Professional Documents
Culture Documents
Ahrolif Engineering SDN BHD
Ahrolif Engineering SDN BHD
Base platform
Platform
Connection bar
Vibration inclined plate
Blower
Connection box Connection Pipe
Connection hose
Flexible duct
Flexible duct
Connection
Hose Platform
Blower
Connection
box
Base platform
PROBLEM
&
SOLUTION
Method of joint for connection box
Problem:
The sand will stuck at the middle of plate
The sand takes a long time to travel from the
vibration inclined plate to the connection box.
Finding :
1. Increase the bending angle of the vibration plate.
2. The higher angle of the inclined will produce a
higher force to the sand by the gravity to go down
from the top of vibration inclined plate to the
connection box.
3. Use high power rating of blower to help in move the
sand out.
4. But to increase the power rating of blower will
mean need to find out a new blower which will
increase the cost of the design.
5. Put vibrator at the top of plate.
6. The vibrator will add medium force to increase the
time travel of sand by reducing friction between
sand and vibration inclined plate. But in other mean,
it also will increase the cost of the design.
7. Design a new connector (connection pipe)
8. The most significant way to solve the problem but
need a new idea and will cost a time to fabricate the
new connector.
Solution: We decided to remove the connection box
and connect connection pipe directly to the blower.
Manufacturing engineer, Mr Akmal able to
construct a new connector from PVC pipe by adding
two smaller pipes inside the PVC pipe and connect it
with the plastic heavy duty glue.
Design Drawing (MEC 531)
Omitted