Engr. Khaled Al-Sarawi Consulting Engineering: Labor Cost

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Project:

Commercial Building

Client:

Mr. AbdulRahman Mohhamad Al-Ghanam

Loaction:

Mubarraz
Engr. Khaled Al-Sarawi Consulting engineering

Consultant:
Subject:

Comparison between the utilization of Hollow Core Slab


and Conventional Slab

AT GROUND FLOOR
Volume of Concrete (m3)

Hollow Core Slab


lump sum

Labor Cost
Weight of Rebars (Kg)

lump sum

TOTAL COST
DIFFERENCE
GRAND SAVINGS

10198kg x 000.00 SR = 00000.000 SR

10198kg x 000.00 SR = 00000.000 SR


not applicable

Labor Cost

89m x 000.00 SR = 0000.000 SR


89m x 000.00 SR = 0000.000 SR

Labor Cost
Formwork Materials

Conventional Slab

535m x 000.00 SR = 0000.000 SR


535m x 000.00 SR = 0000.000 SR

lting engineering

w Core Slab

Conventional Slab

.00 SR = 0000.000 SR

.00 SR = 0000.000 SR

000.00 SR = 00000.000 SR

000.00 SR = 00000.000 SR

0.00 SR = 0000.000 SR

0.00 SR = 0000.000 SR