Defect
Remedial Measures
NDE
MT/PT + RT/UT
Lack Of Fusion
Defective
weld
shall
be
removed
completely by gouging and/or grinding and
the resulting cavity to be properly prepared
for welding. Use moderate welding voltage
& current according to the base metal
thickness and re-weld the defective area
with moderate speed.
Gouge or ground from the weld face to
remove entire weld down to the root.
Select electrode according to welding
groove size and re-weld the defective area
with enough current to get the desired
penetration.
MT/PT + RT/UT
Lack Of Penetration
Cracking
Defective
weld
shall
be
removed
completely by gouging and/or grinding and
the resulting cavity to be properly prepared
for welding. Pre-heat the defective area
with gas torch. Ensure a sound root pass
and check for any flaws by PT. Complete
the welding.
Defective
weld
shall
be
removed
completely by gouging and/or grinding and
the resulting cavity to be properly prepared
for welding. Re-welding of the defective
area to be carried out.
MT/PT + RT/UT
MT/PT + RT/UT
Weld Discontinuity
Defective
weld
shall
be
removed
completely by gouging and/or grinding and
the resulting cavity to be properly prepared
for welding. Re-welding of the defective
area to be carried out.
MT/PT + RT/UT
Crater Pinhole
VT,MT/PT
Arc Strikes
Porosity
MT/PT + RT/UT
MT/PT + RT/UT
Undercut
Excessive Reinforcement
VT
MT- Magnetic Particle Test, PT- Penetrant Test, UT- Ultrasonic Test, RT- Radiography Test, VT- Visual
Test
Burn-through
Defective
weld
shall
be
removed
completely by gouging and/or grinding and
the resulting cavity to be properly prepared
for welding. Weld deposition to be carried
out with proper electrode and appropriate
current
settings
depending
on
the
thickness of the base metal.
MT/PT + RT/UT
MT- Magnetic Particle Test, PT- Penetrant Test, UT- Ultrasonic Test, RT- Radiography Test, VT- Visual
Test