PLAN & PROCEDURE FOR CHANGING

OF S P M -2
• ARRANGE SHORE CRANE WITH CAPACITY OF 500 TO 600
TONS.
• TO HIRE SUITABLE BAGE FOR STORING THE SPARE S P M
WITH 50 TON CRANE .
• SAME BARGE TO BE USED FOR MOORING CHAIN
• A- TO LANCH BUOY WITH FLOATING CRANE .
• B- TO LANCH THE BUOY BY ENGINEERING .
• ONE SUITABLE HYDROLIC TRAILOR IS REQUIRED IN BOTH
THE IPTIONS.
Tuesday, December 7, 2
021
•THE DAY OF LAUNCHING IS RESTICTED TO TIDEL
WINDOW.
•ANCHOR SPARE S.P.M SAFELY NEAR LOLO
CHANNEL.
•FLUSH THE LINE WITH LAST TANKER AT S.P.M
APPOX. 15,000/20,000 CBM OF WATER. DRAW THE
SAMPLE WHILE FLUSHING
•SHUT 24” & 48” VALVE AT SPM-2
•SHUT 48” VALVE AT SPM-1.
•REMOVE MOORING HAWSERS ASSEMBLY.----4hrs
•INSTAL 3 FLOATS ON EACH STRINGS OF BUOY
END (INNER &OUTER) .--------------------------------2hrs

Tuesday, December 7, 2
021
•DISCONNECT FLOATING HOSE STRING INNER &
OUTER, AND BLANK BOTH THE STRINGS FROM BUOY
END. -------- ---------------------------------------------------------- 3 hrs
•BLANK J PIPING END.-------------------------------------1 hrs
•TOW THE STRING TO ANCHORAGE AREA--------------1 hr
•ANCHOR ONE END TO TRUSSHEL AND OTHER END WITH
TWO TON ANCHOR.------------------------------------------------2 hrs
•LOCK THE TURN TABLE.---------------------------------------2hrs
•MOOR DSV FOR REMOVAL OF SUB-SEA HOSE ON SHORE
STRING.------------------------------------------------------------------3 hrs.
•RIGGING FOR OPENING OF TOP CONNECTION.- ------4 hrs
•OPEN TOP CONNECTION & TAKE IT ON DSV DECK----4 hrs

