This document is an inspection test plan compliance record checklist for a concrete work project. It lists seven areas to check for compliance, including having the correct documentation and materials, site coordination, setting out, site work installation, transporting and placing concrete, finishing, and final handover documentation. The checklist ensures the subcontractor's concrete work meets specifications by checking items like footings, reinforcement, formwork, concrete testing, and finish. The subcontractor and main contractor must sign off that the inspection was completed.
This document is an inspection test plan compliance record checklist for a concrete work project. It lists seven areas to check for compliance, including having the correct documentation and materials, site coordination, setting out, site work installation, transporting and placing concrete, finishing, and final handover documentation. The checklist ensures the subcontractor's concrete work meets specifications by checking items like footings, reinforcement, formwork, concrete testing, and finish. The subcontractor and main contractor must sign off that the inspection was completed.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
This document is an inspection test plan compliance record checklist for a concrete work project. It lists seven areas to check for compliance, including having the correct documentation and materials, site coordination, setting out, site work installation, transporting and placing concrete, finishing, and final handover documentation. The checklist ensures the subcontractor's concrete work meets specifications by checking items like footings, reinforcement, formwork, concrete testing, and finish. The subcontractor and main contractor must sign off that the inspection was completed.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
INSPECTION TEST PLAN - COMPLIANCE RECORD CHECKLIST
PROJECT: SHEET No:
I.T.P. REFERENCE: ITP-40-SC TRADE NAME: CONCRETE WORK
ACTIVITY: SUBCONTRACTOR: AREA/LOCATION: DETAIL OF ACTIVITY BROKEN DOWN FOR YES NO COMMENTS CHECKING TO MEET COMPLIANCE 1. DOCUMENTATION Latest drawings and specifications in hand All client instructions issued are known 2. INCOMING PRODUCTS/MATERIALS Correct Type, Grade, Dimensions 3. SITE COORDINATION Safety Induction Facilities (Waste/Clean, Storage Access, Latrines) 4. SETTING OUT Surveyor Peg Locations and levels known 5. SITE WORK/INSTALLATION a] Footings and Pads Correct line and location Correct width and depth Any Piers correct size Structural Engineer inspected and approved b] White Ant Treatment All Areas Covered and Certified c] Moisture Barrier Correct Material used and no holes found d] Reinforcement Refer Appropriate Checklist e] Formwork All Plumb and in line All correct heights marked for pour Is formwork sufficiently braced All set-downs and rebates in place f] Transport and Place Concrete Test Cylinders and Slump Test made on supply Concrete placed to minimum depths and widths Compression Tests being carried out by accredited testing company g] Finishing Correct finish being applied, eg steel, wood towel Finish to Supervisor’s approval, including curing 6. FINAL AND HANDOVER Correct Levels, Embedded Items 7. POST COMPLETION DOCUMENTATION As Builts, Manuals, Certificates and Test Reports SUB CONTRACTOR: DATE: ……../…..../……. MAIN CONTRACTOR: DATE: ……../…..../…….