Professional Documents
Culture Documents
Stock Report For The Month of Feb. 2010
Stock Report For The Month of Feb. 2010
STOCK SUMMARY
Sr. No Item Description Item Sub Division Value Remarks
STEEL 8 MM 3,900.60
STEEL 10 MM 27,700.20
STEEL 12 MM 3,960.00
STEEL 14 MM 0.00
1 STEEL
STEEL 16MM 72,056.80
STEEL 20MM 19,800.00
STEEL 25MM 27,555.42
STEEL 32MM 39,600.00
Sub Total 194,573.02
2 Consumable Tool All tools & Spare Parts 12,499.18
3 Diesel 968.99
OPC Cement & White
4 12,570.93
Cement
5 Buliding,Plumbing ,Pvc, Chemical 79,211.66
Hollow Block, Sand, Kerbstone 39,594.92
Electrical ( fancy & Decorative Lights, DB, Wire, Breaker,
18,956.28
Earth Rod)
Hardwares 55153.36
Civil Materials Safety Item 18213.59
Paints
Marbles
Plant & Machinery Parts
Furnitures ( mirror), Architect Materials
Cleaning Materials & Acces Pvc Material
Sub Total 211,129.81
6 wood & plywood 20018.2
7 Sanitary Fitting 984700.99
8 Tiles 1604925.65
Grand Total 3,041,386.77
Store Officer
Al Fara'a Gen Cont Co LLc
Project : AL SAYEGH TOWER DATE :- 03/03/10
STOCK AS ON : 28.02.10
STOCK SUMMARY
SR. NO. Item Description Qty on Hand Unit Cost Amount
1 Hollow Block, Sand, Kerbstone
HOLLOW BLOCKS 10 X 20 X 40 CM 3,348.00 2.35 7,870.12
HOLLOW BLOCK 15 X 20 X 40 CM 1,008.00 2.60 2,620.80
SOLID BLOCKS 10 X 20 X 40 CM 5,940.00 3.30 19,602.00
SOLID BLOCKS 20 X 20 X 40 CM 1,478.00 4.30 6,377.80
SOLID BLOCKS 20 X 20 X 40 CM 378.00 4.40 1,663.20
BLACK SAND - TRAILER - AL RASH 15.00 48.00 720.00
WHITE WASHED SAND HASSAN AL 9.50 78.00 741.00
TOTAL :- 39,594.92