Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 1

Option 1: Question for Business. Why we have lot qty less than 1?

Option 2: Base Sample Quantity reduced to 0.001 (current setting 0.01)


All Corn Inspection Plans (Master data)
Option 3: UoM conversion. New UoM example: 400 X = 1 BAG
All Corn Materials/QMIP and Inspection Plans header/Operations (Master data)
Option 4: Force BAPI to close results w/o available sample.

You might also like