EXCAVATION AND BASE PREPARATION

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
BASE SLAB REBAR AND CONCRETE
EXCAVATION AND BASE PREPARATION
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
5M X 5M OPENING IN CONCRETE WALL

WALL CONSTRUCTION
ROOF ERECTION
2- TOWER CRANES OUTSIDE
2-PLACER BOOM WITH CONC. PUMP & POURER LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
ROOF ERECTION
BASE VAPOUR BARRIER INSTALLATION
INSIDE CRANES TAKEN OUT
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
ROOF ERECTION
BASE VAPOUR BARRIER INSTALLATION

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
ROOF ERECTION
SUSPENDED DECK ERECTION
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
ROOF ERECTION
SUSPENDED DECK ERECTION ON STAGING

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
COMPRESSION PLATE INSTALLATION
ROOF ERECTION
SUSPENDED DECK ERECTION
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
COMPRESSION PLATE INSTALLATION
ROOF ERECTION
SUSPENDED DECK ERECTION

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
WALL CONSTRUCTION
COMPRESSION PLATE INSTALLATION
ROOF ERECTION
SUSPENDED DECK ERECTION
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSTALL AIRLIFT EQUIPMENT
COMPLETE AIR LIFT PREPARATION
KING POST REMOVED
ACCESS OPENING CLOSED

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
COMMENCE AIR LIFT

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
AIR LIFT

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
AIR LIFT COMPLETED
WELD ROOF TO
COMPRESSION PLATE
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSTALL AT THE ANNULAR SPACE OF 3.5 M WIDTH CONC. SCREED, FOAM BLOCK, SAND
SCREED,SECONDARY BOTTOM,
CRYOGENIC
RING BEAM, PAVING SLAB AND INNER TANK ANNULARS
ERECT ROOF WALKWAYS LNG TANK
POST TENSION TANK OUTER WALL
Erection Sequence
DEVELOPED BY P.S.Tomer
INSTALL AT THE ANNULAR SPACE OF 3.5 M WIDTH CONC. SCREED, FOAM BLOCK, SAND
SCREED,SECONDARY BOTTOM,
CRYOGENIC
RING BEAM, PAVING SLAB AND INNER TANK ANNULARS
ERECT ROOF WALKWAYS
POST TENSION TANK OUTER WALL
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSTALL AT THE ANNULAR SPACE OF 3.5 M WIDTH CONC. SCREED, FOAM BLOCK, SAND
SCREED,SECONDARY BOTTOM,
CRYOGENIC
RING BEAM, PAVING SLAB AND INNER TANK ANNULARS
ERECT ROOF WALKWAYS
POST TENSION TANK OUTER WALL
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
ERECT INNER TANK AND WALL VAPOUR BARRIER
INSTALL ROOF FITTINGS AND TANK INTERNALS
ERECT ROOF PLATFORMS
POST TENSION TANK OUTER WALL

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
ERECT INNER TANK SHELL AND VAPOUR BARRIER
COMPLETE BOTTOM INSULATION, SECONDARY BOTTOM AND
INNER TANK BOTTOM
INSTALL ROOF FITTINGS AND TANK INTERNALS
ERECT ROOF PLATFORMS
POST TENSION TANK OUTER WALL
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
ERECT INNER TANK AND VAPOUR BARRIER
INSTALL ROOF FITTINGS AND TANK INTERNALS
ERECT ROOF PLATFORMS
POST TENSION TANK OUTER WALL

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSTALL FOAM GLASS TO WALLS AND 36% NICKEL
INSTALL ROOF FITTINGS AND TANK INTERNALS
POST TENSION TANK OUTER WALL

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
COMMENCE HYDROTEST
INSTALL ELECTRICS
INSTALL PIPEWORK
INSTALL INSTRUMENTS

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
COMMENCE HYDROTEST
INSTALL ELECTRICS
INSTALL PIPEWORK
INSTALL INSTRUMENTS

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
PERFORM HYDROTEST
INSTALL ELECTRICS
INSTALL PIPEWORK
INSTALL INSTRUMENTS

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
PUMP OUT WATER AND CLEAN DOWN INNER TANK
INSTAL ELECTRICS
INSTAL PIPEWORK
INSTALL INSTRUMENTS
LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSULATE INNER TANK SHELL
INSULATE SUSPENDED DECK

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
INSULATE INNER TANK SHELL
INSULATE SUSPENDED DECK

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
FILL INTERSPACE WITH PERLITE

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer
COMMISSION TANK

LNG TANK
Erection Sequence
DEVELOPED BY P.S.Tomer