Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ME80

PREVENTATIVE MAINTENANCE
TECHNICAL DATA SCHEDULES
Building Management System
MECHANICAL

Activity

Type Of Service

Last Amendment Date:24/03/14

Check hard disc drive capacity and perform data base back up to both hard disc
and CD & archive CD data (for systems with work stations)

Check, record and if necessary reset:- set points including room temperatures and where applicable relative humidity
and CO2.
- dead bands (tolerances)
- overrides
- time and holiday schedules
- optimised heating and cooling start/stop times
- early morning warm-up
- economy cycle (where present)

Check response of all controlled plant to manually issued commands from the
central work station or portable interfaces.

Check & report all software and system programming for current compliance
with manufacturer's recommendations and current control requirements.

Check and record run times of air handlers and reset if necessary.

Check historical trend and event logs including alarms.

Check BMS displays are indicating correctly.

Energy Efficiency
- Check and record energy and water consumption (where applicable).
- Ensure control settings deliver comfort conditions and provide energy efficient
operation of the plant.

Record results in log book and provide written report detailing any faults and
recommendations.

Special Comments and Technical Data


D SERVICE RECOMMENDED ANNUAL BUT MAY VARY DEPENDING
ON SITE REQUIREMENTS.
ASSOCIATED SERVICES ME160, ME161, ME82, ME80A.
ROOM TEMPERATURE SET POINT CHANGES TO BE MADE WITH CLIENT
APPROVAL.

03/04/2014

1:31:37 PM

You might also like