Tuesday, December 7, 2
021
•RIGGING TO REMOVE BOTTOM CONNECTION .---------06 hrs.
•REMOVE BOTTOM CONNECTION .----------------------------06 hrs
•DISCONNECT ALL THE JOINT AND TAKE WHOLE STRING ON
THE DECKOF DSV. BLANK PLEM END.-----------------------4 hrs
•DISCONNECT ALL THE SUB-SEA HOSE FLOATS .--------06 hrs
•TRANSFER ALL THE SUB-SEA HOSES& FLOATS TO
BARGE.--------------------------------------------------------------------------------
----2hrs
•BLANK SPM END AND DE MOOR THE D S V .----------06 hrs
•MOOR THE DSV FOR REMOVEL OF SUB-SEA HOSE (OFF
SHORE) STRING -------------------------------------------------------04 hrs
•.OPEN TOP CNNECTION OF UMBLICAL .( SURFACE JOB)
•RIGGING FOR REMOVEL OF TOP CONNECTION.---------06 hrs
•REMOVE TOP CONNECTION OF SUB-SEA HOSE .---------06 hrs
Tuesday, December 7, 2
• BRING
021 THE TOP END ON D S V DECK . --------------------- 02 hrs
•RIGGING FOR REMOVING BOTTOM CONNECTION.------06 hrs
•OPEN BOTTOM CONNECTION OF HYD UMBLICAL-------06 hrs
•OPEN BOTTOM CONNECTION OF SUB-SEA HOSES-------06 hrs
•TAKE THE WHOLE STRING ON DECK. --------04 hrs
•REMOVE ALL THE BOUNCY FLOATS& DISCONNECT HYD
•UMBLICAL-----------------------------------------------------------------02 hrs
•BLANK PLEM AND SPM END .------------------------------------04 hrs.
•DEMOOR THE DSV.----------------------------------------------------03hrs
•MOBILIZE THE BARGE RAIL BARGE FOR SECURING THE
•MOORING CHAIN OF SPM .PAINT ALL TOP LINK ON SPM
•&LASH THE 2ND LINK AS A MARKER. --------------------------04
hrs
•MOBILIZE NEW SPM TO THE SITE.-----------------------------03 hrs
Tuesday, December 7, 2
•RIGGING
021 FOR REMOVING #6 & REMOVE #6-----------------06 hrs
•TAKE # 6 CHAIN TO THE NEW SPM AND SECURE.------06 hrs
•RIGGING & REMOVING # 3.-------------------------------------06 hrs
•TAKE THE # 3 CHAIN TO BARGE & SECURE--------- -----06 hrs
•RIGGING & REMOVING # 5.-------------------------------------03 hrs
•TAKE THE # 5 TO RAIL BARGE & SECURE.----------------03 hrs
•TIE A ROPE BETWEEN NEW SPM & BARGE IF REQUIRED.
•RIGGING & REMOVING OF # 2.--------------------------------03 hrs
•TAKE THE #2 CHAIN TO BARGE AND SECURE.----------03 hrs
•RIGGING & REMOVING # 4.------------------------------------03 hrs
•TAKE THE # 4 TO RAIL BARGE & SECURE.-------------03 hrs
•RIGGING & REMOVING # 1.-----------------------------------03 hrs
Tuesday, December 7, 2
021
•TAKE THE # 1 TO BARGE & SECURE.---------------03 hrs
•RIGGING & INSTALATION OF OF # 3-----------------03 hrs
•RIGGING & INSTALATION OF # 2-----------------------03 hrs
•RIGGING & INSTALATION OF # 1-----------------------03 hrs
•TOW THE SPM 2 FOR DRY DOCKING.(contract cell to arrange)
•BRING THE BUOY IN CENTER UP TO THE MARKING--12 hrs
•.ADJUST ALL THE CHAIN AS PER ORIGANAL ANGLE-12 hrs
•TRANSFER ONE SET OF NEW HOSES TO THE SITE.---6 hrs
•TRANSFER ONE SET SUB-SEA HOSE WITH ACCSORIES TO
•DSV.------------------------------------------------------------------------03 hrs
•MOOR THE DSV TO INSTALL THE ON SHORE SUB SEA -
•HOSE STRING.--------------------------------------------------------06
Tuesday, December 7, 2 hrs
021
•INSTALL THE SUB SEA HOSE FLOATS AS PER
SEQUENCE .---------------------------------------------06 hrs
•RIGGING FOR BOTTOM CONNECTION.----06 hrs
•LOWER THE BOTTOM HOSE & CONNECT THE
2ND HOSE.-----------------------------------------------02 hrs
•LOWER THE 2ND HOSE & CONNECT THE
THIRED HOES.-----------------------------------------02 hrs
•LOWER THE THIRED HOSE &CONNECT THE
TOP HOSE.-----------------------------------------------02 hrs
•MAKE THE BOTTOM CONNECTION.---------06 hrs
•INSERT THE GASKIT &TIGHT THE STUDS &
BOLTS .---------------------------------------------------06 hrs
•BLANK TOP END & PRESSURE TEST BOTTOM
END.-------------------------------------------------------06
Tuesday, December 7, 2 hrs
021
•RIGGING FOR TOP CONNECTION.--------------06 hrs
•MAKE TOP CONNECTION.-------------------------06 hrs
•INSERT THE GASKIT & PRESSURE TEST TOP &
BOTTOM CONNECTION.-----------------------------06 hrs
• DEMOOR DSV& TRANSFER ONE SET OF SUB-SEA
HOES WITH FLOATS & HYD UMBLICAL .-----06 hrs
• MOOR THE DSV TO INSTALL THE OF SHORE SUB-
SEA HOSE STRING (WITH UMBLICAL) -------06 hrs
• RIGGING FOR INSTALATION OF BOTTOM
CONNECTION.------------------------------------------06 hrs
•CONNECT TO HOSE TOGETHER PUT HYD
UMBLICAL & SECURE .-----------------------------06 hrs
•INSTALL SUBSEA FLOATS AS PER SEQUENCE-6 hrs
•Tuesday, December 7, 2
LOWAR BOTTOM HOSE & 2ND HOSE.------------03 hrs
021
•CONNECT 3RD & TOP HOSE.----------------------------03 hrs
•CONNECT THE HYD UMBLI CAL ON 3RD& TOP HOSE.-03 hrs
•LOWER THE HOSE & MAKE BOTTOM CONNECTION.--06 hrs
•INSERT THE GASKIT &PRESSURE TEST BOTTOM
•CONNECTION.-----------------------------------------------------------06
hrs
•RIGGING FOR TOP CONNECTION & MAKE
• CONNECTION.---------------------------------------------------------06 hrs
•INSERT THE GASKIT & PRESSURE TEST TOP & BOTTOM
•CONNECTION .CONNECT TOP & BOTTOM END OF HYD
•UMBLICAL .---------------------------------------------------------------12 hrs
•DE MOOR DSV & TOW FLOATING HOSE STRING TO
• SPM 2.----------------------------------------------------------------------06 hrs
•MAKE THE CONNECTION OF BOTH THE STRING.-------06 hrs
Tuesday, December 7, 2
•INSERT
021 THE GASKIT & TIGHT THE STUDS& BOLTS.---06 hrs
•PRESSURE TEST THE FLOAT ING HOSE STRING FROM SPM
DECK VALVE.-------------------------------------------------------------06 hrs
•PRESSURE TEST WHOLE SYSTOM FROM PLEM TO TANKER
RAIL END HOSE.---------------------------------------------------------03 hrs
•TRANSFER THE MOORING HAWSERS ASSEMBLY
• TO DSV DECK .--------------------------------------------------------03hrs
•MOOR DSV FOR INSTALLTHE MOORING HAWSERS
•ASSEMBLY. ---------------------------------------------------------------01 hrs
•INSTALL THE HAWSER ASSEMBLY.----------------------------06 hrs
•SPM 2 IS BACK ON SERVICE .