House Boq
125 AT
CLIENT: MR. A.B.M ISMAIL
DESIGNED CONSULTANT: MR. SARJOON MOHAMED ISMAIL
ESTIMATED BOQ
SUBSTRUCTURE
1 Excavation
1.1 For Rubble work fdn Ft 230
1.2 For Column fdn No. 10
1.3 For Pit Sum 1
2 Lean Concrete
2.1 Under Rubble work fdn Ft 230
Aggregate Ft3 230 2 0.25
Sand Ft3
Cement Bag
3 Footing No. 10
Aggregate Ft3 3 3 1
Sand Ft3
Cement Bag
Re-Bar T12 No.
6 TieBeam
Brick work 4" wall bothside Ft 138 1.5 207
Brick work 8" wall bothside Ft 201 3 603
R/f & Con. work 4" high Ft 138
R/f & Con. work 8" high Ft 201
Aggregate Ft3
Sand Ft3
Cement Bag
Re-Bar T12 No.
Re-Bar R6 Kg
SUPERSTRUTURE
Ground Floor
10 Column No.
Aggregate Ft3 0.75 0.75 10
Sand Ft3
Cement Bag
Re-Bar T12 No.
Re-Bar R6 Kg
Steel set Formwork No.
22 Roof
Lower Roof Ft2
Upper Roof Ft2
USE ON PLOT NO. 125 AT HASIM ROAD, AKKARAIPATTU - 05
AIL
MATERIAL LABOUR
QTY UNIT PRICE AMOUNT QTY RATE AMOUNT
- 206.00 -
1.00 50,000.00
66.96 -
33.48 -
10.00 -
32.00 -
6.00 -
2.38 -
150.00 -
610.00
1,100.00 17.00 1,800.00 30,600.00
TOTAL
5,750.00
1,500.00
2,000.00
9,200.00
2,000.00
25,000.00
Incl.
2,000.00
8,050.00
6,160.00
1,890.00
6,300.00
14,175.00
-
-
-
-
50,000.00
10,000.00
2,000.00
25,000.00
20,000.00
76,200.00
38,100.00
Material Requirement
SUBSTRUCTURE
1 Rubbles Cube 10 9
2 Aggregate Cube 5 6
3 Sand Cube 6 6
4 Cement Bag 88 100
5 Re-Bar T12 Nr 152 150
6 Re-Bar R6 Kg 260 300
7 Re-Bar T10 Nr 6 10
8 Backfilling Cube 30 40
SUPERSTRUTURE
Ground Floor
5 80,000.00
8000 40,000.00
3000 6,000.00
750 56,250.00
250 12,500.00
50 17,500.00
200 30,000.00
50 62,500.00
5,000.00
Masons 250,000.00
food 50,000.00
Day - 1
1 Mark the FSL level on the wall from EFL - 2.5' & Transfer that level to Bompula pulla mathil
2 Break the column blocks in the Boundry Wall & keep one Block on the small length of fdn & Tie t
3 Tie the nool parallel to that nool at 4' ( not 4'9" ) better to keep permanantly make 2 kooni & cros
4 Set the thread right angle from 40' to this nool
5 Now start C/L nooling both side as per Drg.
6 Mark the column footing on the earth by neeru powder
7 Bottom of Excavation for Column is 5' 8"
8 Bottom of Excavation for RR masonry is 4' 2"
9 Near the Ladies enterance column footing size is 4'x4'
Day - 2
ompula pulla mathil
mall length of fdn & Tie the thread
ntly make 2 kooni & cross bar on that cross bar mark the nail