800 & Sebahagian Lot 746 dan Basmen Letak Kereta, Di atas Lot 354, 355 & 742, Mukim Bandar Kuala
Lumpur, Daerah Kuala Lumpur, Wilayah Persekutuan.
Samsung C&T Corporation UEM
Construction JV Sdn Bhd
Method Statement
For
Mackintosh Probe Test
MAIN CONTRACT BP 03
Document
Ref No.
Discipline
STRUCTURE WORKS
Revision
00
Date Issued
08/03/2016
BP03-CN-MS-STR-000__
08/03/2016
Date
Details
Remarks
Authorised by:
Hyunseok Lee
Title
Technical Manager
Date
Signature
KL118
Method Statement
For
Mackintosh Probe Test
MAIN CONTRACT BP 03
Document
Ref No.
Discipline
STRUCTURE WORKS
Revision
00
Date Issued
08/03/2016
BP03-CN-MS-STR-000__
Date
08/03/2016
Details
Remarks
Ronnie Loo
Reviewed by:
Revision: 00
Title
Podium Construction
Manager
Norhanisah Hanafi
QAQC Manager
Mohd Rizam
Abd.Ghani
Hyunseok Lee
Technical Manager
Kyountae Kang
Project Construction
Manager
Date
Signature
KL118
TABLE OF CONTENTS
SECTION
PAG
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
PURPOSE
SCOPE
REFERENCES DOCUMENT
MANPOWER
PLANT & MACHINERIES
MATERIAL
WORK EXECUTION METHOD
SAFETY AND HEALTH
8.1
8.2
Information to Personnel
8.3
Emergency Arrangements
8.4
Permit Requirement
9.2
Contractual Requirements
11.0 APPENDICES
Revision: 00
KL118
1.0
PURPOSE
This method statement is prepared for given guideline on Mackintosh Pobe Test at a general
earthwork.
2.0
SCOPE
Mackintosh Probe Test is carried out to determine the bearing capacity of soil. The result
obtained from the test provides a rough estimation of the soil layer at a point.
3.0
REFERENCES DOCUMENTS
Relevant documents to be referred in accordance with this method statement:
No.
1.
BP03-QA-PL-GEN-0001
2.
3.
4.
BP03-HSE-PL-GEN-0001
BP03-HSE-PL-GEN-0003
5.
6.
7.
8.
10.
11.
12.
13.
4.0
Description
BP03-HSE-PL-GEN-0004
BP03-HSE-PL-GEN-0002
BP03-HSE-PL-GEN-0005
BP03-TEC-PL-GEN-0001
BP03-CN-PL-GEN-0001
BP03-MTS-0002 (In Aconex BP03-MS-0002)
Section 01 00 00 General Requirement
Structural Specification -Section 31 00 00
Earthworks.
BP03-CN-SPP-GEN-0013
MANPOWER
List of supervision and workforce to be involved in the work:
No.
Description
No. of person
1.
Project Manager
2.
Site Engineer
Revision: 00
KL118
5.0
3.
Site Supervisor
4.
Lab Tecnician
5.
Skilled Worker
6.0
Quantity.
1
TESTING EQUIPMENT
Testing equipment for field test as follow:
No
1
2
3
4
5
6
7
6.0
Quantity
1
1
1
1
1
1
1
MATERIAL
Materials delivered on site will be inspected and verify prior to use.
No.
1.
7.0
Equipment
Driving Hammer
Striker Plate
Rods
Barrel Connector
Driving Point
60 Cone
Auger
Type of Material
Grease
Remark
1
PROCEDURES
7.1
Preparotary Work
Ensure all the equipments and tools in good condition before assemble it to site.
Identify and ascertain that the areas to carry out the Mackintosh Probe Test.
Carry out clearing,grubbing and removing top soil as per method statement.
Revision: 00
KL118
7.1.1
Site Clearance
Prior to commencement of works, the contractor shall obtain the relevant work
permits from relevant authorities and permit to work from supervision consultant.
The contractor shall under take clearing of site in order to remove any existing
vegetation, steel, concrete, unused buildings identified for demolition, piping
7.2
Work Methodology
The rods(1.2m long and 12mm diameter) and hammer with total 4 kg are joint using
ground soil.
During the Mackintosh probing streamline the driving point in the longitudinal section
profile.
The number of blow required for every 300mm penetration recorded.
The probing to be terbimated when the blows counts of 400 (refusal) recorded over a
penetration of 300mm or less.
Revision: 00
KL118
Project Method Statement
After termination of probr the rods can be roatated clockwise at ground level by using
abox spanner.
Tools can be pushed into or pulled out of the soil using lifting/driving tool.
KL118
2. Relevant personnel on site shall be briefed of the emergency contact details, response and
made reference to procedures in accordance to Emergency Response Preparedness and
Crisis Management Plan.
3. Traffic Management Plan for emergency arrangement shall be made available at suitable and
appropriate work location.
9.2
Contractual Requirements
1. The inspection and test plan (ITP) shall be approved by SC.The ITP details for the work
shall be referred in Appendix 1. Checklist shall be used during inspection at hold point as
per Appendix 2.
Revision: 00
KL118
Project Method Statement
10.3
1. The work shall be carried out using the inspection form/checklist attached in Appendices and
to ensure the finishing quality of work shall be acceptable by SUJV and SC or CA
representative.
2. Should there is any Non-conformity of work issued, we will respond within agreed time. Root
cause shall be determined, correction of work shall be taken immediately if possible and
corrective action shall be taken accordingly within agreed date. All NCR shall be closed within
the agreed completion date.
11.0
APPENDICES
Appendix 1
Appendix 2
Revision: 00