PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM

CHAPTER I PROJECT
CHNG I: GII THIU D N
INTRODUCTION
Long Son Petrochemicals Co., Ltd. (LSP) is
Cng ty TNHH Ha du Long Sn l ch
the owner of the Long Son Petrochemicals
u t ca d n T hp ho du Long
Complex Project which is formed based on
Sn, c thnh lp da trn c s cc
objectives and orientations stipulated in the
mc tiu, nh hng chin lc v quy
strategy & planning for the countrys oil &
hoch pht trin ca ngnh cng nghip
gas and chemical industry development as
ch bin du kh v sn xut ha cht
well as the development of Vietnams
cng nh s pht trin ca cc ngnh
industries. The complex will be located in
cng nghip ca Vit Nam. T hp ha
the Long Son Island, Northwest of Vung Tau
du ny s c xy dng ti o Long
City, Ba Ria Vung Tau province. The
Sn, pha Ty Bc thnh ph Vng Tu
establishment of the complex is a part of
thuc tnh B Ra Vng Tu. D n l
Vietnams master plan and orientation for the
mt phn trong qui hoch tng th v s
petrochemical industry. The complex area is
nh hng ca cng nghip ho du Vit
approximately 464 hectares and includes
Nam. Din tch t hp khong 464 hecta
area for future expansion.
v bao gm khu vc d phng cho nng
cp m rng trong tng lai.
This document introduces the design basis
and general design specifications of process,
Ti liu ny m t c s thit k v c
input and output material, and other facilities
tnh k thut thit k chung v cng ngh,
for Central Utility Plant (CTU) during FS
nguyn liu u vo v sn phm u ra,
phase and is a basic principle as conceptual
v cc h thng thit b lin quan khc
design for the detailed engineering. During
cho Phn xng ph tr
detailed engineering phase, there might be
trung tm (CTU). thuc giai on nghin
some
minor
change
because
of
cu kh thi v l c s thit k cho giai
recommended by EPC Contractor and it will
on thit k chi tit. Trong giai on
be updated according to such modification.
thit k chi tit, mt s thay i nh c
The information of the plant are as
th c xut bi nh thu EPC v ti
followings:
liu s c cp nht theo cc thay i
ny. Cc thng tin c bn ca phn
- Plant name: Central Utility Plant (herein
xngnh my nh sau:
after called CTU)
- Tn nh my: Phn xngNh my
- Process: Auxiliary Boiler unit, Water
ph tr trung tm (sau y c gi
plant and IA/PA plant
l "CTU")
-

Product: Steam, Water, Instrument air


and plant air

Raw material: Import electricity , Fuel

Cng ngh: L hi
ph, Khu x l nc v Trm khi
nn

for Auxiliary Boiler and treated water


from third party

Sn phm: Hi,
nc, kh nn..

Nguyn
liu:
in
t
li, nhin liu cho l
hi v nc thy cc