Similar to pipeline, there are 3 main components in PoF scoring i.e. third party damage, inspection
results and design & operation. Dredging and reclamation barges and vessels is no longer the most
dominant PoF component for riser segments as no reclamation activities around FSRU area.
The components are as follow:
Inspection results
o
Pressure (weighting 5 %)
Based on detailed description from Risk Methodology Report, the summary of Riser PoF calculation is
shown in Table below.
Weighting
(%)
Vessel Traffic
10
No shipping
lane/traffic
Riser Guard
15
Riser guard
is intact
Thidr Party
Damage
Inspection
Results
Design and
Operation
3.6
2
Local
fishermen
shipping
lane
Score
3
Regional
fishermen
shipping
lane
Riser guard
is damaged/
coroded/
colided by
vessel
Sea Patrol
Regular Sea Irregular Sea
Stand By
Patrol to
Patrol to
Around
FSRU
FSRU
FSRU
Properly
Marking/
marked with
buoys in
buoys/
sight
markers
National
shipping
lane
International
shipping
lane
No riser
guard
available
Rare Sea
Patrol to
FSRU
No Sea
Patrol
Around
FSRU
No
markings/
buoys
Sea Patrol
Frequency
Around FSRU
Markings
Around FSRU
Marine Growth
15
0-10%
10-30%
30-50%
50-80%
>80% or
never
inspected
ILI Survey
Results
10
0-10%
10-30%
30-50%
50-80%
>80% or
never
inspected
(-1100) mV
more
to (-2000)
more
(-850) mV to
(-750) mV to negative
mV or (-800)
positive than
(-1100) mV
(-850) mV than (-2000)
mV to (-850)
(-750) mV
mV
mV
Free span
Free span 0 - Free span
Free span
75 - 100 %
25 %
25 - 50 %
50 - 75 %
No free span
or over the
allowable
allowable
allowable
allowable
span
span
span
span
CP Survey
Results
10
Free Span
15
Location
10
Above water
Underwater
Splash Zone
Operational to
Design
Pressure Ratio
0 - 30%
30 - 50%
50 - 70%
70 - 85%