CAUS

DO

PROJECT : EPC FOR NEW F

REVISION HISTORY
NO

DESCRIPTION

CAUSE AND EFFECT DIAGRAM


DOC NO: 29-PP-163-1001

EW FERTIL JETTY ETHYLENE VAPOUR RETURN ARM

PROJECT TITLE:
PREPARED BY

CHECKED

APPROVED

NEW FERTIL JETTY VAPOUR RETURN ARM

DOCUMENT TITLE:

CAUSE AND EFFECT DIAGRAM

BOROUGE CONTRACT NO:

GOGAS DOCUMENT NO:

XXXXXXXXXXXXX

29-PP-163-1001

XXXXXXXXXXXXX

29-PP-163-1001

RN ARM

CT TITLE:

NEW FERTIL JETTY VAPOUR RETURN ARM

CAUSE AND EFFECT DIAGRAM


GOGAS DOCUMENT NO:

SHEET 1 OF 3

29-PP-163-1001

REV A

29-PP-163-1001

REV A

SHEET INDEX
PAGE NO

DESCRIPTION

SL.NO

SYMBOL

COVER SHEET

INDEX / LEGEND SHEET

ST

CAUSE AND EFFECT CHART

--

ATTACHMENT 1: CAUSE AND EFFECT MATRIX OF LOADING ARM BY VENDOR

SP

I*

S*

IA

AH

10

AD

11

12

OP

13

CL

SL NO.

SYMBOL

CRM

DCS

FLD

F& G

SYS

LOG

MCC

PKG

ESD

NOTES

SL NO.

ABBREVIATION

VOTING

PO

MO

CAUSE AND EFFECT SYMBOLS

BOL

DESCRIPTION
MANUALY INITIATED ACTION (START/STOP/TRIP/OPEN/CLOSE)
AUTOMATIC START

AUTOMATICALLY INITIATED TRIP

AUTOMATICALLY INITIATED DELAYED TRIP-EFFECT DOES NOT OCCUR IF CAUSES CLEAR BEFORE THE EXPIRY OF THE TIME DELAY

AUTOMATIC STOP

DCS INTERLOCK ACTION WITH SUPERSCRIPT AS INTERLOCK NUMBER

ESD INTERLOCK ACTION WITH SUPERSCRIPT AS ESD NUMBER

INHIBIT ACTION

HARDWIRED ALARM / LAMP INDICATION / HOOTER

ALARMS ON DCS INITIATED BY ESD /FGS/ PLC

PERMISSIVE ACTION

AUTOMATIC OPEN

AUTOMATIC CLOSE

LOCATION SYMBOLS

BOL

DESCRIPTION

RM

CONTROL ROOM LOCATED PANEL (JETTY CONTROL ROOM)

CS

DCS INTIATED

FIELD LOACTED (ETHYLENE LOADING BIRTH)

HARDWIRE INPUT FROM FIRE AND GAS SYSTEM

YS

CC

SD

INTERNALLY GENERATED BY PLC HARDWIRE


LOGIC GENERATED INTERNAL TAG
HARDWIRE INPUT / OUTPUT FROM MCC
HARDWIRED INPUT / OUTPUT FROM PACKAGE PLC -VENDOR PANEL
EMERGENCY SHUTDOWN SYSTEM

OTHER ABBREVIATIONS

VIATION

DESCRIPTION

ING

1 OO 2: ONE OUT OF TWO VOTING SYSTEM,TWO SENSORS ARE USED IN PARALLEL TO DETECT A CONDITION. 2 OO 3: TWO OUT OF THREE VOTING SYSTEM, THREE SENSORS ARE USED IN PARALLEL TO DETECT A CONDITION. THE

PROCESS OVERIDE SYSTEM: THE TEMPORARY SUPPRESSION OF THE PARTICULAR CAUSES SO AS TO FACILITATE PLANT STARTUP OR SHUTDOWN. THESE OVERIDES SHALL BE AUTOMATICALLY CANCELLED WHEN THE TRIP BECO
WHEN THE PROCESS IS IN NORMAL OPERATING CONDITION

MAINTENANCE OVERRIDE SYSTEM: THE TEMPORARY SUPPRESSION OF THE PARTICULAR CAUSES, SO AS TO FACILITATE MAINTENANCE. THESE OVERRIDES SHALL BE CANCELLED MANUALLY, MOS SHALL BE REALIZED THROUGH S
PROTECTION.

PROJECT TITLE:

NEW FERTIL JETTY VAPOUR RETURN ARM

DOCUMENT TITLE:

CAUSE AND EFFECT DIAGRAM

BOROUGE CONTRACT NO:

GOGAS DOCUMENT NO:

XXXXXXXXXXXXX

29-PP-163-1001

XXXXXXXXXXXXX

29-PP-163-1001

DESCRIPTION

DESCRIPTION

DESCRIPTION

G SYSTEM, THREE SENSORS ARE USED IN PARALLEL TO DETECT A CONDITION. THE ACTION ONLY BEING TAKEN WHEN AT LEAST TWO OF THEM AGREE.

WN. THESE OVERIDES SHALL BE AUTOMATICALLY CANCELLED WHEN THE TRIP BECOMES HEALTHY OR AT THE EXPIRY OF THE "ALLOWED " OVERRIDE TIMER

OVERRIDES SHALL BE CANCELLED MANUALLY, MOS SHALL BE REALIZED THROUGH SOFTWARE SWITCHES AND SHALL BE PROVIDED WITH PASSWORD

CT TITLE:

NEW FERTIL JETTY VAPOUR RETURN ARM

CAUSE AND EFFECT DIAGRAM


GOGAS DOCUMENT NO:

SHEET 2 OF 3

29-PP-163-1001

REV A

29-PP-163-1001

REV A

SL#
TAG NO.

1
29-XS-0008
LOADNG / RETURN ARM ESD ACTIVATED

2
29-HS-0009
ERC MANUALLY ACTIVATED

3
29-PAL-0006A

4
29-XA-0010

6
DESCRIPTION
P&ID NO.
LOCN

29-PP-152-1101/02
PKG
S 1001

29-PP-152-1101
PKG
S 1001

VOTING
OVERIDE
INTERLOCK
ETHYLENE SHIPPING PUMP
LOADING ARM ESD VALVE
JETTY END PIPELINE COOL DOWN ESD VALVE
LOW NITROGEN PRESSURE ALARM
ALARM IN DCS
LOW NITROGEN PRESSURE ALARM
ALARM IN DCS
ETHYLENE METERING STATION

29-XV-0003
29-XV-0006
29-PAL-0006
29-XA-0011
29-PAL-0018
29-XA-0022
40-XA-110

DESCRIPTION

ETHYLENE SHIPPING PUMP

TAG NO.

EFFECT

40-PC-103A

40-PC-103B

N
O
TE
S

CAUSE

T
T

T
T

7
29-PAL-0018A

NOTES
PROJECT TITLE:

NEW FERTIL JETTY VAPOUR RETURN ARM

DOCUMENT TITLE:

CAUSE AND EFFECT DIAGRAM

BOROUGE CONTRACT NO:


GOGAS DOCUMENT NO:
SHEET 3 OF 3

XXXXXXXXXXXXX
29-PP-163-1001
REV A

40-PP-152-1141

29-PP-152-1102

29-PP-152-1102

29-PP-152-1101

29-PP-152-1101

29-PP-152-1101

29-PP-152-1101

40-PP-152-1102

40-PP-152-1102

PID

DCS

DCS

DCS

DCS

DCS

ESD

ESD

ESD

ESD

LOCN SL NO