Professional Documents
Culture Documents
Adj - TNH (Indonesia)
Adj - TNH (Indonesia)
Adj - TNH (Indonesia)
IKK
#REF!
#DIV/0!
m2
1 lantai
Penyesuaian Material Yang Berbeda
#REF!
Elemen Bangunan
A. Biaya Langsung
Struktur & Rangka Atap#N/A
Penutup Atap
#N/A
Plafond
#N/A
Dinding, Pintu & Jendel#N/A
Lantai
#N/A
Utilitas
Total Biaya Langsung (A)
B. Biaya Tidak Langsung
Profesional Fee (3%)
Biaya Perijinan (1,5%)
Keuntungan Kontraktor (10%)
l Biaya Tidak Langsung (B)
Total BRB ( A+B)
PEMBULATAN
IKK Prov
IKK Kab/Kota
Material Standar
Hasil Penyesuaian
BTB Spesifikasi Standar
Bangunan per-element
bangunan
IMM
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
BRB / RCN ( / m )
#DIV/0!
#DIV/0!
jurig-W216B
Ur aian
- Pintu masuk teralis besi
- Pagar pas. bt.bata 1,5 m+besi depan
- Pagar pas. bt.bata 1 m
- Pagar pas. bt.bata 1.5 m
- Pagar pas. bt.bata 2 m
- Pagar pas. bt.bata 3 m
- Pagar pas. bt.bata 4 m
- Pagar pas. celcon 3 m
- Pagar pas. bt.batako 1 m
- Pagar pas. bt.batako 1.5 m
- Pagar pas. bt.batako 2 m
- Pagar pas. bt.batako 3 m
- Pagar pas. bt.batako 4 m
- Pagar pas. Panel beton 1,6 m
- Pagar pas. Panel beton 2,0 m + kawat duri
- Pagar pas. Panel beton 2,5 m + kawat duri
- Pagar pas. Panel beton 2,4 m
- Pagar pas. Panel beton 2,8 m
- Pagar pas. Panel beton 3,2 m
- Pagar pas. BRC 0,9 m
- Pagar pas. BRC 1,2 m
- Pagar pas. BRC 1,75 m
- Pagar pas. BRC 1,90 m
- Pagar besi L + kawat duri 7 jalur
- Pagar besi L + kawat ayam (t = 4 m)
- Pagar besi pipa + kawat ayam (t = 4 m)
- Jalan (aspal penetrasi)
- Jalan (aspal hotmix 3cm)
- Jalan dr plesteran
- Jalan dr rabat beton
- Jalan dr beton
- Jalan dr kerikil tdk dipadatkan
- Halaman dr ubin PC
- Halaman dr keramik+pergola kayu
- Halaman dr keramik
- Halaman dr grass block
- Halaman dr paving block
- Halaman dr paving block tutup al.gel
- Halaman dr koral sikat
- Halaman dr bt. alam
- Halaman parkir tutup canopy
- Tanki air 1000 ltr
- Tanki air 1000 ltr (+ menara besi 3 m)
- Tanki air 1000 ltr (+ menara besi 6 m)
- Tanki air 2000 ltr
- Tanki air 2000 ltr (+ menara besi 6 m)
- Tanki air 3000 ltr
- Tanki air 4000 ltr
- Tanki air 15000 ltr
- Tanki air 8000 ltr
- Saluran tertutup (gorong2) 1 m
- Saluran air terbuka(bt.kali+bata) L=,6
- Saluran air terbuka(bt.kali+bata) L=,4
- Saluran air terbuka(bt.kali+bata) L=,2
Harga Satuan
250,000
200,000
410,000
329,000
660,000
534,000
1,130,000
890,000
410,000
460,000
448,000
609,000
1,080,000
183,750
265,830
320,830
270,000
310,000
380,000
161,000
189,000
252,000
269,000
62,910
189,500
253,000
226,920
226,920
40,000
80,000
395,160
67,400
44,000
346,600
96,600
92,910
131,530
338,530
80,030
97,500
450,000
1,200,000
1,500,000
2,200,000
1,520,000
2,200,000
3,780,000
5,040,000
18,900,000
8,400,000
1,600,000
380,000
310,000
200,000
BCTsar - 320740427.xlsx
- Lift Penumpang
- Sumur bor (deepwell)+kelengkapannya_ 92 m
- Sumur pantek (jet pump)
- Sumur bor (jet pump)
- Tiang PJU
- Penangkal petir (1 set)
- Daya Listrik
270,000,000
178,250,000
5,000,000
48,500,000
2,156,700
33,000,000
550,000
BCTsar - 320740427.xlsx
Data 1
Data 2
Data 3
Data Properti
Tanah Kosong
Tanah Kosong
Tanah kosong
Alamat
Jl.Selayar MM2100
MM2100
HGB
HGB
HGB
Uraian
Dokumen
HGB
18,000
20,000
85,000,000,000
Diskon (%)
67,000,000,000
5%
61,275,000,000
43,250,000,000
2,162,500
5%
63,650,000,000
37,500,000,000
64,500,000,000
5%
80,750,000,000
25,000
15,000
26,000
63,650,000,000
2,448,077
61,275,000,000
2,451,000
Campuran
Campuran
Campuran
Campuran
Lokasi
Dokumen
SHM
Luas Tanah ( m)
SHM
20,913
Karakteristik Fisik
Matang, Pemadatan
Penggunaan
Pabrik
SHM
6,000
SHM
7,000
1,223
Matang
Sawah
Matang
Tanah Kosong
Tanah Kosong
Tanah Kosong
Waktu
Penyesuaian
Peruntukan (%)
Lokasi (%)
Dokumen (%)
0%
0%
0%
-2%
(43,250)
-2%
(48,962)
-2%
(49,020)
0%
0%
0%
-2%
(43,250)
-2%
-2%
(49,020)
10%
216,250
10%
244,808
10%
245,100
Penggunaan (%)
0%
2%
48,962
2%
49,020
Waktu (%)
0%
0%
0%
Total Penyesuaian
6%
129,750
8%
244,808
8%
196,080
2,292,250
2,544,072
45,000,000,000
2,692,885
dibulatkan menjadi
2,647,080
2,500,000