This project charter outlines a process improvement project with the goals of reducing variability and improving quality metrics. Key details include the black belt leader, process owner, problem description and business metrics to be improved. Milestones cover the Define, Measure, Analyze, Improve, and Control phases with targets and actual completion dates to be tracked. The status is currently open with review points scheduled until the projected end date.
This project charter outlines a process improvement project with the goals of reducing variability and improving quality metrics. Key details include the black belt leader, process owner, problem description and business metrics to be improved. Milestones cover the Define, Measure, Analyze, Improve, and Control phases with targets and actual completion dates to be tracked. The status is currently open with review points scheduled until the projected end date.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This project charter outlines a process improvement project with the goals of reducing variability and improving quality metrics. Key details include the black belt leader, process owner, problem description and business metrics to be improved. Milestones cover the Define, Measure, Analyze, Improve, and Control phases with targets and actual completion dates to be tracked. The status is currently open with review points scheduled until the projected end date.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Black Belt : Project No : Status : Control Company/Plant : Product : Status Date : Process : Process Owner : Review Date : Champion : Master Black Belt : Last Review Date : Process team : Start Date : Problem Description : End Date : Metrics Y and Complementary Ys Business Metric(s) : Baseline Current Target 1 - 1 2 - 2 3 - 3 4 5 Z-Score Project Savings : - - Constraints / Special Conditions Preliminary Plan P h Target a Actual Date Date s e MileStones Define Measure Analyze Improve Control D 1 Team MSA 1st Level Cause Statistical Solution Monitoring M 2 Metrics Baseline Capability Optimum Solution Standardization A 3 Process Process Map Root Cause Implement Solution Train I 4 Charter X Shortlisting Validate Solution Maintain C