REKAPITULASI PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 04 sd LT. ATAP


PROYEK : BANGUNAN SAYAP KWK JAKSEL

Kolom
No. Lantai
K1 Uk. K2 Uk. K3 Uk. K4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi Panjang

1 Lantai 4 8.00 70 x 70 1.00 60 x 30 18.00 70 x 70 1.00 70 x 70 - - 40.84 258.40 408.82 112.00

2 Lantai 5 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 112.00

3 Lantai 6 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 112.00

4 Lantai 7 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 8,506.96 112.00

5 Lantai 8 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 112.00

6 Lantai 9 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 112.00

7 Lantai 10 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 5,956.36 112.00

8 Lantai Atap 8.00 30 x 30 2.00 30 x 30 17.00 30 x 30 - 30 x 30 17.00 2.00 10.53 140.40 3,313.62 117.00

Jumlah 64.00 9.00 143.00 7.00 17.00 2.00 252.25 1,860.40 56,083.45 901.00
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. ATAP
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla
Pembesian Besi
Dimensi Kolom (M) h Panjang (M) Berat (KG) Beton Begisting
Type Beton Panjang
No. Kolom Posisi Besi Jumlah Break Down Rata2
Kolom Lokasi Diameter Kolom
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) (KG) 70 x 70 60 x 60
(Bh)

1 K1 0.30 0.30 6.00 8 Main 22 8 6.88 55.04 2.98 164.23 4.32 57.60 1,583.73 366.60 48.00 - -
8.00 Ring 10 100 200 100 ### ### ### 1.14 54.72 0.62 33.73
8.00 Extra Hor - - - - - - - - 0.36 - - -
8.00 Extra Ver - - - - - - - - 0.36 - - -
2 K2 0.30 0.30 3.00 2 Main 22 8 3.88 31.04 2.98 92.62 0.54 7.20 223.19 413.31 6.00 - -
2.00 Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98
2.00 Extra Hor - - - - - - - - 0.36 - - -
2.00 Extra Ver - - - - - - - - 0.36 - - -
5 K11 0.30 0.30 3.00 17 Main 16 8 3.64 29.12 1.58 45.96 4.59 61.20 1,103.88 240.50 51.00 - -
### Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98
### Extra Hor - - - - - - - - 0.36 - - -
### Extra Ver - - - - - - - - 0.36 - - -
6 K12 0.30 0.30 6.00 2 Main 16 16 6.64 106.24 1.58 167.67 1.08 14.40 402.81 372.98 12.00 - -
2.00 Ring 10 100 200 100 ### ### ### 1.14 54.72 0.62 33.73
2.00 Extra Hor - - - - - - - - 0.36 - - -
2.00 Extra Ver - - - - - - - - 0.36 - - -
T O T A L 10.53 140.40 3,313.62 314.68 117.00 - -
Diameter
Dimensi Kolom
Berat Besi ( Kg )
60 x 30 50 x 50 50 x 30 60 x 60 30 x 30 60 x 60 25 22 19 16 13 10

- - - - 8.00 - - ### - - - -
- - - - - 269.88
- - - - - -
- - - - - -
- - - - 2.00 - - 185.24 - - - -
- - - - - 37.95
- - - - - -
- - - - - -
- - - - 17.00 - - - - 781.29 - -
- - - - - 322.59
- - - - - -
- - - - - -
- - - - 2.00 - - - - 335.34 - -
- - - - - 67.47
- - - - - -
- - - - - -
- - - - 29.00 - - ### - ### - 697.89
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 10
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla Pembesian
h Besi
Type Dimensi Kolom (M) Panjang (M) Berat (KG) Beton Begisting
No. Kolom Posisi Besi Jumlah Break Down Beton Rata2
Kolom Lokasi Diameter
Hor Ver Panjang (Bh) Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) (KG)

1 K1 0.50 0.50 4.00 8 Main 22 12 4.88 58.56 2.98 174.73 8.00 64.00 1,713.63 214.20
8.00 Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
8.00 Extra Hor - - - - - - - - 0.56 - - -
8.00 Extra Ver - - - - - - - - 0.56 - - -
2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 145.61 0.48 5.60 172.87 360.15
1.00 Ring 10 100 200 100 ### ### ### 1.34 44.22 0.62 27.26
1.00 Extra Hor - - - - - - - - 0.46 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.50 0.50 4.00 18 Main 22 12 4.88 58.56 2.98 174.73 18.00 144.00 3,855.66 214.20
### Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
### Extra Hor - - - - - - - - 0.56 - - -
### Extra Ver - - - - - - - - 0.56 - - -
4 K4 0.50 0.50 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 1.00 8.00 214.20 214.20
1.00 Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.56 - - -

