Ans: Basically, automation system comes to reduce labour power and time in the
production. Here we can see the evolution systems with some examples. The goods
requited by society were produces in small quantities by craftsman who would know the
need of the community and produced them by their own hands with simple tools. The
apprentices or by another craftsman, who would make them to meet the requests made.
The parts and components used to make these machines had to be replaced when they
wore making parts so that interchangeability was achieved made setting up standards and
specifications important for meeting
The craftsmen gave way to engineers, workers, superiors and inspectors. Division of
labour became necessary to achieve efficiencies and the jabs that became specialized.
Competition has necessitated improved quality, reduced sates and better services to the
customer.
Automation systems cost huge sums of money and therefore a deep analysis of the
various factors has to be done. For services, automation usually means labour saving
devices in education, long distance learning technology helps in supplementing class
room instruction. The facilitating goods that are used are web site and videos.
Automation in the banking sector has resulted in ATMs which same the banks a huge
amount customer satisfaction. Automation is ideas when the service provided or the
product manufactured is highly standardized.
The machines have sensing and control devices that enable them to operate automobile.
The simplest of them called machine attachments replace human effort. They guide,
locate, move and achieve revise position by means of came, optical sensing. Load sensing
mechanisms and activate the controls to remove human intention.
Robots are higher in the order of automation as they perform a variety of tasks. They are
designed to move movements according to programmers written into the computer that
inside them.
With the help of automation, inspection of component can be done 100% ensures highest
quality identification and movement of materials are helped by bar codes which are read
and fed into the system far monitoring quantity, location, movement etc. They help the
automated systems to start information and provide information for effecting any changes
necessary. To make effective use of automated machines, we need to have the movement
of materials from and to different time as stores, automated, Automated storage and
Retrieval systems- ASRS- receive orders for materials from anywhere in the production
area, collect materials in the works times. Computers and information systems are used
for placing orders for matters, give commands adjust inventory records which show the
location and quantity of materials needed.
Automated guided vehicle systems- AGVS – are pallet trucks and unit load carriers
follow embedded guide wires or paint strips to destinations as programmed.
In an automobile showroom we can see all the work automatically with latest machine
Q2. State the important considerations for locating an automobile plant? Collect
information on layout planning of an automobile plant from various sources and
furnish the same.
Ans : To locate an automobile company or plant many thing should be consider. For an
automobile plant automated flaw lines, automated assembly lines, flexible manufacturing
systems, global transition rapid prototyping. Building manufacturing flexibility things are
necessity.
About the automated flow lines we can say it is a machine which is linked by a transfer
system which moves the parts by using handling machines which are also automated, we
have an automated flow line.
Human intervention ma is needed to verify that the operations ate taking place according
to standards. When these cab be achieved with the help of automation and the processes
are conducted with self regulation, we will have automated flow lines established.
Product layouts ate designed so that the assembly tasks are performed in the sequence
they are designed at each station continuously. The finished item came out at the end of
the line.
In automated assembly lines the moving pallets move the materials from station to station
and moving arms pick up parts, place them at specified place and system them by
perusing, riveting, & crewing or even welding. Sensors will keep track of there activities
and move the assembles to the next stage.
The machines are arranged in a sequence to perform operations according to the technical
requirements.
The tools are loaded, movements are effected, speeds controlled automatically without
the need for worker’s involvement.
The flexibility leads to better utilization of the equipments. It reduces the numbers of
systems and rids in reduction of investment as well as a space needed to install them. One
of the major cancers of modern manufacturing systems is to be able to respond to market
Demands which have uncertainties.
Prototypes do meet the specification of the component that enters a product and
performance can be measured on these.
It helps in con be reforming the design and any shortcomings can be rectified at low cost.
Flexibility has three dimensions in the manufacturing field. They are variety, volume and
time. There demands will have to be satisfied. In that sense they become constraints
which restrict the maximization of productivity. Every business will have to meet the
market demands of its various products in variety volumes of different time.
Manufacturing systems have flexibility built into them to enable organization meet global
demand. You have understood how the latest trends in manufacturing when implemented
help firms to stay a head in business.
Q3 . Who are the players in a project management? What are the various roles and
responsibilities of the players in a project management?
Ans : At first we will discuss about project management then we will discuss about
players in project management. Project management is the practice of controlling the use
of resources, such as cost, time manpower, hardware and software involved in a project.
That starts with a problem statement and end with delivery of a complete product.
Here we will see the participants of project management:
In the project management players individual and organizations both are involved-
That is actively involved in the project whose interests may be affected by the outcome of
the project.
