HVAC Floor wise as per DEC Input

Condenser 186080
Piping System 1073000
Motor 150588
Piping sysytem 87000
Motor and others 10000
Total in watts 1506668
Total in KW 1506.668

EVAPORATIVE COOLING THROUGH AIR WASHERS - TG BUILDING

1 Steam turbine Area 223.5 30.6 34 232529.4

2 Deaerator Bay 223.5 10 34 75990

ROOM IN TG HALL NOT TO BE COOLED THROUGH AIR WASHERS


COMPARATIVE STATEMENT FOR VENTILATION REQUIREMENT FOR TG BUILDING
Dt:28-09-10
VENTILATION REQ.BASED ON HEAT LOAD:

TG HALL CABLEVAULTS,SWICTH TOTAL HEAT AIR SUPPLY VOLUME


S.NO OWNER MW
KW GEAR ROOMS: KW KW CMH

1 LANCO AMARKANTAK PVT LTD 2X300 3400 1200 4600 1615679.0 16 Lakh

2 ESSAR POWER GUJARAT LTD 2X600 2220000 22 Lakh

3 ECEPL 2X660 8062 2831653.1 28 Lakh

VENTILATION REQ.BASED ON AIR CHANGE MEHTHOD:

OWNER MW LENGTH WIDHT HEIGHT AIR SUPPLY VOLUME

1 LANCO AMARKANTAK PVT LTD 2X300


TG Area (Grid A/B),Ele :0.00m. 100.5 27 34 92259
Dearator Bay,(Grid B/C)Ele :0.00m. 100.5 9 34 30753
SwicthGear Room (Grid C/D)Ele :6.30m. 81 12.5 5.5 5568.75
Cable Spreader Room (Grid C/D)Ele :3.60m. 81 12.5 2.7 2733.75
SwicthGear Room (Grid A/B)Ele :6.30m. 23 9 6.3 1304.1
132618.6 m^3
Air supply CMH 1856660.4 18 Lakh
2 ESSAR POWER GUJARAT LTD 2X600

3 ECEPL 2X660
TG Area (Grid A/B),Ele :0.00m. 223.5 30.6 34 232529.4
Dearator Bay,(Grid B/C)Ele :0.00m. 223.5 10 34 75990
308519.4 m^3
Air supply CMH 2159635.8 21 Lakh

Note:
In Lanco project,TG building Volume is governing factor,where as in ECEPL Heat Load from Equipments is governing factor.