Professional Documents
Culture Documents
Finance Management For Sae
Finance Management For Sae
AERO DESIGN
COMPETITION EAST
(FORT WORTH, TEXAS)
2016
CLASSES OF SAE
AERO
INTERNATIONAL
Regular.
Advanced.
Micro.
MISSION ERAGON
STRATEGY
An elite team zealously working on
specialized areas of Structures,
Propulsion and Simulation.
A well defined schedule on design,
manufacture and flying.
MISSION
IMPLEMENTATIONSCHEDULE OF ERAGON
Sept-Nov : Design and
Manufacture.
Dec-Feb : Expertise flying sessions
and working on presentation &
documentation.
MISSION
IMPLEMENTATIONDESIGN OF ERAGON
STRUCTURE:
CONFIGURATION OF AIRFOIL: Cambered 9417
TYPE OF WING: HIGH,SWEPT.
WING TO BODY RATIO: 1.2:1
LENGTH OF FUSELAGE: 48 inches.
EMPENNAGE: Elevator length- 20 inches.
Rudder length: 7.5 inches.
MISSION
IMPLEMETATIONMAKING OF ERAGON
Eragon is nurtured with the
unleashed power of IC
ENGINE and is harnessed by
metal servos.
MISSION
IMPLEMETATION- FINAL
OBJECTIVE
Accurate drop of
payload from a
minimum of 100 feet.
Additional systems
usage.
NEEDS
WORKSHOP
ASSISTANCE
FINANCE
FINANCIAL MANAGEMENT
TOTAL EXPENDITURE
Material
cost
Auxiliary
cost
Travel
Accommodation
Shipping of the
aircraft
Material cost
Auxiliary cost