Download as pdf or txt
Download as pdf or txt
You are on page 1of 378
MHI WORK ORDER : 33402 / 50808-11 FLUOR DANIEL INTERCONTINENTAL, INC. JUBAIL UNITED PETROCHEMICAL COMPANY (UNITED) UNITED OLEFINS COMPLEX PROJECT PACKAGED BOILERS (PK-7104A/B/C/D) OPERATION AND MAINTENANCE MANUAL FOR BOILERS (BOOK-1: MAIN DESCRIPTION) FLUOR DANIEL INC. FLUOR DANIEL INC FOCoMMEE: Fete Recent FO TO BE COMPLETED BY SUPPLIER: Rev 4 ‘Aushorized by CONTRACT. 95700080 PO.NUMBER(Teppicable): _06700880-40501 First leeue: Yes !No EDR CODE(S: om 2. Quarta td Covet ond eit ITEMTAG NUMBER(S): __80-71014/8:0,D FE Fluor Daniol ie. Gontel eumbor Fest eave by Flucr Danial | uereaton to pci dine st slave ConmacrSupper of a the) ‘Sepa ory rd na ovata Prcace ret Ris WARNING 7 ‘This drawing at ell ae ang. snformation sista [1 Contained therwin shall be" the ols and property of Moubioht Hoawy A ‘poor witzen consent. of Mitsubishi ee) ‘eeuy Industoae Li you are allowed nether Fe—c) ty Belt hay ort ue the fr as ant ther parpobe than tha a opecfed therein 7a— a 7 A rae — cw] 1 MITSUBISHI HEAVY INDUSTRIES, LTD. YOKOHAMA DOCKYARD & MACHINERY WORKS SHEETS WITH COVER #0 fe oe PLANT AGINEERING SECTION |, cpcea] | Newwo FASTA) | sone systen encietnine oerartent|*°°| mt eT H.Yo shino Gna cuier oF [K. Katoh 1. Rovl Revised as por the Purchaser's comments Aperoveo | H.Yanagino wisToRY stenow Ley, Zé o [KPuii 2=2 eu ‘Nar 24 Jos orawn | KF 2 fp ows | 50608-11 || P6-011-451 _[it] Sor | 22 Mar. 2003 | onoer [ te L. INSTRUCTION MANUAL FOR BOILER wm a _RECORD OF CHANGES Revision | Tice No, Date Description Approved | Checked | 1, | July 01,’03 | 1) Change the organization as per the Purchaser’ s comments, 2) Add Instruction manual of FDF, GRF and burner. | 3) Add the reference dwes, of aux. equipment such as gear, one way clutch, coupling, bearings, silencer, stack and some instruments as | ATTACHMENT. $$ iT si Heavy inpusTR ies, L10, ————__________ 0.0 INSTRUCTION MANUAL FOR BOILER we IMPORTANT INFORMATION © This manual is intended for the use by operating and maintenance personal and must be accessible to them at all times. © Do not perform any operation or maintenance on this plant/equipment until the operators read and understand all instructions in this manual © Operators must comply with all applicable laws and regulation © Only qualified personnel should work on or around this system after becoming thoroughly familiar with all wamings, safety notices, and maintenance procedures contained herein. O MHI cannot anticipate every possible circumstance that might involve a potential hazard. The warnings in this manual and on the machine are therefore not all inclusive, © Improper operation or maintenance of this plant / machine can be dangerous and could result in injury or death. © Ifa procedure or work method or operating technique not specified in this manual is, used, the operators must satisfy themselves that it is safe for them and others. The operators should also ensure that the plant / machine will not be damaged or made unsafe by the method of operation or maintenance procedure they choose. O Should particular problems arise which are not covered sufficiently for the intended purposes, operators must refer to MHL © These manuals are placed at the operators’ disposal for their own use only and may not be copies, nor reproduced in hard copy or any electric medium. The copyright remains with MHI ————__________MIITSup st HEAVY INousTRIEs, LT), —————_______ 0-4

You might also like