T O T A L 27.48 221.60 5,956.36 216.75


Diameter
Panjang Dimensi Kolom
Berat Besi ( Kg )
Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - - - 8.00 - - - - ### - - - -


- - - - - 315.75
- - - - - -
- - - - - -
4.00 - - - - - - - - 145.61 - - - -
- - - - - 27.26
- - - - - -
- - - - - -
72.00 - - - 18.00 - - - - ### - - - -
- - - - - 710.43
- - - - - -
- - - - - -
4.00 - - - 1.00 - - - - 174.73 - - - -
- - - - - 39.47
- - - - - -
- - - - - - - - -
112.00 - - - 27.00 - - - - ### - - - ### ###OK
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 08 dan LT. 09
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla
Pembesian Besi
Dimensi Kolom (M) h Panjang (M) Berat (KG) Beton Begisting
Type Beton
No. Kolom Posisi Besi Jumlah Break Down Rata2
Kolom Lokasi Diameter
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) (KG)
(Bh)

1 K1 0.50 0.50 4.00 8 Main 22 16 4.88 78.08 2.98 ### 8.00 64.00 2,361.87 295.23
8.00 Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
8.00 Extra Hor 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
8.00 Extra Ver 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 ### 0.48 5.60 172.87 360.15
1.00 Ring 10 100 200 100 ### ### ### 1.34 44.22 0.62 27.26
1.00 Extra Hor - - - - - - - - 0.46 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.50 0.50 4.00 18 Main 22 16 4.88 78.08 2.98 ### 18.00 144.00 5,314.21 295.23
### Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
### Extra Hor 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
### Extra Ver 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
4 K4 0.50 0.50 4.00 1 Main 22 16 4.88 78.08 2.98 ### 1.00 8.00 295.23 295.23
1.00 Ring 10 100 200 100 ### ### ### 1.94 64.02 0.62 39.47
1.00 Extra Hor 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
1.00 Extra Ver 10 100 200 100 1 ### ### ### 0.56 18.48 0.62 11.39
T O T A L 27.48 221.60 8,144.19 296.37
* Catatan : Total di kalikan 2 untuk dua lantai
Diameter
Panjang Dimensi Kolom
Berat Besi ( Kg )
Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - - - 8.00 - - - - ### - - - -


- - - - - 315.75
- - - - - 91.14
- - - - - 91.14
4.00 - - - - - - - - 145.61 - - - -
- - - - - 27.26
- - - - - -
- - - - - -
72.00 - - - 18.00 - - - - ### - - - -
- - - - - 710.43
- - - - - 205.07
- - - - - 205.07
4.00 - - - 1.00 - - - - 232.98 - - - -
- - - - - 39.47
- - - - - 11.39
- - - - - - - - 11.39
112.00 - - - 27.00 - - - - ### - - - ###
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 07
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla Besi
Pembesian
Dimensi Kolom (M) h Panjang (M) Berat (KG) Beton Begisting
Type
No. Kolom Posisi Besi Jumlah Break Down Beton Rata2
Kolom Lokasi Diameter
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) (KG)
(Bh)

1 K1 0.60 0.60 4.00 8 Main 22 16 4.88 78.08 2.98 ### 11.52 76.80 2,459.53 213.50
8.00 Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
8.00 Extra Hor 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
8.00 Extra Ver 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 ### 0.60 6.40 206.07 343.44
1.00 Ring 10 100 200 100 ### ### ### 1.54 50.82 0.62 31.33
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.60 0.60 4.00 18 Main 22 16 4.88 78.08 2.98 ### 25.92 172.80 5,533.93 213.50
### Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
### Extra Hor 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
### Extra Ver 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
4 K4 0.60 0.60 4.00 1 Main 22 16 4.88 78.08 2.98 ### 1.44 9.60 307.44 213.50
1.00 Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
1.00 Extra Hor 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
1.00 Extra Ver 10 100 200 100 1 ### ### ### 0.66 21.78 0.62 13.43
T O T A L 39.48 265.60 8,506.96 215.48
Diameter
Panjang Dimensi Kolom
Berat Besi ( Kg )
Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - 8.00 - - - - - - ### - - - -


