Inspection Test
Inspection Test
Inspection Test
PT PLN (Persero)
KSO Amythas Arkonin Rekadaya
DOCUMENT No.
ITP-YB-001-NW-BJ-002
SCOPE
ALL AREA
Rev
COMPILED BY
PROJECT NAME
CLIENT
PT PLN (Persero)
CONTRACTOR
CONTRACTOR
SPECIALITY
INSTRUMENT
APPROVED BY
APPROVED BY
:A
NWPCI
NWPCI
TAME
KSO
PLN
ITP-YB-001-NW-BJ-002
ALL AREA
APPROVED BY
PLN
CONSORTIUM OF
PT PLN (Persero)
KSO Amythas Arkonin Rekadaya
ITP No.
:ITP-YB-001-NW-BJ-002
Project No.
:NWPCI-BJXM
Rev
:A
Date
:07/07/2010
LEGEND CLASSIFICATION
NOTIFICATION
Inspection Request in writing and require a minimum of 12 hours notice of impending inspection / test. 12
SW
RI
ABBREVIATIONS
AWS
PWHT
ASME
CSA
ITP
ASNT
WPS
Tech.
Technical Specification
ASTM
PQR
N/A
Not Applicable
API
NDE
WQTR
GB
NOTIFICATION
30 minutes after the acceptance has started, if the invited inspector fails to be present at the specified location, it is assumed that the inspector has agreed with the work.
Afterwards we will submit acceptance report to you for your confirmation by signature.30
Althhough we have worked out ITP beforehead, our ITP may be modified according to the exact site circumatances.
Althhough we have worked out ITP beforehead, our ITP may be modified according to the exact site circumatances.
:ITP-YB-001-NW-BJ-002
:NWPCI-BJXM
:A
:07/07/2010
CONSORTIUM OF
PT PLN (Persero)
PLTU 3 BANGKA BELITUNG 2 x 30 MW
SPECIALITY
No.
INSTRUMENT
SCOPE
ITEM ACTIVITIES
REFERENCE DOCUMENT
ITP No.
:ITP-YB-001-NW-BJ-002
Project No.
:NWPCI-BJXM
Rev
:A
Date
:07/07/2010
ALL AREA
VERIFYING
INSPECTION ACTIVITIES
DOCUMENT
NWPCI
TAME
PLN/KSO
P&T
1.0
1.1
2.0
3.0
Procedures
Praparation
2.1
visual
2.2
visual
2.3
visual
Inspection Report
P&T
P&T
Inspection Report
P&T
CONTROL CENTER
3.1
3.2
3.3
CONSORTIUM OF
PT PLN (Persero)
PLTU 3 BANGKA BELITUNG 2 x 30 MW
SPECIALITY
No.
INSTRUMENT
SCOPE
ITEM ACTIVITIES
REFERENCE DOCUMENT
ITP No.
:ITP-YB-001-NW-BJ-002
Project No.
:NWPCI-BJXM
Rev
:A
Date
:07/07/2010
ALL AREA
VERIFYING
INSPECTION ACTIVITIES
DOCUMENT
NWPCI
TAME
PLN/KSO
P&T
SW
SW
P&T
SW
SW
P&T
P&T
P&T
P&T
P&T
SW
SW
4.0
5.0
4.1
Visual check
4.2
5.2
5.3
5.4
7.0
Inspection Report
Tech. Spec., Drawing, Proc.,
Manual Instruction.
Inspection Report
CABLE
5.1
6.0
visual
Inspection Report
Inspection Report
Install cable, cable ladder rack, support fitting, etc
Tech. Spec., Drawing, Proc.,
Manual Instruction.
Check cable gland and sealing, cable marker, line to line to groung
Inspection Report
resistance, both ends of home run cables
Inspection Report
INSTRUMENT PIPE-LINES
6.0
Visual Inspection
6.1
P&T
SW
SW
6.2
Inspection Report
P&T
SW
SW
visual
CONSORTIUM OF
PT PLN (Persero)
PLTU 3 BANGKA BELITUNG 2 x 30 MW
SPECIALITY
No.
INSTRUMENT
SCOPE
ITEM ACTIVITIES
REFERENCE DOCUMENT
ITP No.
:ITP-YB-001-NW-BJ-002
Project No.
:NWPCI-BJXM
Rev
:A
Date
:07/07/2010
ALL AREA
VERIFYING
INSPECTION ACTIVITIES
DOCUMENT
NWPCI
TAME
PLN/KSO
P&T
SW
SW
P&T
SW
SW
P&T
7.0
8.0
Inspection Report
8.1
10.0 DOCUMENTATION
All documentation/inspection record related shall be documented and submitted to
Client as per Contract Doc./ Contract, Tech. Spec., Proc.
All Inspection
Reports.