Exert influence over the project and its results players or also called “stake holders’’ of
the project
Project manager- the individual responsible for managing the project.
Customer- the individual or organization that will use the product- the end result of the
project.
Performing organization- the enterprise whose employees are mast directly involved in
doing the work of the project.
Sponsors- the individual or group within or external to the performing organization that
funds the project.
Now, we will define the role and responsibilities of project management. Here are some
roles and responsibilities:
There are number of projects which an organization works on. It is not possible for one
individual to manage all the projects.
An experienced project manager and this team may manage more than one project at a
time.
The project team is responsible for ensuring that the project upon completion shall
deliver the gain in the business for which it is intended for.
-the project team has to properly co-ordinate with each other working on different aspects
of the project.
-the team members are responsible for the completion of the project as per the plans of
the project.
Characteristics of project mindset: - some of the characteristics of project mindset are the
following –
Time - it is possible to improve the pace of the project by reducing the time frame of the
process. The mindset is normally to work in a comfort made by stretching the time limits.
Responsiveness – it refers to quickness of response of an individual. The vibrancy and
livens of an individual or an organization are proportional to its capability of evolving
process and structure for superior responsiveness time constant.
Process – project mindset lays emphasis on flexible process. The major difference in a
process and a system is in its capabilities of providing flexibility to different situational
encounters. Flexible process possesses greater capabilities of adaptability.
Structured planning – structure planning based a project management life cycle enables
one to easily and conveniently work according to the plan.
Q4. What are the various steps in project monitoring and controlling a project?
The analysis charts can be used to monitor, control, track and execute a project. Typical
PERT/ CPM exercise of a project are worked out at the end of this sub unit- 9.2. The
various steps involved in monitoring and controlling a project from start to end are as
follows-
1. Perlirninary work- the team members understand the project plans, project stage
schedule, progress controls, tracking the dules. Summary of the members have to
understand the tolerances in any change and maintain a change control log. They must
realize the need and importance of quality for which they have to follow strictly quality
agendas. They must understand the stage status reposes, stage and reports, stage end
approval reports.
2. Project progress- The members must keep a track of the project progress and
communication the same to other related members of the project. They must monitor and
control project progress, through the use of regular check points, quality charts. Statistical
tables, control the quality factors which are likely to deviate from expected values as any
deviation may result in change to the stage she duel
3. Stage control- The manager must establish a project check paint cycle. For this suitable
stage version control procedure may be followed.
4. Resources- Plan the resources required for various stage of the project. Brief both the
project team and the key resources about the objectives of every stage, planned activities,
products, organization. Metrics and project controls.
5. Quality control- This is very important in any project: Quality control is possible if the
project member’s follow-
Schedule quality review, Agenda for quality review, conduct quality review and follow
up.
Progress control assesses- monitor performance, update schedule, update casts, Re-plan
stage schedule, conduct team status review etc.
Along with we create status report, create flash reports, project status reports etc.
7. Approvals - lastly, project sage reviews and the decisions taken and actions planned
need to be approved by the top management. The goals of such review are to improve
quality by finding defects and to improve productivity by finding defects in a cost
effective manner. The group review progress includes several stage like planning,
preparation and overview, a group review meeting and rework recommendation and
follow-up.
Reduction of inventory
Optimization of money flow cycle within the organization as well as to and from external
agencies.
A relatively new SCM option involves web based software with a browser interface.
Several electronic marketplaces for buying and selling goods and materials.
Ans : There is many steps which involved in SCM implementation are- Business
Process, sales and marketing. Logistics, costing, demand planning, trade- off analysis,
environmental requirement, process stability, integrated supply, supplier management,
product design, suppiers, customers, material specifications, etc.
Designing and working on a strategic logic for better growth through value invention.
Working out new value curve in the product development along with necessary break
point.
Using it to analyses markets and the economies in product design. Tine, customer, quality
of product and the concept of survival of fittest.
Group customer by need: Effective SCM groups, customer by tietinct service meeds
those particular segment.
Customize the logistics networks: In designing their logistics network, companies need to
focus on the service requirement and profit potential of the customer segments identified.
Listen to signals of market demand and plan accordingly- sales and operations planners
must monitor the entire supply chain to detect early warning signals of changing
customer demand and needs.
Differentiate the product closer to the customer-companies today no longer can afford to
stock pile inventory to compensate for possible forecasting errors, instead, they need to
postpone product differentiation in the manufacturing. Process closer to actual customer
demand.
Strategically manage the source of supply-by working closely with their key suppliers to
reduce the overall casts of owning materials and services; SCM maximizes profit margins
both for themselves, and their supplies.