Revised Abstract of Cost Khadukhel Collage
Revised Abstract of Cost Khadukhel Collage
Developmental Works
S.No
Amou
Description
Boundary wall
Rs.
Construction of Road
Rs.
Construction of Drain
Rs.
Rs.
Retaining Wall
Rs.
Foot Path
Rs.
Rs.
Street light
Rs.
Rs.
10
Rs.
11
Pumping Chamber
Rs.
12
Rs.
13
Rs.
14
Pumping Machinery
Rs.
Total. Rs.
SUB DIVISIONAL
Distric Buner
Amount
10902000 /7086188 /3116106 /1070764 /618608 /5375820 /2861428 /881214 /6025591 /410434 /414665 /3377434 /1534846 /600000 /44275098 /48259857 /-
COMPARATIVE STA
S.NO DESCRIPTION
ORIGINAL
A.A
MAIN BUILDING
31.89
EXAMINATION HALL
13.014
LABORATORY BLOCK
27.348
ADMINISTRATION BLOCK
16.908
CANTEEN BLOCK
DEVELOPMENTAL WORKS
TOTAL
26.707
6.286
36.854
159.007
COST OF LAND
15.837
EXTERNAL ELECTRIFICATION
1.500
10
ADVERTISEMENT CHARGES
0.100
11
12
14
ESCALATION
TOTAL
176.444
E STATEMENT
DIFFERENCE
38.753
6.863
15.866
2.852
31.939
4.591
18.716
1.808
REMARKS.
32.273
5.566
7.353
1.067
48.26
11.406
193.160
34.153
40.000
24.163
1.500
0.000
0.100
0.000
3.863
3.863
5.795
51.258
5.795
295.676 119.232
Name of work
Sub Head :
S.No Description
1
Main Building
Rs.
Examination Hall
Rs.
Laboratory Block
Rs.
Administration Block
Rs.
Rs.
Canteen Block
Rs.
Development Works
Rs.
Total. Rs.
Cost of Land
Rs.
Rs.
Advertisement Charges
Rs.
DETAIL STRUCTURAL/ARCHETECTURAL
DESIGN & DRAWING 2%
Rs.
10
11
12
Rs.
Total. Rs.
G.Total Rs.
say Rs.
EXECUTIVE ENGENEER
C&W DIVISION BUNAIR
SU
F COST
ner
Amount
38752673 /15865975 /31938999 /18715598 /32273423 /7352718 /48259857 /193159245 /40000000 /1500000 /100000 /3863185 /5794777 /16660000 /-