Professional Documents
Culture Documents
946x-Eca-Pr-P-00oo04 1 Material Requirement List Painting
946x-Eca-Pr-P-00oo04 1 Material Requirement List Painting
946X-ECA-PR-P-00OO04
SONATRACH
PROJET No. DOC. No. REV.
ACTIVITE AMONT / ENC DZ0233 1
SONATRACH
EXTENSION DE LA CENTRALE ELECTRIQUE D’ALRAR
ALRAR - ALGERIE
CONTRAT No. ENC 08 946X
DZ0233 1
OBJECT
The materials, systems and / or equipments will be supplied in full and strict accordance with the
following Technical Specifications/Project drawings.
With quotation and / or Purchase Order Acceptance, the Vendor will confirm to be informed and aware
about all material technical requirements, listed below or named inside the following documents.
SCOPE OF WORK
The Scope of Work and supply is the PAINTING relevant to the project en course “Extension de la
Centrale Electrique d’Alrar” – ALGERIA. During the engineering details the Supplier shall check the
project drawings/data sheets and confirm that all the data and dimensions are correctly shown and there
aren’t discrepancies among the project documentation and all the applicable codes (ASME, UNI EN ISO,
Client Std./Spec.). In case of conflict the Supplier shall inform by written Bonatti company for the right
review and action to be done.
REQUIREMENTS
Vendor shall fully comply with the applicable technical documents listed in Table 1 (Technical
Documentation Enclosed).
REV.
DOCUMENT NO. DOCUMENT TITLE
NO.
946X-ECA-ST-P-00OO03 SPECIFICATION POUR LA PEINTURE 1
QUANTITIES
Total : 300 Mq