Construction Safety Requirement VH
Construction Safety Requirement VH
CHUTKOI
Safety and Health Officer
Matterto be consider:
Pre-construction and construction
phase
Construction Phase
Restriction
or control on the use
Restriction
or control on the use
by the contractor of the client’s
by the contractor of the client’s
equipment
equipment
Consultation
between parties
prior to commencement of project
Arrangements for reporting,
recording and investigation of
injuries, diseases, and dangerous
occurrences
Method to ensure safe system of
work, use of permit to work
system and work method
Measure to ensure safe operation
of plant and machinery
Noise prevention and control
Fire prevention and protection
Measureto control hazardous
substance on site
Theprovision and use of Personal
Protective Equipment
Control of contractors Vehicles
Site Clearance Arrangement
Demolition control
Confined Space
Sub-contractor and visitors on site
Electrical safety
Emergency procedures
Fire prevention
Safety and Health Risk Assessment
Health Surveillance and Protection
Information, instruction and Training
Machinery and work equipment
Permit to work
Signage
Access and egress on site
Smoking at on site
Traffic management on site
Welding and (Hot work)
Work at height
Compress air
Work above ground
scaffold
movable platforms
ladders
Demolition operations
And others requirements to be in
compliance with Occupational Safety and
Health Act 2005
Ventilation and Temperature
Lighting
Sanitary Conveniences
Supply of Water ( Washing & Drinking)
Washing Facilities ( All Categories of Staff)
Accommodation for Clothing
Facilities for taking meals
Air receiver, Refrigeration Plants, Gas Plant,
in non-Flammable