CROSS FUNCTIONAL SAFETY OBSERVATIONS Date: 21.08.

2010
Audit Period: 16.08.2010 to 21.08.2010

Date Area Visited Observation Action Traget Date

16.08.2010 Cooling Tower, GT floor & STG Floor Nil


WHRB#1, #2, #3

17.08.2010 BSDG
Switchyard Nil
Switchyard Control Room
Switchyard SWGR
Transformer Yard
HVAC S/Y and CCR

18.08.2010 Not Visited First member: On leave


Second member: Engaged with QC activities

RW pump D dismantled and opening covered


with taflon sheet. Some barricade should have
19.08.2010 DM Plant been provided to a avoid any accidents. MMD

Alum Hoist container loaded fully with Alum in


such a way, that there may be a chance of falling
Water Treatment Plant down while lifting. MMD
PTW issued on CEP#1 after checking the
Raw water pump house barricade

20.08.2010 Cooling tower Nil


Workshop, Canteen
DM make up pump House

21.08.2010 CW pump house Nil


CW chlorination Chemical house.

Member: Arun Narayan A.K.Joshi


Supdt. EM Engr. TQM

CC: 1 ES to GM(J) for information pl.

2 AGM (O&M) for information pl.

3 Safety Manager