SETTING OUT OF SIMPLE CURVE Mainly divided into 2 heads: Linear methods High degree of accuracy not required. The curve is short. Angular methods / Instrument methods theodolite is used with or without Tape / chain.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
SETTING OUT OF SIMPLE CURVE Mainly divided into 2 heads: Linear methods High degree of accuracy not required. The curve is short. Angular methods / Instrument methods theodolite is used with or without Tape / chain.
SETTING OUT OF SIMPLE CURVE Mainly divided into 2 heads: Linear methods High degree of accuracy not required. The curve is short. Angular methods / Instrument methods theodolite is used with or without Tape / chain.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
SETTING OUT OF SIMPLE CURVE Mainly divided into 2 heads: Linear methods High degree of accuracy not required. The curve is short. Angular methods / Instrument methods theodolite is used with or without Tape / chain.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Linear methods High degree of accuracy not required. The curve is short.
Angular methods/ Instrument methods
Theodolite is used with or without Tape/chain.
Initials of Setting out
• Measuring Deflection Angle (∆) • Measuring Tangent Length (T) • Locating PC • Computing Length of the curve (l) • Deciding the Peg Interval • Calculating Chainage of PC • Calculating Chainage of PT • Length of 1st sub chord • Length of Last sub chord • Number of Full chords Linear Methods By ordinates or offsets from long chord By successive bisection of arcs By offsets from tangents By offsets from chord produced
Instrument Methods Rankins methods of tangential (or deflection) angle Two theodolite method Tacheometric method LO CAT