Stepped Channel Design
Stepped Channel Design
Project title:
Project code:
Calculation title:
Serial no:
Project manager:
Chris Parsons
No. of sheets:
Status:
XXX
Preliminary
VG
Date:
Tender
10-Apr-14
Verified by:
Other (state)
DETAILED DESIGN
Date:
Levels of verification:
Approved by:
Created by:
Schematic
204819.EE
3B
3A
Date:
Computer analysis:
Yes:
Program(s):
No:
MS Excel
AutoCAD
Hardware:
AESJ2TV5Y1
NB: Calculations should state or refer to design input data and methodology
CONTENTS AMENDMENT RECORD
Sheet(s)
Rev.
Date
Description
Created
Verified
Approved
File Name:
Path:
\\sharj3-fs-01\TBG\Highways\PGS 400(0) SERIES - ROADS\PGS 4401 - 4500\PGS 4434 - Shis Interchnage to Khorfakkan Road & Tunnels\4 Calcs and Tech Data\Detailed Design\Drainage\65 - ca
Rev 1 (07/2012)
U
L
A
T
I
A CH2M HILL COMPANY
O
N
Calculation title:
Subject:
Introduction
Calculation sheet
S
H
C30 Stepped Channel upstream of Culvert C1/7
E
E
T
Created by:
VG
Project code:
204819.EE
Date:
4/10/2014
Serial no:
Verified by:
Sheet no:
xxx
1
Date:
Revision:
References/results
At Chainage 350.00, there is a steep gradient between C30 Wadi and the Culvert C1/7
upstream. This calculation is to design the stepped channel to convey storm flows from the
chainage 350.00 of C30 wadi to the Culvert C1/7 upstream.
Hydrology
C30 Wadi conveys flow from catchments C27, C28, C29, C31 & C32 and the adjacent road
surface runoff . Peak flows generated in the catchment are as follows
20 year
19.76 m3/s
1,185,600 l/min
30 year
21.81 m3/s
1,308,600 l/min
50 year
24.37 m /s
1,462,200 l/min
DD_updated hydrology.xlsx
Reference/TGN/Hydraulic Desig
TGN 27
The required input parameters are as follows:
27 o
27.3 m
2.70 m
2.50 m
1.00 m
2.00 m
27 o
0.415
0.51 C e
fe 0.5 f 1 tanh 0.628
Ce 1 Ce
fe =
0.620
2.7 m
2.395 m
PRISM - Calculation Sheet (Excel)
U
L
A
T
I
A CH2M HILL COMPANY
O
N
Calculation title:
S
H
C30 Stepped Channel upstream of Culvert C1/7
E
E
T
Subject:
Calculation sheet
c
Created by:
VG
Project code:
204819.EE
Date:
4/10/2014
Serial no:
Verified by:
Sheet no:
xxx
2
Date:
Revision:
References/results
1.401 m
3.502 m2
PW =
5.302 m
DH =
2.642 m
6.21 m/s
Channel capacity, Q
Q =
21.75 m3/s
Q < Qreq
OK
7.90 m2/s
qw < 2m2/s
Not OK
No catchpit d/s of steps; it will
directly discharge to Culvert
1.85 m
0.825 m
dc > (dc)onset
OK
1.854
16.60408
Lmin =
Rev 1 (06/2012)
16.60 m
OK
PRISM - Calculation Sheet (Excel)
U
L
A
T
I
A CH2M HILL COMPANY
O
N
Calculation title:
Subject:
S
H
C30 Stepped Channel upstream of Culvert C1/7
E
E
T
Calculation sheet
c
Created by:
VG
Project code:
204819.EE
Date:
4/10/2014
Serial no:
Verified by:
Sheet no:
xxx
3
Date:
Revision:
References/results
Drawings
Design of the stepped cascade for wadi south is detailed on the following drawings
204819/652201/P0
- Profile
204819/652302/P0
- Cross-sections
Rev 1 (06/2012)
ation sheet
4819.EE
drology.xlsx
ation sheet
4819.EE
steps; it will
o Culvert
ation sheet
4819.EE
dc/h
20
0.731
1.398
2.042
3.292
4.81
6.294
25
0.745
1.424
2.08
3.354
4.9
6.413
30
0.743
1.421
2.076
3.348
4.891
6.4
Channel gradient,
35
40
0.729
0.702
1.393
1.342
2.035
1.96
3.281
3.16
4.794
4.617
6.273
6.042
(degrees)
45
0.664
1.269
1.855
2.99
4.368
5.717
50
0.616
1.178
1.721
2.775
4.054
5.306
rees)
55
0.559
1.07
1.563
2.52
3.681
4.817
60
0.495
0.946
1.382
2.228
3.255
4.26
65
0.423
0.809
1.182
1.906
2.784
3.644