Professional Documents
Culture Documents
Engr. Khaled Al-Sarawi Consulting Engineering: Labor Cost
Engr. Khaled Al-Sarawi Consulting Engineering: Labor Cost
Engr. Khaled Al-Sarawi Consulting Engineering: Labor Cost
Commercial Building
Client:
Loaction:
Mubarraz
Engr. Khaled Al-Sarawi Consulting engineering
Consultant:
Subject:
AT MEZANNINE FLOOR
Volume of Concrete (m3)
Labor Cost
Weight of Rebars (Kg)
lump sum
TOTAL COST
DIFFERENCE
GRAND SAVINGS
Labor Cost
Labor Cost
Formwork Materials
Conventional Slab
lting engineering
w Core Slab
Conventional Slab
0.00 SR = 0000.000 SR
0.00 SR = 0000.000 SR
x 000.00 SR = 00000.000 SR
x 000.00 SR = 00000.000 SR
000.00 SR = 0000.000 SR
000.00 SR = 0000.000 SR