ENVIRONMENT
SYSTEM
CLIENT
: 200
: BPML QM03-16
DESCRIPTION
: GAUGE CALIBRATION
: JL Hatekar
SIGNATURE
DATE
TEAM
Approved By
: Kabir R (PwC)
Page 1 of 29
Logistics - Create
T.Code
IP11
2. Input Data
Enter the Input parameters, which need to be given by the user during the testing of this
scenario.
2. Input the value for the fields and then if required, copy the screen shot of the input screen
after the table.
3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2
for every screen.
1.
2.1
Nature of the
Field
Mandatory
Page 2 of 29
Testing: Unit Testing / User Manual
Select Packages
Click New Entry And make the entries as per requirement in respective columns as shown below
Page 3 of 29
Testing: Unit Testing / User Manual
END
Page 4 of 29
Testing: Unit Testing / User Manual
Logistics - Create
T.Code
IA05 / 06
ENTER
Page 5 of 29
Testing: Unit Testing / User Manual
Tick the required calibration frequency and Go to Insp. Charat bottom menu and click
Page 6 of 29
Testing: Unit Testing / User Manual
Select the MIC by drill down or Select Quant. / Qual. Characteristics, type Short text of Insp Char. And go to Control Indicator
and tick required data as shown in below screen and tick
Page 7 of 29
Page 8 of 29
Testing: Unit Testing / User Manual
Select the selected set and click on tick following screen will display.
Also select the defect catalog and code group and ENTER
Select the sampling scheme from drill down. Enter, following screen will display.
Page 9 of 29
Testing: Unit Testing / User Manual
Similarly for Quantitative char. Tick on Quant. And type desc, select the line and go to control indicator. And select the
required function as shown in following screen.
Click on tick,
Page 10 of 29
Testing: Unit Testing / User Manual
Page 11 of 29
Testing: Unit Testing / User Manual
Menu Path
Logistics - Create
T.Code
IP42 / 02/ 03
Page 12 of 29
Testing: Unit Testing / User Manual
Select Maint. Plan. Cat. As PM Maintenance Order and select the strategy from drill down.
Enter
Page 13 of 29
Testing: Unit Testing / User Manual
Page 14 of 29
Testing: Unit Testing / User Manual
Go to Maint. Plan scheduling parameters tab enter, enter Call horizon, Scheduling period, tick completion requirement,
Start of cycle.
Page 15 of 29
Testing: Unit Testing / User Manual
Page 16 of 29
Testing: Unit Testing / User Manual
Click on
Tick of Equipment task list if the task list is created for an equipment or tick on Gen. task if the task list is created for
general ( All items same) & execute. Following screen will display.
Page 17 of 29
Testing: Unit Testing / User Manual
Save and following screen will display, and Created maintenance plan No. will display at bottom of Screen ( Here it is 151)
Page 18 of 29
Testing: Unit Testing / User Manual
Page 19 of 29
Testing: Unit Testing / User Manual
Click of Start date of start of cycle will display or give date of start of cycle
Page 20 of 29
Testing: Unit Testing / User Manual
Save to start the Cycle, the Inspection lot / Order will get created.
To check inspection lot T code QA32, The schedule call can be seen from IP24, to
see the Order T code IW33
To see Inspection lot T codeQA32
Page 21 of 29
Testing: Unit Testing / User Manual
Execute,
Page 22 of 29
Testing: Unit Testing / User Manual
Page 23 of 29
Testing: Unit Testing / User Manual
Execute , -- Work order 4000502 is created.
Enter
Page 24 of 29
Testing: Unit Testing / User Manual
Go to Operation Tab
END
Page 25 of 29
Testing: Unit Testing / User Manual
Page 26 of 29
Testing: Unit Testing / User Manual
Page 27 of 29
Testing: Unit Testing / User Manual
Page 28 of 29
Testing: Unit Testing / User Manual
Page 29 of 29