Professional Documents
Culture Documents
Jones Engineering
Jones Engineering
Req No:SA01.0027.04-003
info@joneseng.com
Philip Donohoe
SA01.0027-04
Details of VO/
Requisitioned by:
Joe Kinsella
VE/EXCL
Authorised by:
Jason Hanley
ATTENTION OF
Date:
30-May-16
Item
No.
Quantity
50
20
20
20
10
20
10
30
10
30
1/2"
GI tees (Hitachi)
11
10
1/2"
12
30
1/2"
13
10
14
10
15
10
16
10
17
20
18
Head Code
BOM/VE
EXCL/VO
Required by
Date
19
20
21
A full description of items required saves time.
Please pre-plan your requirements to give stores a minimum of 3 working days to expedite materials.
BOM = Bill of Materials (Contract) VE = Value Engineering on Site EXCL = Exclusion from Contract VO = Variation (must have VO No.)
Office Use
JONES ENGINEERING
Qty
Unit Sr
Total Sr
10
350.00
3,500.00
10
300.00
3,000.00
10
260.00
2,600.00
10
150.00
1,500.00
20
100.00
2,000.00
150.00
750.00
4,265.00
4,265.00
1,450.00
1,450.00
320.00
320.00
875.00
875.00
320.00
320.00
10
130.00
1,300.00
30
35.00
1,050.00
150.00
150.00
135.00
270.00
80.00
80.00
30
17.00
510.00
18
65.00
1,170.00
20
16.00
320.00
50
13.00
650.00
15
45.00
675.00
20
7.50
150.00
30
4.50
135.00
20
3.00
60.00
150
3.00
450.00
20
1.80
36.00