STEPS INVOLVED IN TILES PREPARATION

CLAY

DERIVATIVE

COLORING/ PATTERNING
MOLDING BAKING & GLAZING
DETAILS LARGE TILES SMALL TILES

Time required for molding a batch of 100 18 min = 0.3 hr 15 min = 0.25 hr

Available time for molding in a week = 60 hrs

Time required for baking a batch of 100 0.27 hr 0.58 hr

Available time for baking in a week = 105 hrs

Time required for coloring/patterning/glazing a


0.16 hr 0.2 hr
batch of 100

Available time for coloring/patterning/glazing in a week = 40 hrs

Clay derivative required to produce a batch of 100 32.8 pounds 20 pounds

Maximum clay derivative available in a week = 6000 pounds

Profit earns from a batch of 100 $190 $240


DEFINING THE VARIABLES
Let x1 be the no: of batches of large, single
colored tiles produced (1 batch = 100 tiles)

Let x2 be the no: of batches of small, patterned


tiles produced (1 batch = 100 tiles)
OBJECTIVE FUNCTION
To maximize the profit:
Max Z= $190x1+$240x2
CONSTRAINTS
0.3x1+0.25x2 <= 60 (Molding time constraint)

0.27x1+0.58x2 <= 105 (Baking time constraint)

0.16x1+0.2x2 <= 40 (Glazing, coloring and


patterning time constraint)

32.8x1+20x2 <= 6000 (Clay quantity constraint)

x1,x2 >= 0 (Non-negative constraint)


SOLUTION
350

300

250240
0.3x1+0.25x2=60

200

molding time constraint


150

100

50

0
0 50 100 150 200 250 300 350 400 450 500
350

300

250240

200
181.03
molding time constraint
Baking time constraint
150
0.27x1+0.58x2=105

100

50

388.88
0
0 50 100 150 200 250 300 350 400 450 500
350

300

250240

200
181.034 molding time constraint
Baking time constraint
150 Glazing time constraint

100

50
0.16x1+0.2x2=40
250 388.88
0
0 50 100 150 200 250 300 350 400 450 500
350

300

250240

200 molding time constraint


181.034
Baking time constraint
Glazing time constraint
150
clay quantity constraints

100

50
32.8x1+20x2=6000
182.92 250 388.88
0
0 50 100 150 200 250 300 350 400 450 500
350

300

250240

200 molding time constraint


0,181.034
Baking time constraint
Glazing time constraint
150 56.7,
154.63 clay quantity constraints
100, 120

100
136.36, 76.36

50

182.92,0 250 388.88


0
0 50 100 150 200 250 300 350 400 450 500
PUTTING VALUES FOR x1 AND x2 TO MAXIMIZE PROFIT, Z

x1 x2 Z=
190X1+240X2
0 0 0
0 181.03 43447.2
56.7 154.63 47884.2
100 120 47800
136.36 76.36 44234.8
182.92 0 34754.8
THANK YOU