- - - - - 380.85
- - - - - 107.42
- - - - - 107.42
4.00 - - - - 1.00 1.00 1.00 - 174.73 - - - -
- - - - - 31.33
- - - - - -
- - - - - -
72.00 - 18.00 - - - - - - ### - - - -
- - - - - 856.91
- - - - - 241.69
- - - - - 241.69
4.00 - 1.00 - - - - - - 232.98 - - - -
- - - - - 47.61
- - - - - 13.43
1.00 1.00 1.00 - - - - - 13.43
112.00 - 27.00 - - 1.00 1.00 1.00 - ### - - - ### ###ERROR
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 05 dan LT. 06
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla Pembesian
h Besi
Type Dimensi Kolom (M) Panjang (M) Berat (KG) Beton Begisting
No. Kolom Posisi Besi Jumlah BREAK DOWN Beton Rata2
Kolom Lokasi Diameter
Hor Ver Panjang (Bh) Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) (KG)

1 K1 0.60 0.60 4.00 8 Main 22 20 4.88 97.60 2.98 ### 11.52 76.80 3,140.32 272.60
8.00 Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
8.00 Extra Hor 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85
8.00 Extra Ver 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85
2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 ### 0.60 6.40 206.07 343.44
1.00 Ring 10 100 200 100 ### ### ### 1.54 50.82 0.62 31.33
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.60 0.60 4.00 18 Main 22 20 4.88 97.60 2.98 ### 25.92 172.80 7,065.73 272.60
### Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
### Extra Hor 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85
### Extra Ver 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85
4 K4 0.60 0.60 4.00 1 Main 22 20 4.88 97.60 2.98 ### 1.44 9.60 392.54 272.60
1.00 Ring 10 100 200 100 ### ### ### 2.34 77.22 0.62 47.61
1.00 Extra Hor 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85
1.00 Extra Ver 10 100 200 100 2 ### ### ### 0.66 43.56 0.62 26.85

T O T A L 39.48 265.60 10,804.65 273.67

* Catatan : Total di kalikan 2 untuk dua lantai


PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 04
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla
h Pembesian Besi
Type Dimensi Kolom (M) Panjang (M) Berat (KG) Beton Begisting
No. Kolom Posisi Besi Jumlah Break Down Beton Rata2
Kolom Lokasi Diameter
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2) ( Kg )
(Bh)

1 K1 0.30 0.30 4.00 8 Main 22 20 4.88 97.60 2.98 ### 2.88 38.40 2,749.71 954.76
8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 0.62 23.19
8.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65
8.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65
2 K2 0.60 0.30 4.00 1 Main 22 14 4.88 68.32 2.98 ### 0.72 7.20 280.76 389.94
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.74 57.42 0.62 35.40
1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65
3 K3 0.70 0.70 4.00 18 Main 22 20 4.88 97.60 2.98 ### 35.28 201.60 7,358.69 208.58
### Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74
### Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
### Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
4 K4 0.70 0.70 4.00 1 Main 22 20 4.88 97.60 2.98 ### 1.96 11.20 408.82 208.58
1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74
1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
T O T A L 40.84 258.40 10,797.97 264.40
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 1 TOILET TAMBAHAN
PROYEK : BANGUNAN SAYAP KWK JAKSEL
Jumla
h Pembesian
Type Dimensi Kolom (M) Panjang (M) Berat (KG)
No. Kolom Posisi Besi Jumlah Break Down
Kolom Lokasi Diameter
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total
(Bh)

1 KT 1 0.30 0.30 4.00 4 Main 10 4 4.40 17.60 0.62 10.85


4.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 0.62 23.19
4.00 Extra Hor - - - - - - - - 0.36 - - -
4.00 Extra Ver - - - - - - - - 0.36 - - -
T O T A L
Besi Diameter
Beton Begisting Panjang Dimensi Kolom
Beton Rata2 Berat Besi ( Kg )
(M3) (M2) ( Kg ) Kolom 70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

1.44 19.20 136.17 94.56 16.00 - - - - - - - - - - - - 43.40


- - - - - 92.77
- - - - - -
- - - - - -
1.44 19.20 136.17 94.56 16.00 - - - - - - - - - - - - 136.17 ###OK