Professional Documents
Culture Documents
Hyperion Web Analysis: Amit Sharma Hyperion Trainer
Hyperion Web Analysis: Amit Sharma Hyperion Trainer
Hyperion Web Analysis: Amit Sharma Hyperion Trainer
Amit Sharma
Hyperion Trainer
learnhyperion.wordpress.com
Creating Database connection
• The first step before creating a report is to create Database connection.
The Database connection is the direct link to access the data from database
and represent in form of reports. The data source for analyzer can be
• 1) Essbase 2) Financial Management 3) Sap BW 4) Relational DB
Creating Database connection.. Step 1
• The database connection is established using 4 steps.
• 1) Specify Server info.
• 2) Specify Database info.
• 3) Appling formatting.
Give Essbase server
• 4) Relation Drill-Through Name, username and password
•
Creating Database connection.. Step 2
Specify Data Source. We’ll specify the Data Source the one which we created in
previous slide.
Select one of the following database connections:
Analyzer Essbase
Analyzer Relational
Analyzer SAP BW
Analyzer HFM
Sample Report
Row Dimension
Page Dimension
Row Dimension 3D View
Qtr1 Qtr2 Qtr3 Qtr4
California 23
Ohio 6633
Illnois 3466
New York
California
Mac Texas
Ohio
Illnois
Creating Report using Report Wizard Step 2
Customizing filters
Creating Report using Report Wizard Step 3
Row Dimension
Report Advance Analysis
Checkbox selection
for scenario selection Browse Year
Dimension member
Implementation of
dynamically
Write back functionality Implementation of
Object 1 Table with Write back functionality
City
as Dropdown selection
Adding cell Notes
Double
click
on any
Insert cell note. Some description about the cell to
the given cell activate
cell
note
windows
• Sales for Florida Jan Month
Sales for Florida May Month
Adding Service Button to Reports
Using Sort operation Selecting of sort operation
Sorting Sales data based on Qtr2