Orig Poway Wal-Mart Traffic Study 1990

You might also like

Download as pdf
Download as pdf
You are on page 1of 105
‘TRAFFIC IMPACT ANALYSIS: POWAY WAL-MART POWAY, CALIFORNIA Prepared for: SB&O 3615 Kearny Villa Road, Suite 201 San Diego, CA 92123 = Linscott, Law & Greenspan, Engineers EXECUTIVE SUMMARY ‘The proposed project is located on the south side of Hilleary Place, between Community Road and Midland Road in the City of Poway. oe ee The project is proposed to contain a155,000 square foot Wal-Mart store and two free standing restaurant/financial buildings. The project is expected to generate 14,900 ADT with 235 inbound/160 outbound trips during the morning peak hour and 725 inbound/725 outbound trips during the afternoon peak hour. Six key intersections were analyzed for the existing, existing plus related project and the ‘existing plus related project plus project conditions. The existing operations before the project are generally good except at the Community Road/Poway Road intersection (LOS D) The addition of traffic from the related project (Creekside Plaza) is calculated to have significant but mitigatable traffic impacts. The project will add @ measurable amount of traffic to the street system and cause Mepitcant impose a th key interecio Mitigation measures include street widenings, tg Linscott, Law & Greenspan, Engineers [ ‘TABLE OF CONTENTS Existing Plus Related Project Operations... Existing Plus Related Project Plus Project..

You might also like