Project:

Commercial Building

Client:

Mr. AbdulRahman Mohhamad Al-Ghanam

Loaction:

Mubarraz
Engr. Khaled Al-Sarawi Consulting engineering

Consultant:
Subject:

Comparison between the utilization of Hollow Core Slab


and Conventional Slab

AT MEZANNINE FLOOR
Volume of Concrete (m3)

Hollow Core Slab


lump sum

Labor Cost
Weight of Rebars (Kg)

lump sum

TOTAL COST
DIFFERENCE
GRAND SAVINGS

39741.52kg x 000.00 SR = 00000.000

39741.52kg x 000.00 SR = 00000.000


not applicable

Labor Cost

251m x 000.00 SR = 0000.000 SR


251m x 000.00 SR = 0000.000 SR

Labor Cost
Formwork Materials

Conventional Slab

848.08m x 000.00 SR = 0000.000 SR

848.08m x 000.00 SR = 0000.000 SR

lting engineering

w Core Slab

Conventional Slab

0.00 SR = 0000.000 SR

0.00 SR = 0000.000 SR
x 000.00 SR = 00000.000 SR
x 000.00 SR = 00000.000 SR

000.00 SR = 0000.000 SR

000.00 SR = 0000.000 SR