From: (b) (6)

To: (b) (6) FLOSSMAN, LOREN (b


(b) (6)
Cc: (b) (6)
Subject: Re: Change request for H2-A/I1-B (Change Request #18)
Date: Monday, March 24, 2008 12:21:45 PM

(b)
(6)
I concur with the recommended change. There are no perceived additional environmental impacts that
have not already been addressed in the EA.

(b) (6)

-----Original Message-----
From:(b) (6)
To: (b) (6)
FLOSSMAN, LOREN
W(b) (6)

CC: (b) (6)


Sent: Sun Mar 23 19:38:08 2008
Subject: FW: Change request for H2-A/I1-B (Change Request #18)

All

Attached is PF225 change request #18, which involves the lowering of the proposed fence height of H2-
A and I-1B from 18 ft to 15ft. Both of these segments are PF225 contingency segments and existing VF.
A decision to proceed/not proceed with their conversion to PF will not likely be made until May at the
earliest. The projects would be design-bid-build. Materials would be supplied by Boeing. Please provide
me your comments by NLT COB Wednesday, March 26th.

Thanks

(b)
(6)
________________________________

From: (b) (6) ov]


Sent: Friday, March 21, 2008 1:55 PM
To: (b) (6) FLOSSMAN, LOREN W
Subject: FW: Change request for H2-A/I1-B

EPT is requesting to shorten the fence in the DNM areas.

________________________________

From:(b) (6)
Sent: Friday, March 21, 2008 1:04 PM
To: (b) (6)

Cc: (b) (6)


Subject: Change request for H2-A/I1-B

Attached for your consideration is a change request for PF-225 DNM projects H2-A and I1-B. DNM
would like to stay with 15’ tall fencing throughout their entire AOR.

Thanks,

(b)
(6)

FOS EPT/DNM

El Paso Sector TI Coordinator

(b) (6)