Correct

Stair structure (green line) should be leaning on column

ground floor missing column

wrong

it was agreed that this opening will be removed

slab thickness of pitched roof slabs (POS 401-416) should be 15 cm instead 12 cm

slab thickness of pitched roof above arrival drop of area is 15 cm instead of 25 cm

slab thickness on POS 417 (above service lift and stairs L/09-11) should be 15 cm instead of 30
cm
GENERAL NOTE: FOUNDATIONS AND FOUNDATIONS SLABS SHOULD BE INCORPORATED FROM
STRUCTURAL DRAWINGS

MEZZANINE CROSS SECTION 02

WRONG

CORRECT

MISSALIGMENT IN ELEVATIONS IN SECTIONS AND PLANS

THICKNESS OF WALL ARROUND BALLROOM SHOULD BE CORDINATED IN SECTIONS AND PLANS


(THICKNES OF WALLS IS CORRECT IN PLANS )

arrival level beneath timber canopy and tree pit wrong parapet walls in section

wrong

correct (orange cross section)

mezzanine (POS 209) in elevation 03 wrong section

wrong

correct