0.79